This free survey is powered by
Create a Survey
Surveys
2016
September
F
Flextronic
Flextronic
0%
Exit Survey
1. For DOA Cases which are test’s need to be done before call closure?
Only Before_Repair
Only F/T
After_Stress Test
Only Q/C
2. When Shipping ROM test needs to be done?
Before call closure in flex link by technician
After call creation in flex link by technician
Both A & B
None of above
3. Shipping ROM test is done to check functionality of the device
True
False
4. In the sequence for shipping ROM test, first need to perform/select which of the test?
After_Stress Test
Q/C
F/T
Before_Repair
5. For accessories replacement shipping ROM test required?
True
False
6. Q/C test need to be done ______________.
Only for DOA case
After call closing in flex link
Before call closing in flex link
Before call creation in flex link
7. Shipping ROM test need to be done for which type of devices at CP End?
DOA Cases
Repair Cases
Replacement cases
All cases
8. Extract “Shipping ROM test tool.zip” file folder, which file Need to execute to install shipping ROM application/tool
AdbWinUsbApi.dll
Install.bat
AdbWinApi.dll
None of above
9. Types of ways to perform Shipping ROM tests using
Personal computer
SD/micro SD card
Both A&B
None of above
10. Which activity need to be done before shipping ROM test start up?
SIM and SD card are inserted
Wi-Fi is enable and connect to device
Both A&B
None of the above
11. Shipping ROM test Skip page will lead to Billing calls rejection.
True
False
12. If device required higher lever repair (Need to transfer to Backroom), which Tests need to be done by CP?
Before Repair
QA
Both A&B
None of above
13. Which Action need to be ensure before hand over the device to customer?
Shipping ROM test.
Factory reset after shipping ROM test.
Either A or B
None of the above
14. Shipping ROM tests are NOT considered or being rejected in following cases
If test done after call creation/ before closure in flex link.
If test done before call creation/after closure in flex link
If both test done (BR & QC)
None of the above.
15. Shipping ROM test not required in CP leave, if device received from flex Back Room.
True
False
Loading...
close
Loading...
Close
staticapp1.questionpro.net