Influence of WM technique on project cost
Influence of WM technique on project cost
0%
Exit Survey
What is the project you are currently working on?
Building construction
Residential construction
Highway construction
What is your role in the project?
Architect
Structural Engineer
Quantity Surveyor
Project Manager
Site Engineer
Planning Engineer
Other
According to you, which stage from the construction process acts as the main contributor to the construction waste build?
Design Stage
Construction stage
Defects liability stage
What are the main sources of construction waste? (There maybe multiple options)
Improper design specifications
Variations on the design once the construction process has commenced
Poor coordination during the design and construction stages
Lack of accuracy when taking measurements of the materials needed for the task
Poor storage of materials
Low quality of materials
Poor knowledge of handling materials by the laborers
Poor knowledge regarding waste management
Other
Kindly rate the importance of the following tasks in order to minimize
the production of waste? (1 being the least important and 8 being the
most important)
Having proper design specifications
-- Select --
1
2
3
4
5
6
7
8
9
Making sure that the client is completely satisfied with the design avoiding future design changes resulting in minimization of demolish waste production
-- Select --
1
2
3
4
5
6
7
8
9
Proper coordination of the design and construction stages
-- Select --
1
2
3
4
5
6
7
8
9
High accuracy when taking off measurements of the materials needed
-- Select --
1
2
3
4
5
6
7
8
9
Proper storage of materials in the allocated place
-- Select --
1
2
3
4
5
6
7
8
9
Using materials with a high standard hence high quality
-- Select --
1
2
3
4
5
6
7
8
9
Giving proper knowledge to the laborers regarding waste management
-- Select --
1
2
3
4
5
6
7
8
9
Proper use of waste management techniques
-- Select --
1
2
3
4
5
6
7
8
9
Use of sustainable construction techniques
-- Select --
1
2
3
4
5
6
7
8
9
According to you, what are the waste management techniques commonly used in Sri Lanka? (There may be multiple answers)
Prevention
Minimization
Reuse
Recycling
Disposal to land sites
Combustion
Energy Recovery
Which waste management technique is used at the project your involved in currently?
Prevention
Minimization
Reuse
Recycling
Disposal to land sites
Combustion
Energy Recovery
What are the precautions taken from your side to prevent or minimize the construction waste build at your site?
How do the current government policies influence in reducing waste production in the country
Less influential
Moderate
High influential
Is the project cost influenced by your choice of waste management technique?
Yes
No