This free survey is powered by

Masonry Life-Cycle Costing

A SURVEY ON THE LIFE-CYCLE COSTING OF RETROFIT OPTIONS IN (MASONRY) MEDIUM-SIZED OFFICE BUILDINGS
0%
Exit Survey
 
 
PROJECT DESCRIPTION


Dear Sir/Madam,

You are invited to participate in our survey on life-cycle costing of buildings. In this survey, respondents will be asked to complete a survey that asks questions about the respective life-cycle (same as whole-life) cost of simulated Building Configuration Permutations (BCP) as applied to medium-sized office buildings. The aim of the project is to obtain information on the most representative whole-life cost of retrofit options in medium-sized office buildings. It will take approximately 3 - 6 minutes to complete the questionnaire. For the purposes of this survey, a medium-sized office building is one, which is 3-storeys tall and has between 50,000 - 100,000 square feet (SF). A number of most common pictorial building configuration permutations (BCP) have been identified and by selecting the retrofit option which most resembles your building configuration will lead on to possible whole-life cost estimates.

Your participation in this study is completely voluntary. There are no foreseeable risks associated with this project. However, if you feel uncomfortable answering any questions, you can withdraw from the survey at any point. It is very important for us to learn your opinions.

Your survey responses will be strictly confidential and data from this research will be reported only in the aggregate. Your information will be coded and will remain confidential. If you have questions at any time about the survey or the procedures, you may contact Olubukola ("Bukky") Tokede at +447404268590 or by email at [email protected]. If required, please indicate if you would like to be kept up-to-date with developments on the research and we will be more than happy to share our findings with you. A space is provided at the end where this can be indicated.

Thank you very much for your time and help. Please start with the survey now by clicking on the Continue button below.


 
 
 
 
Which of the following job-descriptions best matches your role in relation to the medium-sized office building you are involved with? Please feel free to tick more than one.
 
Decision-Maker
 
Facility Manager
 
Designer - Architect or Engineer
 
Project Manager
 
Consultant
 
Contractor
 
Broker
 
Realtor
 
Other
 

 
 
* Please indicate the predominant material of which the office building you are involved with? The Masonry (MS) building has the following exterior wall construction: 1 inch of stucco 8 inch concrete masonry units R-6 continuous insulation 1/2 inch gypsum wallboard
 
Masonry
 
Other, If Steel, please go to http://www.steelretrofitwholelifecosting.questionpro.com
 
 
 
Which of the following classification best describes the status of the building you are involved with? Commissioning is the process of ensuring that a building performs according to its design intent and the needs of its owners and occupants (Anderson 1997)
 
Commissioned
 
Uncommissioned
 
 
 
Which of the following best describes the retrofit option embarked upon in the uncommissioned building, you are involved with?
 
25% Window Area
 
T-5 Lighting Improvements
 
High Efficiency Elevators and LED Lighting
 
Double panel window upgrade
 
 
 
Do you currently have a "Temperature Reset" strategy feature in this office building ?
 
Yes
 
No
 
 
 
Which of the building configuration permutations (BCP) best describes the retrofit option adopted as an energy conservation measure in the office building you are involved with? where "x" means feature is available?
P9
P10
P11
P12
P13
P14
P15
P16
P17
P18
P19
 
 
 
Does the office building you are involved with possess a "Smart Grid", as an energy conservation measure ?
 
Yes
 
No
 
 
 
Which of the building configuration permutations (BCP) best describes the retrofit option adopted as an energy conservation measure in the office building, you are involved with? where "x" means feature is available.
P64
P65
P66
P67
P68
P69
P70
P71
P72
P73
P74
P75
P76
P77
P78
P79
P80
P81
P82
P83
P84
P85
P86
P87
P88
P89
P90
P91
P92
P93
P94
P95
P96
P97
P98
P99
 
 
 
Which of the building configuration permutations (BCP) best describes the retrofit option adopted as an energy conservation measure in the office building you are involved with? where "x" means feature is available.
P20
P21
P22
P23
P24
P25
P26
P27
P28
P29
P30
P31
P32
P33
P34
P35
P36
P37
P38
P39
P40
P41
P42
P43
P44
P45
P46
P47
P48
P49
P50
P51
P52
P53
P54
P55
P56
P57
P58
P59
P60
P61
P62
P63
 
 
 
Given the option selected does the sum of $577,137 provide a fair estimate of the capital cost of the retrofitting carried out in your building?
 
Yes
 
If No, please provide a more representative estimate in the adjoining box
 
 
 
 
Given the option selected. does the sum of $16,142 provide a fair estimate of the Annual Maintenance cost of your building?
 
Yes
 
If No, please provide a more representative estimate in the adjoining box
 
 
 
 
Given the option selected, does the sum of $99,549 provide a fair estimate of the annual cost for Electrical and Gas Energy Usage for your building?
 
Yes
 
If No, please provide a more representative estimate in the adjoining box
 
 
 
 
Could you please indicate the number of years since your building has been retrofitted to comply with the selected building configuration permutation to the nearest 5-year period.?
Please select the earlier year if in-between ranges
 
5
 
10
 
15
 
20
 
25
 
Other
 
 
 
 
In your opinion, which of the following numerical estimates best indicates the overall cost that has been expended (in present-value terms) on your building for the Initial retrofitting, Maintenance and Utilities (i.e. Electricity and Gas) over the last 5-year period of its life?
 
$1,059,554
 
$1,060,834
 
$1,085,083
 
$1,141,203
 
$1,250,271
 
If none, please provide a more appropriate estimate in the adjoining box
 
 
 
 
In your opinion, which of the following numerical estimates best indicates the overall cost that has been expended (in present-value terms) on your building for the Initial retrofitting, Maintenance and Utilities (i.e. Electricity and Gas) over the last 10-year period of its life?
 
$1,249,823
 
$1,274,890
 
$1,305,610
 
$1,331,526
 
$1,809,746
 
If none, please provide a more appropriate estimate in the adjoining box
 
 
 
 
In your opinion, which of the following numerical estimates best indicates the overall cost that has been expended (in present-value terms) on your building for the Initial retrofitting, Maintenance and Utilities (i.e Electricity and Gas) over the last 15-year period of its life?
 
$1,286,414
 
$1,512,239
 
$1,576,049
 
$1,596,789
 
$2,527,596
 
If none, please provide a more appropriate estimate in the adjoining box
 
 
 
 
In your opinion, which of the following numerical estimates best indicates the overall cost that has been expended (in present-value terms) on your building for the Initial retrofitting, Maintenance and Utilities (i.e Electricity and Gas) over the last 20-year period of its life?
 
$1,253,324
 
$1,467,306
 
$1,527,690
 
$1,536,610
 
$3,250,709
 
If none, please provide a more appropriate estimate in the adjoining box
 
 
 
 
In your opinion, which of the following numerical estimates best indicates the overall cost that has been expended (in present-value terms) on your building for the Initial retrofitting, Maintenance and Utilities (i.e Electricity and Gas) over the last 25-year period of its life?
 
$1,226,365
 
$1,505,663
 
$1,569,983
 
$1,582,188
 
$3,750,909
 
If none, please provide a more appropriate estimate in the adjoining box
 
 
 
 
Given the option selected does the sum of $611,939 provide a fair estimate of the capital cost of the retrofitting carried out in your building?
 
Yes
 
If No, please provide a more representative estimate in the adjoining box
 
 
 
 
Given the option selected. does the sum of $8,760 provide a fair estimate of the Annual Maintenance cost of your building?
 
Yes
 
If No, please provide a more representative estimate in the adjoining box
 
 
 
 
Given the option selected, does the sum of $88,288 provide a fair estimate of the annual cost for Electrical and Gas Energy Usage for your building?
 
Yes
 
If No, please provide a more representative estimate in the adjoining box
 
 
 
 
Could you please indicate the number of years since your building has been retrofitted to comply with the selected building configuration permutation to the nearest 5-year period?
Please select the earlier year if in-between ranges
 
5
 
10
 
15
 
20
 
25
 
Other
 
 
 
In your opinion, which of the following numerical estimates best indicates the overall cost that has been expended (in present-value terms) on your building for the Initial retrofitting, Maintenance and Utilities (i.e. Electricity and Gas) over the last 5-year period of its life?
 
$1,016,621
 
$1,017,695
 
$1,038,037
 
$1,085,114
 
$1,176,607
 
If none, please provide a more appropriate estimate in the adjoining box
 
 
 
 
In your opinion, which of the following numerical estimates best indicates the overall cost that has been expended (in present-value terms) on your building for the Initial retrofitting, Maintenance and Utilities (i.e Electricity and Gas) over the last 10-year period of its life?
 
$1,169,508
 
$1,190,286
 
$1,215,749
 
$1,237,230
 
$1,633,612
 
If none, please provide a more appropriate estimate in the adjoining box
 
 
 
 
In your opinion, which of the following numerical estimates best indicates the overall cost that has been expended (in present-value terms) on your building for the Initial retrofitting, Maintenance and Utilities (i.e Electricity and Gas) over the last 15-year period of its life?
 
$1,199,595
 
$1,386,698
 
$1,439,566
 
$1,456,750
 
$2,227,949
 
If none, please provide a more appropriate estimate in the adjoining box
 
 
 
 
In your opinion, which of the following numerical estimates best indicates the overall cost that has been expended (in present-value terms) on your building for the Initial retrofitting, Maintenance and Utilities (i.e Electricity and Gas) over the last 20-year period of its life?
 
$1,172,179
 
$1,367,306
 
$1,406,890
 
$1,427,690
 
$2,827,068
 
If none, please provide a more appropriate estimate in the adjoining box
 
 
 
 
In your opinion, which of the following numerical estimates best indicates the overall cost that has been expended (in present-value terms) on your building for the Initial retrofitting, Maintenance and Utilities (i.e Electricity and Gas) over the last 25-year period of its life?
 
$1,148,597
 
$1,432,634
 
$1,745,632
 
$1,839,066
 
$3,235,405
 
If none, please provide a more appropriate estimate in the adjoining box
 
 
 
 
Given the option selected does the sum of $795,236 provide a fair estimate of the retrofitting carried out in your building?
 
Yes
 
If No, please provide a more representative estimate in the adjoining box
 
 
 
 
Given the option selected. does the sum of $4,206 provide a fair estimate of the Annual Maintenance cost of your building?
 
Yes
 
If No, please provide a more representative estimate in the adjoining box
 
 
 
 
Given the option selected, does the sum of $80,455 provide a fair estimate of the annual cost for Electrical and Gas Energy Usage for your building?
 
Yes
 
If No, please provide a more representative estimate in the adjoining box
 
 
 
 
Could you please indicate the number of years since your building has been retrofitted to comply with the selected building configuration permutation to the nearest 5-year period?
Please select the earlier year if in-between ranges
 
5
 
10
 
15
 
20
 
25
 
Other
 
 
 
 
In your opinion, which of the following numerical estimates best indicates the overall cost that has been expended (in present-value terms) on your building for the Initial retrofitting, Maintenance and Utilities (i.e. Electricity and Gas) over the last 5-year period of its life?
 
$1,148,263
 
$1,083,921
 
$1,149,199
 
$1,166,945
 
$1,287,827
 
If none, please provide a more appropriate estimate in the adjoining box
 
 
 
 
In your opinion, which of the following numerical estimates best indicates the overall cost that has been expended (in present-value terms) on your building for the Initial retrofitting, Maintenance and Utilities (i.e. Electricity and Gas) over the last 10-year period of its life?
 
$1,276,649
 
$1,294,588
 
$1,316,573
 
$1,335,121
 
$1,677,362
 
If none, please provide a more appropriate estimate in the adjoining box
 
 
 
 
In your opinion, which of the following numerical estimates best indicates the overall cost that has been expended (in present-value terms) on your building for the Initial retrofitting, Maintenance and Utilities (i.e. Electricity and Gas) over the last 15-year period of its life?
 
$1,302,352
 
$1,463,812
 
$1,509,434
 
$1,524,263
 
$2,189,769
 
If none, please provide a more appropriate estimate in the adjoining box
 
 
 
 
In your opinion, which of the following numerical estimates best indicates the overall cost that has been expended (in present-value terms) on your building for the Initial retrofitting, Maintenance and Utilities over the last 20-year period of its life?
 
$1,278,694
 
$1,431,686
 
$1,474,859
 
$1,481,237
 
$2,706,777
 
If none, please provide a more appropriate estimate in the adjoining box
 
 
 
 
In your opinion, which of the following numerical estimates best indicates the overall cost that has been expended (in present-value terms) on your building for the Initial retrofitting, Maintenance and Utilities over the last 25-year period of its life?
 
$1,148,597
 
$1,432,634
 
$1,745,632
 
$1,839,066
 
$3,235,405
 
If none, please provide a more appropriate estimate in the adjoining box
 
 
 
 
Given the option selected does the sum of $763,036 provide a fair estimate of the capital cost of the retrofitting carried out in your building?
 
Yes
 
If No, please provide a more representative estimate in the adjoining box
 
 
 
 
Given the option selected. does the sum of $16,142 provide a fair estimate of the Annual Maintenance cost of your building?
 
Yes
 
If No, please provide a more representative estimate in the adjoining box
 
 
 
 
Given the option selected, does the sum of $93,992 provide a fair estimate of the annual cost for Electrical and Gas Energy Usage for your building
 
Yes
 
If No, please provide a more representative estimate in the adjoining box
 
 
 
 
Could you please indicate the number of years since your building has been retrofitted to comply with the selected building configuration permutation to the nearest 5-year period?
Please select the earlier year if in-between ranges
 
5
 
10
 
15
 
20
 
25
 
Other
 
 
 
 
In your opinion, which of the following numerical estimates best indicates the overall cost that has been expended (in present-value terms) on your building for the Initial retrofit, Maintenance and Utilities (i.e. Electricity and Gas) over the last 5-year period of its life?
 
$1,222,280
 
$1,223,498
 
$1,246,583
 
$1,300,008
 
$1,403,836
 
If none, please provide a more appropriate estimate in the adjoining box
 
 
 
 
In your opinion, which of the following numerical estimates best indicates the overall cost that has been expended (in present-value terms) on your building for the Initial retrofitting, Maintenance and Utilities (i.e. Electricity and Gas) over the last 10-year period of its life?
 
$1,406,467
 
$1,430,444
 
$1,459,828
 
$1,484,617
 
$1,942,039
 
If none, please provide a more appropriate estimate in the adjoining box
 
 
 
 
In your opinion, which of the following numerical estimates best indicates the overall cost that has been expended (in present-value terms) on your building for the Initial retrofitting, Maintenance and Utilities (i.e Electricity and Gas) over the last 15-year period of its life?
 
$1,442,752
 
$1,659,165
 
$1,720,315
 
$1,740,191
 
$2,632,204
 
If none, please provide a more appropriate estimate in the adjoining box
 
 
 
 
In your opinion, which of the following numerical estimates best indicates the overall cost that has been expended (in present-value terms) on your building for the Initial retrofitting, Maintenance and Utilities (i.e. Electricity and Gas) over the last 20-year period of its life?
 
$1,411,041
 
$1,616,104
 
$1,673,972
 
$1,682,521
 
$3,325,178
 
If none, please provide a more appropriate estimate in the adjoining box
 
 
 
 
In your opinion, which of the following numerical estimates best indicates the overall cost that has been expended (in present-value terms) on your building for the Initial retrofitting, Maintenance and Utilities (i.e. Electricity and Gas) over the last 25-year period of its life?
 
$1,384,981
 
$1,714,160
 
$2,021,706
 
$2,125,440
 
$3,803,435
 
If none, please provide a more appropriate estimate in the adjoining box
 
 
 
 
Given the option selected does the sum of $577,137 provide a fair estimate of the capital cost of the retrofitting carried out in your building?
 
Yes
 
If No, please provide a more representative estimate in the adjoining box
 
 
 
 
Given the option selected. does the sum of $16,142 provide a fair estimate of the Annual Maintenance cost of your building?
 
Yes
 
If No, please provide a more representative estimate in the adjoining box
 
 
 
 
Given the option selected, does the sum of $92,875 provide a fair estimate of the annual cost for Electrical and Gas Energy Usage for your building?
 
Yes
 
If No, please provide a more representative estimate in the adjoining box
 
 
 
 
Could you please indicate the number of years since your building has been retrofitted to comply with the selected building configuration permutation to the nearest 5-year period?
Please select the earlier year if in-between ranges
 
5
 
10
 
15
 
20
 
25
 
Other
 
 
 
 
In your opinion, which of the following numerical estimates best indicates the overall cost that has been expended (in present-value terms) on your building for the Initial retrofitting, Maintenance and Utilities (i.e. Electricity and Gas) over the last 5-year period of its life?
 
$1,031,726
 
$1,032,931
 
$1,055,782
 
$1,108,665
 
$1,211,441
 
If none, please provide a more appropriate estimate in the adjoining box
 
 
 
 
In your opinion, which of the following numerical estimates best indicates the overall cost that has been expended (in present-value terms) on your building for the Initial retrofitting, Maintenance and Utilities (i.e. Electricity and Gas) over the last 10-year period of its life?
 
$1,213,340
 
$1,237,048
 
$1,266,102
 
$1,290,612
 
$1,742,896
 
If none, please provide a more appropriate estimate in the adjoining box
 
 
 
 
In your opinion, which of the following numerical estimates best indicates the overall cost that has been expended (in present-value terms) on your building for the Initial retrofitting, Maintenance and Utilities (i.e. Electricity and Gas) over the last 15-year period of its life?
 
$1,248,634
 
$1,462,432
 
$1,522,842
 
$1,542,478
 
$2,423,706
 
If none, please provide a more appropriate estimate in the adjoining box
 
 
 
 
In your opinion, which of the following numerical estimates best indicates the overall cost that has been expended (in present-value terms) on your building for the Initial retrofitting, Maintenance and Utilities (i.e. Electricity and Gas) over the last 20-year period of its life?
 
$1,217,308
 
$1,419,891
 
$1,477,060
 
$1,485,505
 
$3,108,303
 
If none, please provide a more appropriate estimate in the adjoining box
 
 
 
 
In your opinion, which of the following numerical estimates best indicates the overall cost that has been expended (in present-value terms) on your building for the Initial retrofitting, Maintenance and Utilities (i.e Electricity and Gas) over the last 25-year period of its life?
 
$1,191,808
 
$1,517,136
 
$1,825,830
 
$1,928,741
 
$3,581,975
 
If none, please provide a more appropriate estimate in the adjoining box
 
 
 
 
Given the option selected does the sum of $1,100,638 provide a fair estimate of the capital cost of the retrofitting carried out in your building?
 
Yes
 
If No, please provide a more representative estimate in the adjoining box
 
 
 
 
Given the option selected. does the sum of $16,142 provide a fair and current estimate of the Annual Maintenance cost of your building?
 
Yes
 
If No, please provide a more representative estimate in the adjoining box
 
 
 
 
Given the option selected, does the sum of $92,882 provide a fair estimate of the annual cost for Electrical and Gas Energy Usage for your building?
 
Yes
 
If No, please provide a more representative estimate in the adjoining box
 
 
 
 
Could you please indicate the number of years since your building has been retrofitted to comply with the selected building configuration permutation to the nearest 5-year period?
Please select the earlier year if in-between ranges
 
5
 
10
 
15
 
20
 
25
 
Other
 
 
 
 
In your opinion, which of the following numerical estimates best indicates the overall cost that has been expended (in present-value terms) on your building for the Initial retrofitting, Maintenance and Utilities (i.e. Electricity and Gas) over the last 5-year period of its life?
 
$1,555,255
 
$1,556,460
 
$1,579,313
 
$1,632,199
 
$1,734,981
 
If none, please provide a more appropriate estimate in the adjoining box
 
 
 
 
In your opinion, which of the following numerical estimates best indicates the overall cost that has been expended (in present-value terms) on your building for the Initial retrofitting, Maintenance and Utilities (i.e Electricity and Gas) over the last 10-year period of its life?
 
$1,736,868
 
$1,760,549
 
$1,789,603
 
$1,814,144
 
$2,266,447
 
If none, please provide a more appropriate estimate in the adjoining box
 
 
 
 
In your opinion, which of the following numerical estimates best indicates the overall cost that has been expended (in present-value terms) on your building for the Initial retrofitting, Maintenance and Utilities (i.e. Electricity and Gas) over the last 15-year period of its life?
 
$1,772,157
 
$1,985,961
 
$2,046,374
 
$2,066,010
 
$2,947,267
 
If none, please provide a more appropriate estimate in the adjoining box
 
 
 
 
In your opinion, which of the following numerical estimates best indicates the overall cost that has been expended (in present-value terms) on your building for the Initial retrofitting, Maintenance and Utilities (i.e Electricity and Gas) over the last 20-year period of its life?
 
$1,740,829
 
$1,943,420
 
$2,000,590
 
$2,009,035
 
$3,631,886
 
If none, please provide a more appropriate estimate in the adjoining box
 
 
 
 
In your opinion, which of the following numerical estimates best indicates the overall cost that has been expended (in present-value terms) on your building for the Initial retrofitting, Maintenance and Utilities (i.e Electricity and Gas) over the last 25-year period of its life?
 
$1,715,331
 
$2,040,671
 
$2,349,450
 
$2,452,372
 
$4,105,584
 
If none, please provide a more appropriate estimate in the adjoining box
 
 
 
 
Given the option selected does the sum of $1,101,444 provide a fair estimate of the capital cost of the retrofitting carried out in your building?
 
Yes
 
If No, please provide a more representative estimate in the adjoining box
 
 
 
 
Given the option selected. does the sum of $8,760 provide a fair estimate of the Annual Maintenance cost of your building?
 
Yes
 
If No, please provide a more representative estimate in the adjoining box
 
 
 
 
Given the option selected, does the sum of $76,039 provide a fair estimate of the annual cost for Electrical and Gas Energy Usage for your building?
 
Yes
 
If No, please provide a more representative estimate in the adjoining box
 
 
 
 
Could you please indicate the number of years since your building has been retrofitted to comply with the selected building configuration permutation to the nearest 5-year period?
Please select the earlier year if in-between ranges
 
5
 
10
 
15
 
20
 
25
 
Other
 
 
 
 
In your opinion, which of the following numerical estimates best indicates the overall cost that has been expended (in present-value terms) on your building for the Initial retrofitting, Maintenance and Utilities (i.e. Electricity and Gas) over the last 5-year period of its life?
 
$1,455,047
 
$1,455,985
 
$1,473,759
 
$1,514,895
 
$1,594,839
 
If none, please provide a more appropriate estimate in the adjoining box
 
 
 
 
In your opinion, which of the following numerical estimates best indicates the overall cost that has been expended (in present-value terms) on your building for the Initial retrofitting, Maintenance and Utilities (i.e Electricity and Gas) over the last 10-year period of its life?
 
$1,586,257
 
$1,604,323
 
$1,626,464
 
$1,645,142
 
$1,989,801
 
If none, please provide a more appropriate estimate in the adjoining box
 
 
 
 
In your opinion, which of the following numerical estimates best indicates the overall cost that has been expended (in present-value terms) on your building for the Initial retrofitting, Maintenance and Utilities (i.e Electricity and Gas) over the last 15-year period of its life?
 
$1,609,981
 
$1,771,893
 
$1,817,643
 
$1,832,513
 
$2,499,882
 
If none, please provide a more appropriate estimate in the adjoining box
 
 
 
 
In your opinion, which of the following numerical estimates best indicates the overall cost that has been expended (in present-value terms) on your building for the Initial retrofitting, Maintenance and Utilities (i.e Electricity and Gas) over the last 20-year period of its life?
 
$1,586,256
 
$1,739,676
 
$1,782,971
 
$1,789,366
 
$3,018,338
 
If none, please provide a more appropriate estimate in the adjoining box
 
 
 
 
In your opinion, which of the following numerical estimates best indicates the overall cost that has been expended (in present-value terms) on your building for the Initial retrofitting, Maintenance and Utilities (i.e Electricity and Gas) over the last 25-year period of its life?
 
$1,566,979
 
$1,813,374
 
$2,102,339
 
$2,184,828
 
$3,377,226
 
If none, please provide a more appropriate estimate in the adjoining box
 
 
 
 
Given the option selected does the sum of $1,284,741 provide a fair estimate of the capital cost of the retrofitting carried out in your building?
 
Yes
 
If No, please provide a more representative estimate in the adjoining box
 
 
 
 
Given the option selected. does the sum of $4,206 provide a fair estimate of the Annual Maintenance cost of your building?
 
Yes
 
If No, please provide a more representative estimate in the adjoining box
 
 
 
 
Given the option selected, does the sum of $65,672 provide a fair estimate of the annual cost for Electrical and Gas Energy Usage for your building?
 
Yes
 
If No, please provide a more representative estimate in the adjoining box
 
 
 
 
Could you please indicate the number of years since your building has been retrofitted to comply with the selected building configuration permutation to the nearest 5-year period?
Please select the earlier year if in-between ranges
 
5
 
10
 
15
 
20
 
25
 
Other
 
 
 
 
In your opinion, which of the following numerical estimates best indicates the overall cost that has been expended (in present-value terms) on your building for the Initial retrofitting, Maintenance and Utilities (i.e Electricity and Gas) over the last 5-year period of its life?
 
$1,576,125
 
$1,576,898
 
$1,591,545
 
$1,625,442
 
$1,691,320
 
If none, please provide a more appropriate estimate in the adjoining box
 
 
 
 
In your opinion, which of the following numerical estimates best indicates the overall cost that has been expended (in present-value terms) on your building for the Initial retrofitting, Maintenance and Utilities (i.e Electricity and Gas) over the last 10-year period of its life?
 
$1,678,724
 
$1,693,406
 
$1,711,398
 
$1,726,577
 
$2,006,664
 
If none, please provide a more appropriate estimate in the adjoining box
 
 
 
 
In your opinion, which of the following numerical estimates best indicates the overall cost that has been expended (in present-value terms) on your building for the Initial retrofitting, Maintenance and Utilities (i.e Electricity and Gas) over the last 15-year period of its life?
 
$1,697,005
 
$1,828,265
 
$1,865,354
 
$1,877,409
 
$2,418,437
 
If none, please provide a more appropriate estimate in the adjoining box
 
 
 
 
In your opinion, which of the following numerical estimates best indicates the overall cost that has been expended (in present-value terms) on your building for the Initial retrofitting, Maintenance and Utilities (i.e Electricity and Gas) over the last 20-year period of its life?
 
$1,677,772
 
$1,802,148
 
$1,837,246
 
$1,842,431
 
$2,838,743
 
If none, please provide a more appropriate estimate in the adjoining box
 
 
 
 
In your opinion, which of the following numerical estimates best indicates the overall cost that has been expended (in present-value terms) on your building for the Initial retrofitting, Maintenance and Utilities (i.e Electricity and Gas) over the last 25-year period of its life?
 
$1,661,638
 
$1,861,120
 
$2,124,249
 
$2,193,438
 
$3,127,217
 
If none, please provide a more appropriate estimate in the adjoining box
 
 
 
 
Given the option selected does the sum of $1,291,717 provide a fair estimate of the capital cost of the retrofitting carried out in your building?
 
Yes
 
If No, please provide a more representative estimate in the adjoining box
 
 
 
 
Given the option selected. does the sum of $16,142 provide a fair estimate of the Annual Maintenance cost of your building?
 
Yes
 
If No, please provide a more representative estimate in the adjoining box
 
 
 
 
Given the option selected, does the sum of $89,708 provide a fair estimate of the annual cost for Electrical and Gas Energy Usage for your building?
 
Yes
 
If No, please provide a more representative estimate in the adjoining box
 
 
 
 
Could you please indicate the number of years since your building has been retrofitted to comply with the selected building configuration permutation to the nearest 5-year period?
Please select the earlier year if in-between ranges
 
5
 
10
 
15
 
20
 
25
 
Other
 
 
 
 
In your opinion, which of the following numerical estimates best indicates the overall cost that has been expended (in present-value terms) on your building for the Initial retrofitting, Maintenance and Utilities (i.e Electricity and Gas) over the last 5-year period of its life?
 
$1,733,099
 
$1,734,270
 
$1,756,457
 
$1,807,803
 
$1,907,593
 
If none, please provide a more appropriate estimate in the adjoining box
 
 
 
 
In your opinion, which of the following numerical estimates best indicates the overall cost that has been expended (in present-value terms) on your building for the Initial retrofitting, Maintenance and Utilities (i.e Electricity and Gas) over the last 10-year period of its life?
 
$1,910,085
 
$1,933,128
 
$1,961,367
 
$1,985,191
 
$2,424,795
 
If none, please provide a more appropriate estimate in the adjoining box
 
 
 
 
In your opinion, which of the following numerical estimates best indicates the overall cost that has been expended (in present-value terms) on your building for the Initial retrofitting, Maintenance and Utilities (i.e Electricity and Gas) over the last 15-year period of its life?
 
$1,944,405
 
$2,152,213
 
$2,210,932
 
$2,230,017
 
$3,086,560
 
If none, please provide a more appropriate estimate in the adjoining box
 
 
 
 
In your opinion, which of the following numerical estimates best indicates the overall cost that has been expended (in present-value terms) on your building for the Initial retrofitting, Maintenance and Utilities (i.e Electricity and Gas) over the last 20-year period of its life?
 
$1,913,955
 
$2,110,865
 
$2,166,431
 
$2,174,640
 
$3,751,980
 
If none, please provide a more appropriate estimate in the adjoining box
 
 
 
 
In your opinion, which of the following numerical estimates best indicates the overall cost that has been expended (in present-value terms) on your building for the Initial retrofitting, Maintenance and Utilities (i.e Electricity and Gas) over the last 25-year period of its life?
 
$1,889,295
 
$2,205,576
 
$2,502,599
 
$2,602,394
 
$4,212,993
 
If none, please provide a more appropriate estimate in the adjoining box
 
 
 
 
Given the option selected does the sum of $1,123,708 provide a fair estimate of the capital cost of the retrofitting carried out in your building?
 
Yes
 
If No, please provide a more representative estimate in the adjoining box
 
 
 
 
Given the option selected, does the sum of $16,142 provide a fair estimate of the Annual Maintenance cost of your building?
 
Yes
 
If No, please provide a more representative estimate in the adjoining box
 
 
 
 
Given the option selected, does the sum of $91,428 provide a fair estimate of the annual cost for Electrical and Gas Energy Usage for your building?
 
Yes
 
If No, please provide a more representative estimate in the adjoining box
 
 
 
 
Could you please indicate the number of years since your building has been retrofitted to comply with the selected building configuration permutation to the nearest 5-year period?
Please select the earlier year if in-between ranges
 
5
 
10
 
15
 
20
 
25
 
Other
 
 
 
 
In your opinion, which of the following numerical estimates best indicates the overall cost that has been expended (in present-value terms) on your building for the Initial retrofitting, Maintenance and Utilities (i.e Electricity and Gas) over the last 5-year period of its life?
 
$1,572,264
 
$1,573,454
 
$1,596,001
 
$1,648,182
 
$1,749,594
 
If none, please provide a more appropriate estimate in the adjoining box
 
 
 
 
In your opinion, which of the following numerical estimates best indicates the overall cost that has been expended (in present-value terms) on your building for the Initial retrofitting, Maintenance and Utilities (i.e Electricity and Gas) over the last 10-year period of its life?
 
$1,754,097
 
$1,777,588
 
$1,806,376
 
$1,830,663
 
$2,278,813
 
If none, please provide a more appropriate estimate in the adjoining box
 
 
 
 
In your opinion, which of the following numerical estimates best indicates the overall cost that has been expended (in present-value terms) on your building for the Initial retrofitting, Maintenance and Utilities (i.e Electricity and Gas) over the last 15-year period of its life?
 
$1,790,551
 
$2,002,867
 
$2,062,858
 
$2,082,358
 
$2,957,478
 
If none, please provide a more appropriate estimate in the adjoining box
 
 
 
 
In your opinion, which of the following numerical estimates best indicates the overall cost that has been expended (in present-value terms) on your building for the Initial retrofitting, Maintenance and Utilities (i.e Electricity and Gas) over the last 20-year period of its life?
 
$1,759,441
 
$1,960,621
 
$2,017,393
 
$2,025,780
 
$3,637,329
 
If none, please provide a more appropriate estimate in the adjoining box
 
 
 
 
In your opinion, which of the following numerical estimates best indicates the overall cost that has been expended (in present-value terms) on your building for the Initial retrofitting, Maintenance and Utilities (i.e Electricity and Gas) over the last 25-year period of its life?
 
$1,733,669
 
$2,056,505
 
$2,346,813
 
$2,447,616
 
$4,105,523
 
If none, please provide a more appropriate estimate in the adjoining box
 
 
 
 
Given the option selected does the sum of $1,104,654 provide a fair estimate of the capital cost of the retrofitting carried out in your building?
 
Yes
 
If No, please provide a more representative estimate in the adjoining box
 
 
 
 
Given the option selected. does the sum of $16,142 provide a fair estimate of the Annual Maintenance cost of your building?
 
Yes
 
If No, please provide a more representative estimate in the adjoining box
 
 
 
 
Given the option selected, does the sum of $87,678 provide a fair estimate of the annual cost for Electrical and Gas Energy Usage for your building?
 
Yes
 
If No, please provide a more representative estimate in the adjoining box
 
 
 
 
Could you please indicate the number of years since your building has been retrofitted to comply with the selected building configuration permutation to the nearest 5-year period?
Please select the earlier year if in-between ranges
 
5
 
10
 
15
 
20
 
25
 
Other
 
 
 
 
In your opinion, which of the following numerical estimates best indicates the overall cost that has been expended (in present-value terms) on your building for the Initial retrofitting, Maintenance and Utilities (i.e Electricity and Gas) over the last 5-year period of its life?
 
$1,537,573
 
$1,538,721
 
$1,560,482
 
$1,610,844
 
$1,708,721
 
If none, please provide a more appropriate estimate in the adjoining box
 
 
 
 
In your opinion, which of the following numerical estimates best indicates the overall cost that has been expended (in present-value terms) on your building for the Initial retrofitting, Maintenance and Utilities (i.e Electricity and Gas) over the last 10-year period of its life?
 
$1,710,743
 
$1,733,329
 
$1,761,007
 
$1,784,358
 
$2,215,233
 
If none, please provide a more appropriate estimate in the adjoining box
 
 
 
 
In your opinion, which of the following numerical estimates best indicates the overall cost that has been expended (in present-value terms) on your building for the Initial retrofitting, Maintenance and Utilities (i.e Electricity and Gas) over the last 15-year period of its life?
 
$1,743,856
 
$1,947,370
 
$2,004,875
 
$2,023,567
 
$2,862,412
 
If none, please provide a more appropriate estimate in the adjoining box
 
 
 
 
In your opinion, which of the following numerical estimates best indicates the overall cost that has been expended (in present-value terms) on your building for the Initial retrofitting, Maintenance and Utilities (i.e Electricity and Gas) over the last 20-year period of its life?
 
$1,714,035
 
$1,906,876
 
$1,961,295
 
$1,969,334
 
$3,514,082
 
If none, please provide a more appropriate estimate in the adjoining box
 
 
 
 
In your opinion, which of the following numerical estimates best indicates the overall cost that has been expended (in present-value terms) on your building for the Initial retrofitting, Maintenance and Utilities (i.e Electricity and Gas) over the last 25-year period of its life?
 
$1,690,151
 
$2,000,038
 
$2,294,327
 
$2,392,374
 
$3,966,873
 
If none, please provide a more appropriate estimate in the adjoining box
 
 
 
 
Given the option selected does the sum of $1,141,306 provide a fair estimate of the capital cost of the retrofitting carried out in your building?
 
Yes
 
If No, please provide a more representative estimate in the adjoining box
 
 
 
 
Given the option selected. does the sum of $16,142 provide a fair estimate of the Annual Maintenance cost of your building?
 
Yes
 
If No, please provide a more representative estimate in the adjoining box
 
 
 
 
Given the option selected, does the sum of $86,064 provide a fair estimate of the annual cost for Electrical and Gas Energy Usage for your building?
 
Yes
 
If No, please provide a more representative estimate in the adjoining box
 
 
 
 
Could you please indicate the number of years since your building has been retrofitted to comply with the selected building configuration permutation to the nearest 5-year period?
Please select the earlier year if in-between ranges
 
5
 
10
 
15
 
20
 
25
 
Other
 
 
 
 
In your opinion, which of the following numerical estimates best indicates the overall cost that has been expended (in present-value terms) on your building for the Initial retrofitting, Maintenance and Utilities (i.e Electricity and Gas) over the last 5-year period of its life?
 
$1,567,493
 
$1,568,623
 
$1,590,046
 
$1,639,625
 
$1,735,980
 
If none, please provide a more appropriate estimate in the adjoining box
 
 
 
 
In your opinion, which of the following numerical estimates best indicates the overall cost that has been expended (in present-value terms) on your building for the Initial retrofitting, Maintenance and Utilities (i.e Electricity and Gas) over the last 10-year period of its life?
 
$1,740,907
 
$1,763,251
 
$1,790,633
 
$1,813,734
 
$2,239,997
 
If none, please provide a more appropriate estimate in the adjoining box
 
 
 
 
In your opinion, which of the following numerical estimates best indicates the overall cost that has been expended (in present-value terms) on your building for the Initial retrofitting, Maintenance and Utilities (i.e Electricity and Gas) over the last 15-year period of its life?
 
$1,775,314
 
$1,977,175
 
$2,034,213
 
$2,052,752
 
$2,884,781
 
If none, please provide a more appropriate estimate in the adjoining box
 
 
 
 
In your opinion, which of the following numerical estimates best indicates the overall cost that has been expended (in present-value terms) on your building for the Initial retrofitting, Maintenance and Utilities (i.e Electricity and Gas) over the last 20-year period of its life?
 
$1,745,736
 
$1,937,010
 
$1,990,986
 
$1,998,960
 
$3,531,157
 
If none, please provide a more appropriate estimate in the adjoining box
 
 
 
 
In your opinion, which of the following numerical estimates best indicates the overall cost that has been expended (in present-value terms) on your building for the Initial retrofitting, Maintenance and Utilities (i.e Electricity and Gas) over the last 25-year period of its life?
 
$1,721,548
 
$2,028,654
 
$2,302,428
 
$2,398,112
 
$3,977,836
 
If none, please provide a more appropriate estimate in the adjoining box
 
 
 
 
Given the option selected does the sum of $1,287,721 provide a fair estimate of the capital cost of the retrofitting carried out in your building?
 
Yes
 
If No, please provide a more representative estimate in the adjoining box
 
 
 
 
Given the option selected. does the sum of $8,760 provide a fair estimate of the Annual Maintenance cost of your building?
 
Yes
 
If No, please provide a more representative estimate in the adjoining box
 
 
 
 
Given the option selected, does the sum of $70,377 provide a fair estimate of the annual cost for Electrical and Gas Energy Usage for your building?
 
Yes
 
If No, please provide a more representative estimate in the adjoining box
 
 
 
 
Could you please indicate the number of years since your building has been retrofitted to comply with the selected building configuration permutation to the nearest 5-year period?
Please select the earlier year if in-between ranges
 
5
 
10
 
15
 
20
 
25
 
Other
 
 
 
 
In your opinion, which of the following numerical estimates best indicates the overall cost that has been expended (in present-value terms) on your building for the Initial retrofitting, Maintenance and Utilities (i.e Electricity and Gas) over the last 5-year period of its life?
 
$1,617,716
 
$1,618,592
 
$1,635,179
 
$1,673,568
 
$1,748,175
 
If none, please provide a more appropriate estimate in the adjoining box
 
 
 
 
In your opinion, which of the following numerical estimates best indicates the overall cost that has been expended (in present-value terms) on your building for the Initial retrofitting, Maintenance and Utilities (i.e Electricity and Gas) over the last 10-year period of its life?
 
$1,739,638
 
$1,756,479
 
$1,777,117
 
$1,794,527
 
$2,115,800
 
If none, please provide a more appropriate estimate in the adjoining box
 
 
 
 
In your opinion, which of the following numerical estimates best indicates the overall cost that has been expended (in present-value terms) on your building for the Initial retrofitting, Maintenance and Utilities (i.e Electricity and Gas) over the last 15-year period of its life?
 
$1,760,923
 
$1,911,585
 
$1,954,156
 
$1,967,993
 
$2,588,991
 
If none, please provide a more appropriate estimate in the adjoining box
 
 
 
 
In your opinion, which of the following numerical estimates best indicates the overall cost that has been expended (in present-value terms) on your building for the Initial retrofitting, Maintenance and Utilities (i.e Electricity and Gas) over the last 20-year period of its life?
 
$1,738,847
 
$1,881,607
 
$1,921,893
 
$1,927,844
 
$3,071,423
 
If none, please provide a more appropriate estimate in the adjoining box
 
 
 
 
In your opinion, which of the following numerical estimates best indicates the overall cost that has been expended (in present-value terms) on your building for the Initial retrofitting, Maintenance and Utilities (i.e Electricity and Gas) over the last 25-year period of its life?
 
$1,721,355
 
$1,950,865
 
$2,224,638
 
$2,301,855
 
$3,407,552
 
If none, please provide a more appropriate estimate in the adjoining box
 
 
 
 
Given the option selected does the sum of $1,468,032 provide a fair estimate of the capital cost of the retrofitting carried out in your building?
 
Yes
 
If No, please provide a more representative estimate in the adjoining box
 
 
 
 
Given the option selected. does the sum of $4,206 provide a fair estimate of the Annual Maintenance cost of your building?
 
Yes
 
If No, please provide a more representative estimate in the adjoining box
 
 
 
 
Given the option selected, does the sum of $56,875 provide a fair estimate of the annual cost for Electrical and Gas Energy Usage for your building?
 
Yes
 
If No, please provide a more representative estimate in the adjoining box
 
 
 
 
Could you please indicate the number of years since your building has been retrofitted to comply with the selected building configuration permutation to the nearest 5-year period?
Please select the earlier year if in-between ranges
 
5
 
10
 
15
 
20
 
25
 
Other
 
 
 
 
In your opinion, which of the following numerical estimates best indicates the overall cost that has been expended (in present-value terms) on your building for the Initial retrofitting, Maintenance and Utilities (i.e Electricity and Gas) over the last 5-year period of its life?
 
$1,722,735
 
$1,723,411
 
$1,736,214
 
$1,765,844
 
$1,823,429
 
If none, please provide a more appropriate estimate in the adjoining box
 
 
 
 
In your opinion, which of the following numerical estimates best indicates the overall cost that has been expended (in present-value terms) on your building for the Initial retrofitting, Maintenance and Utilities (i.e Electricity and Gas) over the last 10-year period of its life?
 
$1,807,673
 
$1,820,329
 
$1,835,840
 
$1,848,925
 
$2,090,379
 
If none, please provide a more appropriate estimate in the adjoining box
 
 
 
 
In your opinion, which of the following numerical estimates best indicates the overall cost that has been expended (in present-value terms) on your building for the Initial retrofitting, Maintenance and Utilities (i.e Electricity and Gas) over the last 15-year period of its life?
 
$1,819,942
 
$1,931,986
 
$1,963,646
 
$1,973,936
 
$2,435,759
 
If none, please provide a more appropriate estimate in the adjoining box
 
 
 
 
In your opinion, which of the following numerical estimates best indicates the overall cost that has been expended (in present-value terms) on your building for the Initial retrofitting, Maintenance and Utilities (i.e Electricity and Gas) over the last 20-year period of its life?
 
$1,803,525
 
$1,909,692
 
$1,939,652
 
$1,944,078
 
$2,794,533
 
If none, please provide a more appropriate estimate in the adjoining box
 
 
 
 
In your opinion, which of the following numerical estimates best indicates the overall cost that has been expended (in present-value terms) on your building for the Initial retrofitting, Maintenance and Utilities (i.e Electricity and Gas) over the last 25-year period of its life?
 
$1,791,072
 
$1,962,048
 
$2,219,643
 
$2,281,588
 
$3,047,223
 
If none, please provide a more appropriate estimate in the adjoining box
 
 
 
 
Given the option selected does the sum of $1,149,032 provide a fair estimate of the capital cost of the retrofitting carried out in your building?
 
Yes
 
If No, please provide a more representative estimate in the adjoining box
 
 
 
 
Given the option selected. does the sum of $8,760 provide a fair estimate of the Annual Maintenance cost of your building?
 
Yes
 
If No, please provide a more representative estimate in the adjoining box
 
 
 
 
Given the option selected, does the sum of $74,803 provide a fair estimate of the annual cost for Electrical and Gas Energy Usage for your building?
 
Yes
 
If No, please provide a more representative estimate in the adjoining box
 
 
 
 
Could you please indicate the number of years since your building has been retrofitted to comply with the selected building configuration permutation to the nearest 5-year period?
Please select the earlier year if in-between ranges
 
5
 
10
 
15
 
20
 
25
 
Other
 
 
 
 
In your opinion, which of the following numerical estimates best indicates the overall cost that has been expended (in present-value terms) on your building for the Initial retrofitting, Maintenance and Utilities (i.e Electricity and Gas) over the last 5-year period of its life?
 
$1,498,376
 
$1,499,300
 
$1,516,816
 
$1,557,351
 
$1,636,131
 
If none, please provide a more appropriate estimate in the adjoining box
 
 
 
 
In your opinion, which of the following numerical estimates best indicates the overall cost that has been expended (in present-value terms) on your building for the Initial retrofitting, Maintenance and Utilities (i.e Electricity and Gas) over the last 10-year period of its life?
 
$1,634,408
 
$1,652,462
 
$1,674,587
 
$1,693,253
 
$2,037,678
 
If none, please provide a more appropriate estimate in the adjoining box
 
 
 
 
In your opinion, which of the following numerical estimates best indicates the overall cost that has been expended (in present-value terms) on your building for the Initial retrofitting, Maintenance and Utilities (i.e Electricity and Gas) over the last 15-year period of its life?
 
$1,662,311
 
$1,825,449
 
$1,871,545
 
$1,886,528
 
$2,558,950
 
If none, please provide a more appropriate estimate in the adjoining box
 
 
 
 
In your opinion, which of the following numerical estimates best indicates the overall cost that has been expended (in present-value terms) on your building for the Initial retrofitting, Maintenance and Utilities (i.e Electricity and Gas) over the last 20-year period of its life?
 
$1,638,407
 
$1,792,988
 
$1,836,611
 
$1,843,055
 
$3,081,331
 
If none, please provide a more appropriate estimate in the adjoining box
 
 
 
 
In your opinion, which of the following numerical estimates best indicates the overall cost that has been expended (in present-value terms) on your building for the Initial retrofitting, Maintenance and Utilities (i.e Electricity and Gas) over the last 25-year period of its life?
 
$1,617,595
 
$1,865,120
 
$2,112,452
 
$2,191,779
 
$3,436,148
 
If none, please provide a more appropriate estimate in the adjoining box
 
 
 
 
Given the option selected does the sum of $1,333,220 provide a fair estimate of the capital cost of the retrofitting carried out in your building?
 
Yes
 
If No, please provide a more representative estimate in the adjoining box
 
 
 
 
Given the option selected. does the sum of $4,206 provide a fair estimate of the Annual Maintenance cost of your building?
 
Yes
 
If No, please provide a more representative estimate in the adjoining box
 
 
 
 
Given the option selected, does the sum of $66,970 provide a fair estimate of the annual cost for Electrical and Gas Energy Usage for your building?
 
Yes
 
If No, please provide a more representative estimate in the adjoining box
 
 
 
 
Could you please indicate the number of years since your building has been retrofitted to comply with the selected building configuration permutation to the nearest 5-year period?
Please select the earlier year if in-between ranges
 
5
 
10
 
15
 
20
 
25
 
Other
 
 
 
 
In your opinion, which of the following numerical estimates best indicates the overall cost that has been expended (in present-value terms) on your building for the Initial retrofitting, Maintenance and Utilities (i.e Electricity and Gas) over the last 5-year period of its life?
 
$1,630,017
 
$1,630,804
 
$1,645,724
 
$1,680,250
 
$1,747,352
 
If none, please provide a more appropriate estimate in the adjoining box
 
 
 
 
In your opinion, which of the following numerical estimates best indicates the overall cost that has been expended (in present-value terms) on your building for the Initial retrofitting, Maintenance and Utilities (i.e Electricity and Gas) over the last 10-year period of its life?
 
$1,741,549
 
$1,756,765
 
$1,775,412
 
$1,791,144
 
$2,081,428
 
If none, please provide a more appropriate estimate in the adjoining box
 
 
 
 
In your opinion, which of the following numerical estimates best indicates the overall cost that has been expended (in present-value terms) on your building for the Initial retrofitting, Maintenance and Utilities (i.e Electricity and Gas) over the last 15-year period of its life?
 
$1,765,068
 
$1,902,563
 
$1,941,414
 
$1,954,042
 
$2,520,769
 
If none, please provide a more appropriate estimate in the adjoining box
 
 
 
 
In your opinion, which of the following numerical estimates best indicates the overall cost that has been expended (in present-value terms) on your building for the Initial retrofitting, Maintenance and Utilities (i.e Electricity and Gas) over the last 20-year period of its life?
 
$1,744,921
 
$1,875,205
 
$1,911,971
 
$1,917,402
 
$2,961,041
 
If none, please provide a more appropriate estimate in the adjoining box
 
 
 
 
In your opinion, which of the following numerical estimates best indicates the overall cost that has been expended (in present-value terms) on your building for the Initial retrofitting, Maintenance and Utilities (i.e Electricity and Gas) over the last 25-year period of its life?
 
$1,726,467
 
$1,934,602
 
$2,163,153
 
$2,231,552
 
$3,255,621
 
If none, please provide a more appropriate estimate in the adjoining box
 
 
 
 
Given the option selected does the sum of $1,328,639 provide a fair estimate of the capital cost of the retrofitting carried out in your building?
 
Yes
 
If No, please provide a more representative estimate in the adjoining box
 
 
 
 
Given the option selected. does the sum of $16,142 provide a fair estimate of the Annual Maintenance cost of your building?
 
Yes
 
If No, please provide a more representative estimate in the adjoining box
 
 
 
 
Given the option selected, does the sum of $84,876 provide a fair estimate of the annual cost for Electrical and Gas Energy Usage for your building?
 
Yes
 
If No, please provide a more representative estimate in the adjoining box
 
 
 
 
Could you please indicate the number of years since your building has been retrofitted to comply with the selected building configuration permutation to the nearest 5-year period?
Please select the earlier year if in-between ranges
 
5
 
10
 
15
 
20
 
25
 
Other
 
 
 
 
In your opinion, which of the following numerical estimates best indicates the overall cost that has been expended (in present-value terms) on your building for the Initial retrofitting, Maintenance and Utilities (i.e Electricity and Gas) over the last 5-year period of its life?
 
$1,749,874
 
$1,750,991
 
$1,772,166
 
$1,821,168
 
$1,916,404
 
If none, please provide a more appropriate estimate in the adjoining box
 
 
 
 
In your opinion, which of the following numerical estimates best indicates the overall cost that has been expended (in present-value terms) on your building for the Initial retrofitting, Maintenance and Utilities (i.e Electricity and Gas) over the last 10-year period of its life?
 
$1,922,084
 
$1,944,198
 
$1,971,299
 
$1,994,162
 
$2,416,049
 
If none, please provide a more appropriate estimate in the adjoining box
 
 
 
 
In your opinion, which of the following numerical estimates best indicates the overall cost that has been expended (in present-value terms) on your building for the Initial retrofitting, Maintenance and Utilities (i.e Electricity and Gas) over the last 15-year period of its life?
 
$1,956,490
 
$2,156,391
 
$2,212,875
 
$2,231,234
 
$3,055,184
 
If none, please provide a more appropriate estimate in the adjoining box
 
 
 
 
In your opinion, which of the following numerical estimates best indicates the overall cost that has been expended (in present-value terms) on your building for the Initial retrofitting, Maintenance and Utilities (i.e Electricity and Gas) over the last 20-year period of its life?
 
$1,927,199
 
$2,116,615
 
$2,177,964
 
$2,170,068
 
$3,695,283
 
If none, please provide a more appropriate estimate in the adjoining box
 
 
 
 
In your opinion, which of the following numerical estimates best indicates the overall cost that has been expended (in present-value terms) on your building for the Initial retrofitting, Maintenance and Utilities (i.e Electricity and Gas) over the last 25-year period of its life?
 
$1,903,176
 
$2,207,264
 
$2,473,695
 
$2,568,065
 
$4,137,286
 
If none, please provide a more appropriate estimate in the adjoining box
 
 
 
 
Given the option selected does the sum of $1,334,976 provide a fair estimate of the capital cost of the retrofitting carried out in your building?
 
Yes
 
If No, please provide a more representative estimate in the adjoining box
 
 
 
 
Given the option selected. does the sum of $8,760 provide a fair estimate of the Annual Maintenance cost of your building?
 
Yes
 
If No, please provide a more representative estimate in the adjoining box
 
 
 
 
Given the option selected, does the sum of $65,461 provide a fair estimate of the annual cost for Electrical and Gas Energy Usage for your building?
 
Yes
 
If No, please provide a more representative estimate in the adjoining box
 
 
 
 
Could you please indicate the number of years since your building has been retrofitted to comply with the selected building configuration permutation to the nearest 5-year period?
Please select the earlier year if in-between ranges
 
5
 
10
 
15
 
20
 
25
 
Other
 
 
 
 
In your opinion, which of the following numerical estimates best indicates the overall cost that has been expended (in present-value terms) on your building for the Initial retrofitting, Maintenance and Utilities (i.e Electricity and Gas) over the last 5-year period of its life?
 
$1,644,471
 
$1,645,292
 
$1,660,849
 
$1,696,853
 
$1,766,825
 
If none, please provide a more appropriate estimate in the adjoining box
 
 
 
 
In your opinion, which of the following numerical estimates best indicates the overall cost that has been expended (in present-value terms) on your building for the Initial retrofitting, Maintenance and Utilities (i.e Electricity and Gas) over the last 10-year period of its life?
 
$1,760,825
 
$1,776,693
 
$1,796,141
 
$1,812,547
 
$2,115,288
 
If none, please provide a more appropriate estimate in the adjoining box
 
 
 
 
In your opinion, which of the following numerical estimates best indicates the overall cost that has been expended (in present-value terms) on your building for the Initial retrofitting, Maintenance and Utilities (i.e Electricity and Gas) over the last 15-year period of its life?
 
$1,781,709
 
$1,923,944
 
$1,964,134
 
$1,977,197
 
$2,563,460
 
If none, please provide a more appropriate estimate in the adjoining box
 
 
 
 
In your opinion, which of the following numerical estimates best indicates the overall cost that has been expended (in present-value terms) on your building for the Initial retrofitting, Maintenance and Utilities (i.e Electricity and Gas) over the last 20-year period of its life?
 
$1,760,868
 
$1,895,643
 
$1,933,676
 
$1,939,294
 
$3,018,908
 
If none, please provide a more appropriate estimate in the adjoining box
 
 
 
 
In your opinion, which of the following numerical estimates best indicates the overall cost that has been expended (in present-value terms) on your building for the Initial retrofitting, Maintenance and Utilities (i.e Electricity and Gas) over the last 25-year period of its life?
 
$1,744,224
 
$1,960,828
 
$2,207,439
 
$2,279,343
 
$3,335,600
 
If none, please provide a more appropriate estimate in the adjoining box
 
 
 
 
Given the option selected does the sum of $1,518,272 provide a fair estimate of the capital cost of the retrofitting carried out in your building?
 
Yes
 
If No, please provide a more representative estimate in the adjoining box
 
 
 
 
Given the option selected. does the sum of $4,206 provide a fair estimate of the Annual Maintenance cost of your building?
 
Yes
 
If No, please provide a more representative estimate in the adjoining box
 
 
 
 
Given the option selected, does the sum of $55,094 provide a fair estimate of the annual cost for Electrical and Gas Energy Usage for your building?
 
Yes
 
If No, please provide a more representative estimate in the adjoining box
 
 
 
 
Could you please indicate the number of years since your building has been retrofitted to comply with the selected building configuration permutation to the nearest 5-year period?
Please select the earlier year if in-between ranges
 
5
 
10
 
15
 
20
 
25
 
Other
 
 
 
 
In your opinion, which of the following numerical estimates best indicates the overall cost that has been expended (in present-value terms) on your building for the Initial retrofitting, Maintenance and Utilities (i.e Electricity and Gas) over the last 5-year period of its life?
 
$1,765,549
 
$1,766,205
 
$1,778,634
 
$1,807,401
 
$1,863,307
 
If none, please provide a more appropriate estimate in the adjoining box
 
 
 
 
In your opinion, which of the following numerical estimates best indicates the overall cost that has been expended (in present-value terms) on your building for the Initial retrofitting, Maintenance and Utilities (i.e Electricity and Gas) over the last 10-year period of its life?
 
$1,853,292
 
$1,865,776
 
$1,881,075
 
$1,893,983
 
$2,132,152
 
If none, please provide a more appropriate estimate in the adjoining box
 
 
 
 
In your opinion, which of the following numerical estimates best indicates the overall cost that has been expended (in present-value terms) on your building for the Initial retrofitting, Maintenance and Utilities (i.e Electricity and Gas) over the last 15-year period of its life?
 
$1,868,734
 
$1,980,317
 
$2,011,845
 
$2,022,093
 
$2,482,015
 
If none, please provide a more appropriate estimate in the adjoining box
 
 
 
 
In your opinion, which of the following numerical estimates best indicates the overall cost that has been expended (in present-value terms) on your building for the Initial retrofitting, Maintenance and Utilities (i.e Electricity and Gas) over the last 20-year period of its life?
 
$1,852,384
 
$1,958,114
 
$1,987,951
 
$1,992,359
 
$2,839,313
 
If none, please provide a more appropriate estimate in the adjoining box
 
 
 
 
In your opinion, which of the following numerical estimates best indicates the overall cost that has been expended (in present-value terms) on your building for the Initial retrofitting, Maintenance and Utilities (i.e Electricity and Gas) over the last 25-year period of its life?
 
$1,838,884
 
$2,008,574
 
$2,229,349
 
$2,287,953
 
$3,085,591
 
If none, please provide a more appropriate estimate in the adjoining box
 
 
 
 
Given the option selected does the sum of $1,170,356 provide a fair estimate of the capital cost of the retrofitting carried out in your building?
 
Yes
 
If No, please provide a more representative estimate in the adjoining box
 
 
 
 
Given the option selected. does the sum of $16,142 provide a fair estimate of the Annual Maintenance cost of your building?
 
Yes
 
If No, please provide a more representative estimate in the adjoining box
 
 
 
 
Given the option selected, does the sum of $79,755 provide a fair estimate of the annual cost for Electrical and Gas Energy Usage for your building?
 
Yes
 
If No, please provide a more representative estimate in the adjoining box
 
 
 
 
Could you please indicate the number of years since your building has been retrofitted to comply with the selected building configuration permutation to the nearest 5-year period?
Please select the earlier year if in-between ranges
 
5
 
10
 
15
 
20
 
25
 
Other
 
 
 
 
In your opinion, which of the following numerical estimates best indicates the overall cost that has been expended (in present-value terms) on your building for the Initial retrofitting, Maintenance and Utilities (i.e Electricity and Gas) over the last 5-year period of its life?
 
$1,570,235
 
$1,571,295
 
$1,591,396
 
$1,637,914
 
$1,728,321
 
If none, please provide a more appropriate estimate in the adjoining box
 
 
 
 
In your opinion, which of the following numerical estimates best indicates the overall cost that has been expended (in present-value terms) on your building for the Initial retrofitting, Maintenance and Utilities (i.e Electricity and Gas) over the last 10-year period of its life?
 
$1,732,303
 
$1,753,243
 
$1,778,906
 
$1,800,556
 
$2,200,050
 
If none, please provide a more appropriate estimate in the adjoining box
 
 
 
 
In your opinion, which of the following numerical estimates best indicates the overall cost that has been expended (in present-value terms) on your building for the Initial retrofitting, Maintenance and Utilities (i.e Electricity and Gas) over the last 15-year period of its life?
 
$1,763,307
 
$1,952,096
 
$2,005,440
 
$2,022,779
 
$2,800,928
 
If none, please provide a more appropriate estimate in the adjoining box
 
 
 
 
In your opinion, which of the following numerical estimates best indicates the overall cost that has been expended (in present-value terms) on your building for the Initial retrofitting, Maintenance and Utilities (i.e Electricity and Gas) over the last 20-year period of its life?
 
$1,735,644
 
$1,914,532
 
$1,965,013
 
$1,972,470
 
$3,405,446
 
If none, please provide a more appropriate estimate in the adjoining box
 
 
 
 
In your opinion, which of the following numerical estimates best indicates the overall cost that has been expended (in present-value terms) on your building for the Initial retrofitting, Maintenance and Utilities (i.e Electricity and Gas) over the last 25-year period of its life?
 
$1,713,725
 
$2,001,315
 
$2,263,731
 
$2,353,842
 
$3,826,633
 
If none, please provide a more appropriate estimate in the adjoining box
 
 
 
 
Given the option selected does the sum of $1,170,356 provide a fair estimate of the capital cost of the retrofitting carried out in your building?
 
Yes
 
If No, please provide a more representative estimate in the adjoining box
 
 
 
 
Given the option selected. does the sum of $16,142 provide a fair estimate of the Annual Maintenance cost of your building?
 
Yes
 
If No, please provide a more representative estimate in the adjoining box
 
 
 
 
Given the option selected, does the sum of $78,587 provide a fair estimate of the annual cost for Electrical and Gas Energy Usage for your building?
 
Yes
 
If No, please provide a more representative estimate in the adjoining box
 
 
 
 
Could you please indicate the number of years since your building has been retrofitted to comply with the selected building configuration permutation to the nearest 5-year period?
Please select the earlier year if in-between ranges
 
5
 
10
 
15
 
20
 
25
 
Other
 
 
 
 
In your opinion, which of the following numerical estimates best indicates the overall cost that has been expended (in present-value terms) on your building for the Initial retrofitting, Maintenance and Utilities (i.e Electricity and Gas) over the last 5-year period of its life?
 
$1,565,366
 
$1,566,414
 
$1,586,270
 
$1,632,222
 
$1,721,528
 
If none, please provide a more appropriate estimate in the adjoining box
 
 
 
 
In your opinion, which of the following numerical estimates best indicates the overall cost that has been expended (in present-value terms) on your building for the Initial retrofitting, Maintenance and Utilities (i.e Electricity and Gas) over the last 10-year period of its life?
 
$1,725,540
 
$1,746,229
 
$1,771,583
 
$1,792,972
 
$2,187,659
 
If none, please provide a more appropriate estimate in the adjoining box
 
 
 
 
In your opinion, which of the following numerical estimates best indicates the overall cost that has been expended (in present-value terms) on your building for the Initial retrofitting, Maintenance and Utilities (i.e Electricity and Gas) over the last 15-year period of its life?
 
$1,756,056
 
$1,942,536
 
$1,995,228
 
$2,012,355
 
$2,780,989
 
If none, please provide a more appropriate estimate in the adjoining box
 
 
 
 
In your opinion, which of the following numerical estimates best indicates the overall cost that has been expended (in present-value terms) on your building for the Initial retrofitting, Maintenance and Utilities (i.e Electricity and Gas) over the last 20-year period of its life?
 
$1,728,732
 
$1,905,431
 
$1,955,295
 
$1,962,661
 
$3,378,114
 
If none, please provide a more appropriate estimate in the adjoining box
 
 
 
 
In your opinion, which of the following numerical estimates best indicates the overall cost that has been expended (in present-value terms) on your building for the Initial retrofitting, Maintenance and Utilities (i.e Electricity and Gas) over the last 25-year period of its life?
 
$1,707,174
 
$1,991,298
 
$2,250,462
 
$2,339,480
 
$3,794,610
 
If none, please provide a more appropriate estimate in the adjoining box
 
 
 
 
Given the option selected does the sum of $1,178,974 provide a fair estimate of the capital cost of the retrofitting carried out in your building?
 
Yes
 
If No, please provide a more representative estimate in the adjoining box
 
 
 
 
Given the option selected. does the sum of $8,760 provide a fair estimate of the Annual Maintenance cost of your building?
 
Yes
 
If No, please provide a more representative estimate in the adjoining box
 
 
 
 
Given the option selected, does the sum of $67,327 provide a fair estimate of the annual cost for Electrical and Gas Energy Usage for your building?
 
Yes
 
If No, please provide a more representative estimate in the adjoining box
 
 
 
 
Could you please indicate the number of years since your building has been retrofitted to comply with the selected building configuration permutation to the nearest 5-year period?
Please select the earlier year if in-between ranges
 
5
 
10
 
15
 
20
 
25
 
Other
 
 
 
 
In your opinion, which of the following numerical estimates best indicates the overall cost that has been expended (in present-value terms) on your building for the Initial retrofitting, Maintenance and Utilities (i.e Electricity and Gas) over the last 5-year period of its life?
 
$1,496,249
 
$1,497,091
 
$1,513,039
 
$1,549,949
 
$1,621,680
 
If none, please provide a more appropriate estimate in the adjoining box
 
 
 
 
In your opinion, which of the following numerical estimates best indicates the overall cost that has been expended (in present-value terms) on your building for the Initial retrofitting, Maintenance and Utilities (i.e Electricity and Gas) over the last 10-year period of its life?
 
$1,619,041
 
$1,635,440
 
$1,655,537
 
$1,672,491
 
$1,985,340
 
If none, please provide a more appropriate estimate in the adjoining box
 
 
 
 
In your opinion, which of the following numerical estimates best indicates the overall cost that has been expended (in present-value terms) on your building for the Initial retrofitting, Maintenance and Utilities (i.e Electricity and Gas) over the last 15-year period of its life?
 
$1,643,053
 
$1,790,810
 
$1,832,561
 
$1,846,131
 
$2,455,157
 
If none, please provide a more appropriate estimate in the adjoining box
 
 
 
 
In your opinion, which of the following numerical estimates best indicates the overall cost that has been expended (in present-value terms) on your building for the Initial retrofitting, Maintenance and Utilities (i.e Electricity and Gas) over the last 20-year period of its life?
 
$1,621,403
 
$1,761,410
 
$1,800,920
 
$1,806,756
 
$2,928,289
 
If none, please provide a more appropriate estimate in the adjoining box
 
 
 
 
In your opinion, which of the following numerical estimates best indicates the overall cost that has been expended (in present-value terms) on your building for the Initial retrofitting, Maintenance and Utilities (i.e Electricity and Gas) over the last 25-year period of its life?
 
$1,603,222
 
$1,827,764
 
$2,060,427
 
$2,133,137
 
$3,252,922
 
If none, please provide a more appropriate estimate in the adjoining box
 
 
 
 
Given the option selected does the sum of $1, 362, 270 provide a fair estimate of the capital cost of the retrofitting carried out in your building?
 
Yes
 
If No, please provide a more representative estimate in the adjoining box
 
 
 
 
Given the option selected. does the sum of $4,206 provide a fair estimate of the Annual Maintenance cost of your building?
 
Yes
 
If No, please provide a more representative estimate in the adjoining box
 
 
 
 
Given the option selected, does the sum of $59,493 provide a fair estimate of the annual cost for Electrical and Gas Energy Usage for your building?
 
Yes
 
If No, please provide a more representative estimate in the adjoining box
 
 
 
 
Could you please indicate the number of years since your building has been retrofitted to comply with the selected building configuration permutation to the nearest 5-year period?
Please select the earlier year if in-between ranges
 
5
 
10
 
15
 
20
 
25
 
Other
 
 
 
 
In your opinion, which of the following numerical estimates best indicates the overall cost that has been expended (in present-value terms) on your building for the Initial retrofitting, Maintenance and Utilities (i.e Electricity and Gas) over the last 5-year period of its life?
 
$1,627,891
 
$1,628,595
 
$1,641,947
 
$1,672,847
 
$1,732,900
 
If none, please provide a more appropriate estimate in the adjoining box
 
 
 
 
In your opinion, which of the following numerical estimates best indicates the overall cost that has been expended (in present-value terms) on your building for the Initial retrofitting, Maintenance and Utilities (i.e Electricity and Gas) over the last 10-year period of its life?
 
$1,726,182
 
$1,739,743
 
$1,756,362
 
$1,770,382
 
$2,029,090
 
If none, please provide a more appropriate estimate in the adjoining box
 
 
 
 
In your opinion, which of the following numerical estimates best indicates the overall cost that has been expended (in present-value terms) on your building for the Initial retrofitting, Maintenance and Utilities (i.e Electricity and Gas) over the last 15-year period of its life?
 
$1,745,810
 
$1,867,925
 
$1,902,430
 
$1,913,645
 
$2,416,977
 
If none, please provide a more appropriate estimate in the adjoining box
 
 
 
 
In your opinion, which of the following numerical estimates best indicates the overall cost that has been expended (in present-value terms) on your building for the Initial retrofitting, Maintenance and Utilities (i.e Electricity and Gas) over the last 20-year period of its life?
 
$1,727,917
 
$1,843,627
 
$1,876,280
 
$1,881,103
 
$2,807,998
 
If none, please provide a more appropriate estimate in the adjoining box
 
 
 
 
In your opinion, which of the following numerical estimates best indicates the overall cost that has been expended (in present-value terms) on your building for the Initial retrofitting, Maintenance and Utilities (i.e Electricity and Gas) over the last 25-year period of its life?
 
$1,712,094
 
$1,897,246
 
$2,111,187
 
$2,172,910
 
$3,072,395
 
If none, please provide a more appropriate estimate in the adjoining box
 
 
 
 
Given the option selected does the sum of $1, 361, 283 provide a fair estimate of the capital cost of the retrofitting carried out in your building?
 
Yes
 
If No, please provide a more representative estimate in the adjoining box
 
 
 
 
Given the option selected. does the sum of $16,142 provide a fair estimate of the Annual Maintenance cost of your building?
 
Yes
 
If No, please provide a more representative estimate in the adjoining box
 
 
 
 
Given the option selected, does the sum of $77,509 provide a fair estimate of the annual cost for Electrical and Gas Energy Usage for your building?
 
Yes
 
If No, please provide a more representative estimate in the adjoining box
 
 
 
 
Could you please indicate the number of years since your building has been retrofitted to comply with the selected building configuration permutation to the nearest 5-year period?
Please select the earlier year if in-between ranges
 
5
 
10
 
15
 
20
 
25
 
Other
 
 
 
 
In your opinion, which of the following numerical estimates best indicates the overall cost that has been expended (in present-value terms) on your building for the Initial retrofitting, Maintenance and Utilities (i.e Electricity and Gas) over the last 5-year period of its life?
 
$1,751,797
 
$1,752,832
 
$1,772,463
 
$1,817,891
 
$1,906,181
 
If none, please provide a more appropriate estimate in the adjoining box
 
 
 
 
In your opinion, which of the following numerical estimates best indicates the overall cost that has been expended (in present-value terms) on your building for the Initial retrofitting, Maintenance and Utilities (i.e Electricity and Gas) over the last 10-year period of its life?
 
$1,911,053
 
$1,931,540
 
$1,956,647
 
$1,977,827
 
$2,368,665
 
If none, please provide a more appropriate estimate in the adjoining box
 
 
 
 
In your opinion, which of the following numerical estimates best indicates the overall cost that has been expended (in present-value terms) on your building for the Initial retrofitting, Maintenance and Utilities (i.e Electricity and Gas) over the last 15-year period of its life?
 
$1,941,691
 
$2,126,486
 
$2,178,701
 
$2,195,674
 
$2,957,361
 
If none, please provide a more appropriate estimate in the adjoining box
 
 
 
 
In your opinion, which of the following numerical estimates best indicates the overall cost that has been expended (in present-value terms) on your building for the Initial retrofitting, Maintenance and Utilities (i.e Electricity and Gas) over the last 20-year period of its life?
 
$1,914,613
 
$2,089,716
 
$2,139,129
 
$2,146,429
 
$3,549,090
 
If none, please provide a more appropriate estimate in the adjoining box
 
 
 
 
In your opinion, which of the following numerical estimates best indicates the overall cost that has been expended (in present-value terms) on your building for the Initial retrofitting, Maintenance and Utilities (i.e Electricity and Gas) over the last 25-year period of its life?
 
$1,893,156
 
$2,174,662
 
$2,426,166
 
$2,513,928
 
$3,961,362
 
If none, please provide a more appropriate estimate in the adjoining box
 
 
 
 
Given the option selected does the sum of $1, 365, 696 provide a fair estimate of the capital cost of the retrofitting carried out in your building?
 
Yes
 
If No, please provide a more representative estimate in the adjoining box
 
 
 
 
Given the option selected. does the sum of $8,760 provide a fair estimate of the Annual Maintenance cost of your building?
 
Yes
 
If No, please provide a more representative estimate in the adjoining box
 
 
 
 
Given the option selected, does the sum of $57,419 provide a fair estimate of the annual cost for Electrical and Gas Energy Usage for your building?
 
Yes
 
If No, please provide a more representative estimate in the adjoining box
 
 
 
 
Could you please indicate the number of years since your building has been retrofitted to comply with the selected building configuration permutation to the nearest 5-year period?
Please select the earlier year if in-between ranges
 
5
 
10
 
15
 
20
 
25
 
Other
 
 
 
 
In your opinion, which of the following numerical estimates best indicates the overall cost that has been expended (in present-value terms) on your building for the Initial retrofitting, Maintenance and Utilities (i.e Electricity and Gas) over the last 5-year period of its life.
 
$1,641,657
 
$1,642,389
 
$1,656,260
 
$1,688,363
 
$1,750,754
 
If none, please provide a more appropriate estimate in the adjoining box
 
 
 
 
In your opinion, which of the following numerical estimates best indicates the overall cost that has been expended (in present-value terms) on your building for the Initial retrofitting, Maintenance and Utilities (i.e Electricity and Gas) over the last 10-year period of its life?
 
$1,750,028
 
$1,764,350
 
$1,781,901
 
$1,796,708
 
$2,069,934
 
If none, please provide a more appropriate estimate in the adjoining box
 
 
 
 
In your opinion, which of the following numerical estimates best indicates the overall cost that has been expended (in present-value terms) on your building for the Initial retrofitting, Maintenance and Utilities (i.e Electricity and Gas) over the last 15-year period of its life?
 
$1,771,034
 
$1,900,089
 
$1,936,555
 
$1,948,408
 
$2,480,346
 
If none, please provide a more appropriate estimate in the adjoining box
 
 
 
 
In your opinion, which of the following numerical estimates best indicates the overall cost that has been expended (in present-value terms) on your building for the Initial retrofitting, Maintenance and Utilities (i.e Electricity and Gas) over the last 20-year period of its life?
 
$1,752,124
 
$1,874,410
 
$1,908,919
 
$1,914,017
 
$2,893,592
 
If none, please provide a more appropriate estimate in the adjoining box
 
 
 
 
In your opinion, which of the following numerical estimates best indicates the overall cost that has been expended (in present-value terms) on your building for the Initial retrofitting, Maintenance and Utilities (i.e Electricity and Gas) over the last 25-year period of its life?
 
$1,736,551
 
$1,932,835
 
$2,128,708
 
$2,191,592
 
$3,178,635
 
If none, please provide a more appropriate estimate in the adjoining box
 
 
 
 
Given the option selected does the sum of $1, 548, 992 provide a fair estimate of the capital cost of the retrofitting carried out in your building?
 
Yes
 
If No, please provide a more representative estimate in the adjoining box
 
 
 
 
Given the option selected. does the sum of $4,206 provide a fair estimate of the Annual Maintenance cost of your building?
 
Yes
 
If No, please provide a more representative estimate in the adjoining box
 
 
 
 
Given the option selected, does the sum of $49,543 provide a fair estimate of the annual cost for Electrical and Gas Energy Usage for your building?
 
Yes
 
If No, please provide a more representative estimate in the adjoining box
 
 
 
 
Could you please indicate the number of years since your building has been retrofitted to comply with the selected building configuration permutation to the nearest 5-year period?
Please select the earlier year if in-between ranges
 
5
 
10
 
15
 
20
 
25
 
Other
 
 
 
 
In your opinion, which of the following numerical estimates best indicates the overall cost that has been expended (in present-value terms) on your building for the Initial retrofitting, Maintenance and Utilities (i.e Electricity and Gas) over the last 5-year period of its life?
 
$1,773,121
 
$1,773,715
 
$1,784,982
 
$1,811,055
 
$1,861,727
 
If none, please provide a more appropriate estimate in the adjoining box
 
 
 
 
In your opinion, which of the following numerical estimates best indicates the overall cost that has been expended (in present-value terms) on your building for the Initial retrofitting, Maintenance and Utilities (i.e Electricity and Gas) over the last 10-year period of its life?
 
$1,856,923
 
$1,868,397
 
$1,882,460
 
$1,894,323
 
$2,113,234
 
If none, please provide a more appropriate estimate in the adjoining box
 
 
 
 
In your opinion, which of the following numerical estimates best indicates the overall cost that has been expended (in present-value terms) on your building for the Initial retrofitting, Maintenance and Utilities (i.e Electricity and Gas) over the last 15-year period of its life?
 
$1,873,527
 
$1,976,856
 
$2,006,052
 
$2,015,542
 
$2,441,440
 
If none, please provide a more appropriate estimate in the adjoining box
 
 
 
 
In your opinion, which of the following numerical estimates best indicates the overall cost that has been expended (in present-value terms) on your building for the Initial retrofitting, Maintenance and Utilities (i.e Electricity and Gas) over the last 20-year period of its life?
 
$1,858,387
 
$1,956,296
 
$1,983,925
 
$1,988,007
 
$2,772,307
 
If none, please provide a more appropriate estimate in the adjoining box
 
 
 
 
In your opinion, which of the following numerical estimates best indicates the overall cost that has been expended (in present-value terms) on your building for the Initial retrofitting, Maintenance and Utilities (i.e Electricity and Gas) over the last 25-year period of its life?
 
$1,845,185
 
$2,001,953
 
$2,178,925
 
$2,230,842
 
$2, 996, 944
 
If none, please provide a more appropriate estimate in the adjoining box
 
 
 
 
Given the option selected does the sum of $1, 211 359 provide a fair estimate of the capital cost of the retrofitting carried out in your building?
 
Yes
 
If No, please provide a more representative estimate in the adjoining box
 
 
 
 
Given the option selected. does the sum of $16,142 provide a fair estimate of the Annual Maintenance cost of your building?
 
Yes
 
If No, please provide a more representative estimate in the adjoining box
 
 
 
 
Given the option selected, does the sum of $95,162 provide a fair estimate of the annual cost for Electrical and Gas Energy Usage for your building?
 
Yes
 
If No, please provide a more representative estimate in the adjoining box
 
 
 
 
Could you please indicate the number of years since your building has been retrofitted to comply with the selected building configuration permutation to the nearest 5-year period?
Please select the earlier year if in-between ranges
 
5
 
10
 
15
 
20
 
25
 
Other
 
 
 
 
In your opinion, which of the following numerical estimates best indicates the overall cost that has been expended (in present-value terms) on your building for the Initial retrofitting, Maintenance and Utilities (i.e Electricity and Gas) over the last 5-year period of its life?
 
$1,603,339
 
$1,675,484
 
$1,700,045
 
$1,754,037
 
$1,858,969
 
If none, please provide a more appropriate estimate in the adjoining box
 
 
 
 
In your opinion, which of the following numerical estimates best indicates the overall cost that has been expended (in present-value terms) on your building for the Initial retrofitting, Maintenance and Utilities (i.e Electricity and Gas) over the last 10-year period of its life?
 
$1,854,759
 
$1,878,735
 
$1,908,118
 
$1,932,906
 
$2,390,306
 
If none, please provide a more appropriate estimate in the adjoining box
 
 
 
 
In your opinion, which of the following numerical estimates best indicates the overall cost that has been expended (in present-value terms) on your building for the Initial retrofitting, Maintenance and Utilities (i.e. Electricity and Gas) over the last 15-year period of its life?
 
$1,886,849
 
$2,101,917
 
$2,162,687
 
$2,182,439
 
$3 068, 906
 
If none, please provide a more appropriate estimate in the adjoining box
 
 
 
 
In your opinion, which of the following numerical estimates best indicates the overall cost that has been expended (in present-value terms) on your building for the Initial retrofitting, Maintenance and Utilities (i.e Electricity and Gas) over the last 20-year period of its life?
 
$1,855,335
 
$2,059,124
 
$2,116,632
 
$2,125,127
 
$3,757,572
 
If none, please provide a more appropriate estimate in the adjoining box
 
 
 
 
In your opinion, which of the following numerical estimates best indicates the overall cost that has been expended (in present-value terms) on your building for the Initial retrofitting, Maintenance and Utilities (i.e. Electricity and Gas) over the last 25-year period of its life?
 
$1,830,826
 
$2,158,692
 
$2,507,602
 
$2,614,433
 
$4,239,642
 
If none, please provide a more appropriate estimate in the adjoining box
 
 
 
 
Given the option selected does the sum of $1, 219,977 provide a fair estimate of the capital cost of the retrofitting carried out on your building?
 
Yes
 
If No, please provide a more representative estimate in the adjoining box
 
 
 
 
Given the option selected. does the sum of $8,760 provide a fair estimate of the Annual Maintenance cost of your building?
 
Yes
 
If No, please provide a more representative estimate in the adjoining box
 
 
 
 
Given the option selected, does the sum of $83, 901 provide a fair estimate of the annual cost for Electrical and Gas Energy Usage for your building?
 
Yes
 
If No, please provide a more representative estimate in the adjoining box
 
 
 
 
Could you please indicate the number of years since your building has been retrofitted to comply with the selected building configuration permutation to the nearest 5-year period?
Please select the earlier year if in-between ranges
 
5
 
10
 
15
 
20
 
25
 
Other
 
 
 
 
In your opinion, which of the following numerical estimates best indicates the overall cost that has been expended (in present-value terms) on your building for the Initial retrofitting, Maintenance and Utilities (i.e Electricity and Gas) over the last 5-year period of its life?
 
$1,606,367
 
$1,607,392
 
$1,626,814
 
$1,671,764
 
$1,759,121
 
If none, please provide a more appropriate estimate in the adjoining box
 
 
 
 
In your opinion, which of the following numerical estimates best indicates the overall cost that has been expended (in present-value terms) on your building for the Initial retrofitting, Maintenance and Utilities (i.e. Electricity and Gas) over the last 10-year period of its life?
 
$1,748,260
 
$1,767,946
 
$1,792,072
 
$1,812,425
 
$2,187,987
 
If none, please provide a more appropriate estimate in the adjoining box
 
 
 
 
In your opinion, which of the following numerical estimates best indicates the overall cost that has been expended (in present-value terms) on your building for the Initial retrofitting, Maintenance and Utilities (i.e. Electricity and Gas) over the last 15-year period of its life?
 
$1,773,845
 
$1,950,191
 
$2,000,019
 
$2,016,215
 
$2,743,075
 
If none, please provide a more appropriate estimate in the adjoining box
 
 
 
 
In your opinion, which of the following numerical estimates best indicates the overall cost that has been expended (in present-value terms) on your building for the Initial retrofitting, Maintenance and Utilities (i.e Electricity and Gas) over the last 20-year period of its life?
 
$1,748,006
 
$1,915,103
 
$1,962,256
 
$1,969,222
 
$3,307,747
 
If none, please provide a more appropriate estimate in the adjoining box
 
 
 
 
In your opinion, which of the following numerical estimates best indicates the overall cost that has been expended (in present-value terms) on your building for the Initial retrofitting, Maintenance and Utilities (i.e. Electricity and Gas) over the last 25-year period of its life?
 
$1,726,873
 
$1,995,159
 
$2,317,627
 
$2,408,090
 
$3,697,954
 
If none, please provide a more appropriate estimate in the adjoining box
 
 
 
 
Given the option selected does the sum of $1, 403, 273 provide a fair estimate of the capital cost of the retrofitting carried out in your building?
 
Yes
 
If No, please provide a more representative estimate in the adjoining box
 
 
 
 
Given the option selected. does the sum of $4,206 provide a fair estimate of the Annual Maintenance cost of your building?
 
Yes
 
If No, please provide a more representative estimate in the adjoining box
 
 
 
 
Given the option selected, does the sum of $76,068 provide a fair estimate of the annual cost for Electrical and Gas Energy Usage for your building?
 
Yes
 
If No, please provide a more representative estimate in the adjoining box
 
 
 
 
Could you please indicate the number of years since your building has been retrofitted to comply with the selected building configuration permutation to the nearest 5-year period?
Please select the earlier year if in-between ranges
 
5
 
10
 
15
 
20
 
25
 
Other
 
 
 
 
In your opinion, which of the following numerical estimates best indicates the overall cost that has been expended (in present-value terms) on your building for the Initial retrofitting, Maintenance and Utilities (i.e Electricity and Gas) over the last 5-year period of its life?
 
$1,738,008
 
$1,738,896
 
$1,755,722
 
$1,794,663
 
$1,870,341
 
If none, please provide a more appropriate estimate in the adjoining box
 
 
 
 
In your opinion, which of the following numerical estimates best indicates the overall cost that has been expended (in present-value terms) on your building for the Initial retrofitting, Maintenance and Utilities (i.e. Electricity and Gas) over the last 10-year period of its life?
 
$1,855,401
 
$1,872,249
 
$1,892,896
 
$1,910,315
 
$2,231,738
 
If none, please provide a more appropriate estimate in the adjoining box
 
 
 
 
In your opinion, which of the following numerical estimates best indicates the overall cost that has been expended (in present-value terms) on your building for the Initial retrofitting, Maintenance and Utilities (i.e Electricity and Gas) over the last 15-year period of its life?
 
$1,876,603
 
$2,027,305
 
$2,069,888
 
$2,083,729
 
$2,704,894
 
If none, please provide a more appropriate estimate in the adjoining box
 
 
 
 
In your opinion, which of the following numerical estimates best indicates the overall cost that has been expended (in present-value terms) on your building for the Initial retrofitting, Maintenance and Utilities (i.e. Electricity and Gas) over the last 20-year period of its life?
 
$1,854,521
 
$1,997,319
 
$2,037,616
 
$2,043,569
 
$3,187,457
 
If none, please provide a more appropriate estimate in the adjoining box
 
 
 
 
In your opinion, which of the following numerical estimates best indicates the overall cost that has been expended (in present-value terms) on your building for the Initial retrofitting, Maintenance and Utilities (i.e Electricity and Gas) over the last 25-year period of its life?
 
$1,835,745
 
$2,064,641
 
$2,368,327
 
$2,447,863
 
$3,517,427
 
If none, please provide a more appropriate estimate in the adjoining box
 
 
 
 
Given the option selected does the sum of $1, 398, 186 provide a fair estimate of the capital cost of the retrofitting carried out in your building?
 
Yes
 
If No, please provide a more representative estimate in the adjoining box
 
 
 
 
Given the option selected. does the sum of $16,142 provide a fair estimate of the Annual Maintenance cost of your building?
 
Yes
 
If No, please provide a more representative estimate in the adjoining box
 
 
 
 
Given the option selected, does the sum of $92, 396 provide a fair estimate of the annual cost for Electrical and Gas Energy Usage for your building?
 
Yes
 
If No, please provide a more representative estimate in the adjoining box
 
 
 
 
Could you please indicate the number of years since your building has been retrofitted to comply with the selected building configuration permutation to the nearest 5-year period?
Please select the earlier year if in-between ranges
 
5
 
10
 
15
 
20
 
25
 
Other
 
 
 
 
In your opinion, which of the following numerical estimates best indicates the overall cost that has been expended (in present-value terms) on your building for the Initial retrofitting, Maintenance and Utilities (i.e Electricity and Gas) over the last 5-year period of its life?
 
$1,850,777
 
$1,851,977
 
$1,874,728
 
$1,927,378
 
$2,029,702
 
If none, please provide a more appropriate estimate in the adjoining box
 
 
 
 
In your opinion, which of the following numerical estimates best indicates the overall cost that has been expended (in present-value terms) on your building for the Initial retrofitting, Maintenance and Utilities (i.e Electricity and Gas) over the last 10-year period of its life?
 
$2,027,229
 
$2,050,670
 
$2,079,397
 
$2,103,632
 
$2,550,825
 
If none, please provide a more appropriate estimate in the adjoining box
 
 
 
 
In your opinion, which of the following numerical estimates best indicates the overall cost that has been expended (in present-value terms) on your building for the Initial retrofitting, Maintenance and Utilities (i.e Electricity and Gas) over the last 15-year period of its life?
 
$2,059,307
 
$2,269,800
 
$2,329,277
 
$2,348,610
 
$3,216,220
 
If none, please provide a more appropriate estimate in the adjoining box
 
 
 
 
In your opinion, which of the following numerical estimates best indicates the overall cost that has been expended (in present-value terms) on your building for the Initial retrofitting, Maintenance and Utilities (i.e Electricity and Gas) over the last 20-year period of its life?
 
$2,028,464
 
$2,097,913
 
$2,284,202
 
$2,292,517
 
$3,890,237
 
If none, please provide a more appropriate estimate in the adjoining box
 
 
 
 
In your opinion, which of the following numerical estimates best indicates the overall cost that has been expended (in present-value terms) on your building for the Initial retrofitting, Maintenance and Utilities (i.e Electricity and Gas) over the last 25-year period of its life?
 
$2,004,345
 
$2,325,168
 
$2,657,059
 
$2,760,809
 
$4,361,411
 
If none, please provide a more appropriate estimate in the adjoining box
 
 
 
 
Given the option selected does the sum of $1, 387, 798 provide a fair estimate of the capital cost of the retrofitting carried out in your building?
 
Yes
 
If No, please provide a more representative estimate in the adjoining box
 
 
 
 
Given the option selected. does the sum of $8,760 provide a fair estimate of the Annual Maintenance cost of your building?
 
Yes
 
If No, please provide a more representative estimate in the adjoining box
 
 
 
 
Given the option selected, does the sum of $69, 380 provide a fair estimate of the annual cost for Electrical and Gas Energy Usage for your building?
 
Yes
 
If No, please provide a more representative estimate in the adjoining box
 
 
 
 
Could you please indicate the number of years since your building has been retrofitted to comply with the selected building configuration permutation to the nearest 5-year period?
Please select the earlier year if in-between ranges
 
5
 
10
 
15
 
20
 
25
 
Other
 
 
 
 
In your opinion, which of the following numerical estimates best indicates the overall cost that has been expended (in present-value terms) on your building for the Initial retrofitting, Maintenance and Utilities (i.e Electricity and Gas) over the last 5-year period of its life?
 
$1,713,634
 
$1,714,498
 
$1,730,877
 
$1,768,782
 
$1,842,448
 
If none, please provide a more appropriate estimate in the adjoining box
 
 
 
 
In your opinion, which of the following numerical estimates best indicates the overall cost that has been expended (in present-value terms) on your building for the Initial retrofitting, Maintenance and Utilities (i.e Electricity and Gas) over the last 10-year period of its life?
 
$1,835,275
 
$1,851,950
 
$1,872,386
 
$1,889,625
 
$2,207,742
 
If none, please provide a more appropriate estimate in the adjoining box
 
 
 
 
In your opinion, which of the following numerical estimates best indicates the overall cost that has been expended (in present-value terms) on your building for the Initial retrofitting, Maintenance and Utilities (i.e Electricity and Gas) over the last 15-year period of its life?
 
$1,857,063
 
$2,006,472
 
$2,042,689
 
$2,062,411
 
$2,678,244
 
If none, please provide a more appropriate estimate in the adjoining box
 
 
 
 
In your opinion, which of the following numerical estimates best indicates the overall cost that has been expended (in present-value terms) on your building for the Initial retrofitting, Maintenance and Utilities (i.e Electricity and Gas) over the last 20-year period of its life?
 
$1,835,171
 
$1,976,743
 
$2,022,596
 
$2,016,695
 
$3,156,663
 
If none, please provide a more appropriate estimate in the adjoining box
 
 
 
 
In your opinion, which of the following numerical estimates best indicates the overall cost that has been expended (in present-value terms) on your building for the Initial retrofitting, Maintenance and Utilities (i.e Electricity and Gas) over the last 25-year period of its life?
 
$1,817,612
 
$2,045,101
 
$2,308,612
 
$2,384,501
 
$3,488,959
 
If none, please provide a more appropriate estimate in the adjoining box
 
 
 
 
Given the option selected does the sum of $1, 571, 094 provide a fair estimate of the capital cost of the retrofitting carried out in your building?
 
Yes
 
If No, please provide a more representative estimate in the adjoining box
 
 
 
 
Given the option selected. does the sum of $4,206 provide a fair estimate of the Annual Maintenance cost of your building?
 
Yes
 
If No, please provide a more representative estimate in the adjoining box
 
 
 
 
Given the option selected, does the sum of $61, 504 provide a fair estimate of the annual cost for Electrical and Gas Energy Usage for your building?
 
Yes
 
If No, please provide a more representative estimate in the adjoining box
 
 
 
 
Could you please indicate the number of years since your building has been retrofitted to the selected building configuration permutation to the nearest 5-year period?
Please select the earlier year if in-between ranges
 
5
 
10
 
15
 
20
 
25
 
Other
 
 
 
 
In your opinion, which of the following numerical estimates best indicates the overall cost that has been expended (in present-value terms) on your building for the Initial retrofitting, Maintenance and Utilities (i.e Electricity and Gas) over the last 5-year period of its life?
 
$1,845,098
 
$1,845,825
 
$1,859,598
 
$1,891,474
 
$1,953,422
 
If none, please provide a more appropriate estimate in the adjoining box
 
 
 
 
In your opinion, which of the following numerical estimates best indicates the overall cost that has been expended (in present-value terms) on your building for the Initial retrofitting, Maintenance and Utilities (i.e Electricity and Gas) over the last 10-year period of its life?
 
$1,942,170
 
$1,955,998
 
$1,972,944
 
$1,987,240
 
$2,251,042
 
If none, please provide a more appropriate estimate in the adjoining box
 
 
 
 
In your opinion, which of the following numerical estimates best indicates the overall cost that has been expended (in present-value terms) on your building for the Initial retrofitting, Maintenance and Utilities (i.e Electricity and Gas) over the last 15-year period of its life?
 
$1,959,557
 
$2,083,239
 
$2,118,186
 
$2,129,546
 
$2,639,338
 
If none, please provide a more appropriate estimate in the adjoining box
 
 
 
 
In your opinion, which of the following numerical estimates best indicates the overall cost that has been expended (in present-value terms) on your building for the Initial retrofitting, Maintenance and Utilities (i.e Electricity and Gas) over the last 20-year period of its life?
 
$1,941,434
 
$2,058,629
 
$2,091,701
 
$2,096,586
 
$3,035,378
 
If none, please provide a more appropriate estimate in the adjoining box
 
 
 
 
In your opinion, which of the following numerical estimates best indicates the overall cost that has been expended (in present-value terms) on your building for the Initial retrofitting, Maintenance and Utilities (i.e Electricity and Gas) over the last 25-year period of its life?
 
$1,926,246
 
$2,114,219
 
$2,358,830
 
$2,423,751
 
$3,307,267
 
If none, please provide a more appropriate estimate in the adjoining box
 
 
 
 
Given the option selected does the sum of $1, 276, 156 provide a fair estimate of the capital cost of the retrofitting carried out in your building?
 
Yes
 
If No, please provide a more representative estimate in the adjoining box
 
 
 
 
Given the option selected. does the sum of $17,742 provide a fair estimate of the Annual Maintenance cost of your building?
 
Yes
 
If No, please provide a more representative estimate in the adjoining box
 
 
 
 
Given the option selected, does the sum of $76, 760 provide a fair estimate of the annual cost for Electrical and Gas Energy Usage for your building?
 
Yes
 
If No, please provide a more representative estimate in the adjoining box
 
 
 
 
Could you please indicate the number of years since your building has been retrofitted to the selected building configuration permutation to the nearest 5-year period?
Please select the earlier year if in-between ranges
 
5
 
10
 
15
 
20
 
25
 
Other
 
 
 
 
In your opinion, which of the following numerical estimates best indicates the overall cost that has been expended (in present-value terms) on your building for the Initial retrofitting, Maintenance and Utilities (i.e Electricity and Gas) over the last 5-year period of its life?
 
$1,670,219
 
$1,671,265
 
$1,691,073
 
$1,736,915
 
$1,826,006
 
If none, please provide a more appropriate estimate in the adjoining box
 
 
 
 
In your opinion, which of the following numerical estimates best indicates the overall cost that has been expended (in present-value terms) on your building for the Initial retrofitting, Maintenance and Utilities (i.e Electricity and Gas) over the last 10-year period of its life?
 
$1,831,571
 
$1,852,268
 
$1,877,633
 
$1,899,031
 
$2,293,881
 
If none, please provide a more appropriate estimate in the adjoining box
 
 
 
 
In your opinion, which of the following numerical estimates best indicates the overall cost that has been expended (in present-value terms) on your building for the Initial retrofitting, Maintenance and Utilities (i.e Electricity and Gas) over the last 15-year period of its life?
 
$1,861,711
 
$2,048,146
 
$2,100,824
 
$2,117,947
 
$2,886,390
 
If none, please provide a more appropriate estimate in the adjoining box
 
 
 
 
In your opinion, which of the following numerical estimates best indicates the overall cost that has been expended (in present-value terms) on your building for the Initial retrofitting, Maintenance and Utilities (i.e Electricity and Gas) over the last 20-year period of its life?
 
$1,834,394
 
$2,011,050
 
$2,060,901
 
$2,068,265
 
$3,483,367
 
If none, please provide a more appropriate estimate in the adjoining box
 
 
 
 
In your opinion, which of the following numerical estimates best indicates the overall cost that has been expended (in present-value terms) on your building for the Initial retrofitting, Maintenance and Utilities (i.e Electricity and Gas) over the last 25-year period of its life?
 
$1,813,428
 
$2,097,792
 
$2,350,802
 
$2,439,369
 
$3,902,628
 
If none, please provide a more appropriate estimate in the adjoining box
 
 
 
 
Given the option selected does the sum of $1, 284, 775 provide a fair estimate of the capital cost of the retrofitting carried out in your building?
 
Yes
 
If No, please provide a more representative estimate in the adjoining box
 
 
 
 
Given the option selected. does the sum of $10,360 provide a fair estimate of the Annual Maintenance cost of your building?
 
Yes
 
If No, please provide a more representative estimate in the adjoining box
 
 
 
 
Given the option selected, does the sum of $65, 499 provide a fair estimate of the annual cost for Electrical and Gas Energy Usage for your building?
 
Yes
 
If No, please provide a more representative estimate in the adjoining box
 
 
 
 
Could you please indicate the number of years since your building has been retrofitted to the selected building configuration permutation to the nearest 5-year period?
Please select the earlier year if in-between ranges
 
5
 
10
 
15
 
20
 
25
 
Other
 
 
 
 
In your opinion, which of the following numerical estimates best indicates the overall cost that has been expended (in present-value terms) on your building for the Initial retrofitting, Maintenance and Utilities (i.e Electricity and Gas) over the last 5-year period of its life?
 
$1,601,102
 
$1,601,941
 
$1,617,842
 
$1,654,641
 
$1,726,158
 
If none, please provide a more appropriate estimate in the adjoining box
 
 
 
 
In your opinion, which of the following numerical estimates best indicates the overall cost that has been expended (in present-value terms) on your building for the Initial retrofitting, Maintenance and Utilities (i.e Electricity and Gas) over the last 10-year period of its life?
 
$1,725,072
 
$1,741,479
 
$1,761,587
 
$1,778,550
 
$2,091,562
 
If none, please provide a more appropriate estimate in the adjoining box
 
 
 
 
In your opinion, which of the following numerical estimates best indicates the overall cost that has been expended (in present-value terms) on your building for the Initial retrofitting, Maintenance and Utilities (i.e Electricity and Gas) over the last 15-year period of its life?
 
$1,748,708
 
$1,896,420
 
$1,938,157
 
$1,951,723
 
$2,560,558
 
If none, please provide a more appropriate estimate in the adjoining box
 
 
 
 
In your opinion, which of the following numerical estimates best indicates the overall cost that has been expended (in present-value terms) on your building for the Initial retrofitting, Maintenance and Utilities (i.e Electricity and Gas) over the last 20-year period of its life?
 
$1,727,065
 
$1,867,0292
 
$1,906,526
 
$1,912,361
 
$3,033,542
 
If none, please provide a more appropriate estimate in the adjoining box
 
 
 
 
In your opinion, which of the following numerical estimates best indicates the overall cost that has been expended (in present-value terms) on your building for the Initial retrofitting, Maintenance and Utilities (i.e. Electricity and Gas) over the last 25-year period of its life?
 
$1,709,476
 
$1,934,258
 
$2,160,826
 
$2,233,027
 
$3,360,940
 
If none, please provide a more appropriate estimate in the adjoining box
 
 
 
 
Given the option selected does the sum of $1,468, 071 provide a fair estimate of the capital cost of the retrofitting carried out in your building?
 
Yes
 
If No, please provide a more representative estimate in the adjoining box
 
 
 
 
Given the option selected. does the sum of $5,806 provide a fair estimate of the Annual Maintenance cost of your building?
 
Yes
 
If No, please provide a more representative estimate in the adjoining box
 
 
 
 
Given the option selected, does the sum of $57, 666 provide a fair estimate of the annual cost for Electrical and Gas Energy Usage for your building?
 
Yes
 
If No, please provide a more representative estimate in the adjoining box
 
 
 
 
Could you please indicate the number of years since your building has been retrofitted to comply with the selected building configuration permutation to the nearest 5-year period?
Please select the earlier year if in-between ranges
 
5
 
10
 
15
 
20
 
25
 
Other
 
 
 
 
In your opinion, which of the following numerical estimates best indicates the overall cost that has been expended (in present-value terms) on your building for the Initial retrofitting, Maintenance and Utilities (i.e Electricity and Gas) over the last 5-year period of its life?
 
$1,732,744
 
$1,733,446
 
$1,746,750
 
$1,777,540
 
$1,837,378
 
If none, please provide a more appropriate estimate in the adjoining box
 
 
 
 
In your opinion, which of the following numerical estimates best indicates the overall cost that has been expended (in present-value terms) on your building for the Initial retrofitting, Maintenance and Utilities (i.e Electricity and Gas) over the last 10-year period of its life?
 
$1,832,213
 
$1,845,782
 
$1,862,411
 
$1,876,441
 
$2,135,313
 
If none, please provide a more appropriate estimate in the adjoining box
 
 
 
 
In your opinion, which of the following numerical estimates best indicates the overall cost that has been expended (in present-value terms) on your building for the Initial retrofitting , Maintenance and Utilities (i.e Electricity and Gas) over the last 15-year period of its life?
 
$1,851,465
 
$1,973,534
 
$2,008,026
 
$2,019,237
 
$2,522,378
 
If none, please provide a more appropriate estimate in the adjoining box
 
 
 
 
In your opinion, which of the following numerical estimates best indicates the overall cost that has been expended (in present-value terms) on your building for the Initial retrofitting, Maintenance and Utilities (i.e Electricity and Gas) over the last 20-year period of its life?
 
$1,833,579
 
$1,949,245
 
$1,981,886
 
$1,986,708
 
$2,913,251
 
If none, please provide a more appropriate estimate in the adjoining box
 
 
 
 
In your opinion, which of the following numerical estimates best indicates the overall cost that has been expended (in present-value terms) on your building for the Initial retrofitting, Maintenance and Utilities (i.e Electricity and Gas) over the last 25-year period of its life?
 
$1,818,348
 
$2,003,740
 
$2,211,527
 
$2,272,799
 
$3,180,413
 
If none, please provide a more appropriate estimate in the adjoining box
 
 
 
 
Given the option selected does the sum of $1,463, 016 provide a fair estimate of the capital cost of the retrofitting carried out in your building?
 
Yes
 
If No, please provide a more representative estimate in the adjoining box
 
 
 
 
Given the option selected. does the sum of $17,742 provide a fair estimate of the Annual Maintenance cost of your building?
 
Yes
 
If No, please provide a more representative estimate in the adjoining box
 
 
 
 
Given the option selected, does the sum of $75, 864 provide a fair estimate of the annual cost for Electrical and Gas Energy Usage for your building?
 
Yes
 
If No, please provide a more representative estimate in the adjoining box
 
 
 
 
Could you please indicate the number of years since your building has been retrofitted to comply with the selected building configuration permutation to the nearest 5-year period?
Please select the earlier year if in-between ranges
 
5
 
10
 
15
 
20
 
25
 
Other
 
 
 
 
In your opinion, which of the following numerical estimates best indicates the overall cost that has been expended (in present-value terms) on your building for the Initial retrofitting, Maintenance and Utilities (i.e Electricity and Gas) over the last 5-year period of its life?
 
$1,853,344
 
$1,854,379
 
$1,874,000
 
$1,919,407
 
$2,007,654
 
If none, please provide a more appropriate estimate in the adjoining box
 
 
 
 
In your opinion, which of the following numerical estimates best indicates the overall cost that has been expended (in present-value terms) on your building for the Initial retrofitting , Maintenance and Utilities (i.e Electricity and Gas) over the last 10-year period of its life?
 
$2,014,075
 
$2,034,609
 
$2,059,775
 
$2,081,005
 
$2,472,759
 
If none, please provide a more appropriate estimate in the adjoining box
 
 
 
 
In your opinion, which of the following numerical estimates best indicates the overall cost that has been expended (in present-value terms) on your building for the Initial retrofitting, Maintenance and Utilities (i.e Electricity and Gas) over the last 15-year period of its life?
 
$2,044,413
 
$2,229,523
 
$2,281,828
 
$2,298,829
 
$3,061,815
 
If none, please provide a more appropriate estimate in the adjoining box
 
 
 
 
In your opinion, which of the following numerical estimates best indicates the overall cost that has been expended (in present-value terms) on your building for the Initial retrofitting, Maintenance and Utilities (i.e Electricity and Gas) over the last 20-year period of its life?
 
$2,017,290
 
$2,192,691
 
$2,242,188
 
$2,249,500
 
$3,654,553
 
If none, please provide a more appropriate estimate in the adjoining box
 
 
 
 
In your opinion, which of the following numerical estimates best indicates the overall cost that has been expended (in present-value terms) on your building for the Initial retrofitting, Maintenance and Utilities (i.e Electricity and Gas) over the last 25-year period of its life?
 
$1,996,368
 
$2,278,657
 
$2,524,514
 
$2,611,998
 
$4,070,324
 
If none, please provide a more appropriate estimate in the adjoining box
 
 
 
 
Given the option selected does the sum of $1,509, 635 provide a fair estimate of the capital cost of the retrofitting carried out in your building?
 
Yes
 
If No, please provide a more representative estimate in the adjoining box
 
 
 
 
Given the option selected. does the sum of $10,360 provide a fair estimate of the Annual Maintenance cost of your building?
 
Yes
 
If No, please provide a more representative estimate in the adjoining box
 
 
 
 
Given the option selected, does the sum of $57, 126 provide a fair estimate of the annual cost for Electrical and Gas Energy Usage for your building?
 
Yes
 
If No, please provide a more representative estimate in the adjoining box
 
 
 
 
Could you please indicate the number of years since your building has been retrofitted to comply with the selected building configuration permutation to the nearest 5-year period?
Please select the earlier year if in-between ranges
 
5
 
10
 
15
 
20
 
25
 
Other
 
 
 
 
In your opinion, which of the following numerical estimates best indicates the overall cost that has been expended (in present-value terms) on your building for the Initial retrofitting, Maintenance and Utilities (i.e Electricity and Gas) over the last 5-year period of its life?
 
$1,791,048
 
$1,791,794
 
$1,805,940
 
$1,838,677
 
$1,902,301
 
If none, please provide a more appropriate estimate in the adjoining box
 
 
 
 
In your opinion, which of the following numerical estimates best indicates the overall cost that has been expended (in present-value terms) on your building for the Initial retrofitting, Maintenance and Utilities (i.e Electricity and Gas) over the last 10-year period of its life?
 
$1,901,693
 
$1,916,303
 
$1,934,207
 
$1,949,312
 
$2,228,030
 
If none, please provide a more appropriate estimate in the adjoining box
 
 
 
 
In your opinion, which of the following numerical estimates best indicates the overall cost that has been expended (in present-value terms) on your building for the Initial retrofitting, Maintenance and Utilities (i.e Electricity and Gas) over the last 15-year period of its life?
 
$1,922,006
 
$2,053,300
 
$2,090,399
 
$2,102,457
 
$2,643,626
 
If none, please provide a more appropriate estimate in the adjoining box
 
 
 
 
In your opinion, which of the following numerical estimates best indicates the overall cost that has been expended (in present-value terms) on your building for the Initial retrofitting, Maintenance and Utilities (i.e Electricity and Gas) over the last 20-year period of its life?
 
$1,902,768
 
$2,027,176
 
$2,062,283
 
$2,067,470
 
$3,064,041
 
If none, please provide a more appropriate estimate in the adjoining box
 
 
 
 
In your opinion, which of the following numerical estimates best indicates the overall cost that has been expended (in present-value terms) on your building for the Initial retrofitting, Maintenance and Utilities (i.e Electricity and Gas) over the last 25-year period of its life?
 
$1,887,703
 
$2,087,804
 
$2,289,599
 
$2,353,880
 
$3,357,834
 
If none, please provide a more appropriate estimate in the adjoining box
 
 
 
 
Given the option selected does the sum of $1,692, 931 provide a fair estimate of the capital cost of the retrofitting carried out in your building?
 
Yes
 
If No, please provide a more representative estimate in the adjoining box
 
 
 
 
Given the option selected. does the sum of $5,806 provide a fair estimate of the Annual Maintenance cost of your building?
 
Yes
 
If No, please provide a more representative estimate in the adjoining box
 
 
 
 
Given the option selected, does the sum of $52,873 provide a fair estimate of the annual cost for Electrical and Gas Energy Usage for your building?
 
Yes
 
If No, please provide a more representative estimate in the adjoining box
 
 
 
 
Could you please indicate the number of years since your building has been retrofitted to comply with the selected building configuration permutation to the nearest 5-year period?
Please select the earlier year if in-between ranges
 
5
 
10
 
15
 
20
 
25
 
Other
 
 
 
 
In your opinion, which of the following numerical estimates best indicates the overall cost that has been expended (in present-value terms) on your building for the Initial retrofitting, Maintenance and Utilities (i.e Electricity and Gas) over the last 5-year period of its life?
 
$1,937,619
 
$1,938,268
 
$1,950,568
 
$1,979,033
 
$2,034,353
 
If none, please provide a more appropriate estimate in the adjoining box
 
 
 
 
In your opinion, which of the following numerical estimates best indicates the overall cost that has been expended (in present-value terms) on your building for the Initial retrofitting, Maintenance and Utilities (i.e Electricity and Gas) over the last 10-year period of its life?
 
$2,029,573
 
$2,042,117
 
$2,057,491
 
$2,070,460
 
$2,309,783
 
If none, please provide a more appropriate estimate in the adjoining box
 
 
 
 
In your opinion, which of the following numerical estimates best indicates the overall cost that has been expended (in present-value terms) on your building for the Initial retrofitting, Maintenance and Utilities (i.e Electricity and Gas) over the last 15-year period of its life?
 
$2,047,000
 
$2,159,731
 
$2,191,585
 
$2,201,938
 
$2,666,595
 
If none, please provide a more appropriate estimate in the adjoining box
 
 
 
 
In your opinion, which of the following numerical estimates best indicates the overall cost that has been expended (in present-value terms) on your building for the Initial retrofitting, Maintenance and Utilities (i.e Electricity and Gas) over the last 20-year period of its life?
 
$2,030,482
 
$2,137,301
 
$2,167,444
 
$2,171,897
 
$3,027,571
 
If none, please provide a more appropriate estimate in the adjoining box
 
 
 
 
In your opinion, which of the following numerical estimates best indicates the overall cost that has been expended (in present-value terms) on your building for the Initial retrofitting, Maintenance and Utilities (i.e Electricity and Gas) over the last 25-year period of its life?
 
$2,016,664
 
$2,188,007
 
$2,380,992
 
$2,437,699
 
$3,275,512
 
If none, please provide a more appropriate estimate in the adjoining box
 
 
 
 
Given the option selected does the sum of $1,218, 549 provide a fair estimate of the capital cost of the retrofitting carried out in your building?
 
Yes
 
If No, please provide a more representative estimate in the adjoining box
 
 
 
 
Given the option selected. does the sum of $16,142 provide a fair estimate of the Annual Maintenance cost of your building?
 
Yes
 
If No, please provide a more representative estimate in the adjoining box
 
 
 
 
Given the option selected, does the sum of $92,472 provide a fair estimate of the annual cost for Electrical and Gas Energy Usage for your building?
 
Yes
 
If No, please provide a more representative estimate in the adjoining box
 
 
 
 
Could you please indicate the number of years since your building has been retrofitted to comply with the selected building configuration permutation to the nearest 5-year period?
Please select the earlier year if in-between ranges
 
5
 
10
 
15
 
20
 
25
 
Other
 
 
 
 
In your opinion, which of the following numerical estimates best indicates the overall cost that has been expended (in present-value terms) on your building for the Initial retrofitting, Maintenance and Utilities (i.e Electricity and Gas) over the last 5-year period of its life?
 
$1,671,456
 
$1,672,658
 
$1,695,424
 
$1,748,111
 
$1,850,507
 
If none, please provide a more appropriate estimate in the adjoining box
 
 
 
 
In your opinion, which of the following numerical estimates best indicates the overall cost that has been expended (in present-value terms) on your building for the Initial retrofitting, Maintenance and Utilities (i.e Electricity and Gas) over the last 10-year period of its life?
 
$1,852,359
 
$1,875,977
 
$1,904,922
 
$1,929,340
 
$2,379,922
 
If none, please provide a more appropriate estimate in the adjoining box
 
 
 
 
In your opinion, which of the following numerical estimates best indicates the overall cost that has been expended (in present-value terms) on your building for the Initial retrofitting, Maintenance and Utilities (i.e Electricity and Gas) over the last 15-year period of its life?
 
$1,887,444
 
$2,100,413
 
$2,160,589
 
$2,180,149
 
$3,057,962
 
If none, please provide a more appropriate estimate in the adjoining box
 
 
 
 
In your opinion, which of the following numerical estimates best indicates the overall cost that has been expended (in present-value terms) on your building for the Initial retrofitting, Maintenance and Utilities (i.e Electricity and Gas) over the last 20-year period of its life?
 
$1,856,239
 
$2,058,037
 
$2,114,984
 
$2,123,396
 
$3,739,905
 
If none, please provide a more appropriate estimate in the adjoining box
 
 
 
 
In your opinion, which of the following numerical estimates best indicates the overall cost that has been expended (in present-value terms) on your building for the Initial retrofitting, Maintenance and Utilities (i.e Electricity and Gas) over the last 25-year period of its life?
 
$1,830,880
 
$2,154,970
 
$2,462,866
 
$2,565,417
 
$4,211,949
 
If none, please provide a more appropriate estimate in the adjoining box
 
 
 
 
Given the option selected does the sum of $1,279, 633 provide a fair estimate of the capital cost of the retrofitting carried out in your building?
 
Yes
 
If No, please provide a more representative estimate in the adjoining box
 
 
 
 
Given the option selected. does the sum of $16,142 provide a fair estimate of the Annual Maintenance cost of your building?
 
Yes
 
If No, please provide a more representative estimate in the adjoining box
 
 
 
 
Given the option selected, does the sum of $92,370 provide a fair estimate of the annual cost for Electrical and Gas Energy Usage for your building?
 
Yes
 
If No, please provide a more representative estimate in the adjoining box
 
 
 
 
Could you please indicate the number of years since your building has been retrofitted to comply with the selected building configuration permutation to the nearest 5-year period?
Please select the earlier year if in-between ranges
 
5
 
10
 
15
 
20
 
25
 
Other
 
 
 
 
In your opinion, which of the following numerical estimates best indicates the overall cost that has been expended (in present-value terms) on your building for the Initial retrofitting, Maintenance and Utilities (i.e Electricity and Gas) over the last 5-year period of its life?
 
$1,732,115
 
$1,733,315
 
$1,756,060
 
$1,808,697
 
$1,910,997
 
If none, please provide a more appropriate estimate in the adjoining box
 
 
 
 
In your opinion, which of the following numerical estimates best indicates the overall cost that has been expended (in present-value terms) on your building for the Initial retrofitting, Maintenance and Utilities (i.e Electricity and Gas) over the last 10-year period of its life?
 
$1,912,828
 
$1,936,423
 
$1,965,340
 
$1,989,735
 
$2,439,880
 
If none, please provide a more appropriate estimate in the adjoining box
 
 
 
 
In your opinion, which of the following numerical estimates best indicates the overall cost that has been expended (in present-value terms) on your building for the Initial retrofitting, Maintenance and Utilities (i.e Electricity and Gas) over the last 15-year period of its life?
 
$1,947,855
 
$2,160,609
 
$2,220,725
 
$2,240,265
 
$3,117,195
 
If none, please provide a more appropriate estimate in the adjoining box
 
 
 
 
In your opinion, which of the following numerical estimates best indicates the overall cost that has been expended (in present-value terms) on your building for the Initial retrofitting, Maintenance and Utilities (i.e Electricity and Gas) over the last 20-year period of its life?
 
$1,916,681
 
$2,118,277
 
$2,175,166
 
$2,183,570
 
$3,798,452
 
If none, please provide a more appropriate estimate in the adjoining box
 
 
 
 
In your opinion, which of the following numerical estimates best indicates the overall cost that has been expended (in present-value terms) on your building for the Initial retrofitting, Maintenance and Utilities (i.e Electricity and Gas) over the last 25-year period of its life?
 
$1,891,360
 
$2,215,131
 
$2,522,873
 
$2,625,335
 
$4,270,083
 
If none, please provide a more appropriate estimate in the adjoining box
 
 
 
 
Given the option selected does the sum of $1,485, 799 provide a fair estimate of the capital cost of the retrofitting carried out in your building?
 
Yes
 
If No, please provide a more representative estimate in the adjoining box
 
 
 
 
Given the option selected. does the sum of $8,760 provide a fair estimate of the Annual Maintenance cost of your building?
 
Yes
 
If No, please provide a more representative estimate in the adjoining box
 
 
 
 
Given the option selected, does the sum of $56,965 provide a fair estimate of the annual cost for Electrical and Gas Energy Usage for your building?
 
Yes
 
If No, please provide a more representative estimate in the adjoining box
 
 
 
 
Could you please indicate the number of years since your building has been retrofitted to comply with the selected building configuration permutation to the nearest 5-year period?
Please select the earlier year if in-between ranges
 
5
 
10
 
15
 
20
 
25
 
Other
 
 
 
 
In your opinion, which of the following numerical estimates best indicates the overall cost that has been expended (in present-value terms) on your building for the Initial retrofitting, Maintenance and Utilities (i.e Electricity and Gas) over the last 5-year period of its life?
 
$1,759,868
 
$1,760,595
 
$1,774,372
 
$1,806,255
 
$1,868,218
 
If none, please provide a more appropriate estimate in the adjoining box
 
 
 
 
In your opinion, which of the following numerical estimates best indicates the overall cost that has been expended (in present-value terms) on your building for the Initial retrofitting, Maintenance and Utilities (i.e Electricity and Gas) over the last 10-year period of its life?
 
$1,866,071
 
$1,880,242
 
$1,897,608
 
$1,912,258
 
$2,182,598
 
If none, please provide a more appropriate estimate in the adjoining box
 
 
 
 
In your opinion, which of the following numerical estimates best indicates the overall cost that has been expended (in present-value terms) on your building for the Initial retrofitting, Maintenance and Utilities (i.e Electricity and Gas) over the last 15-year period of its life?
 
$1,885,902
 
$2,013,290
 
$2,049,285
 
$2,060,985
 
$2,586,053
 
If none, please provide a more appropriate estimate in the adjoining box
 
 
 
 
In your opinion, which of the following numerical estimates best indicates the overall cost that has been expended (in present-value terms) on your building for the Initial retrofitting, Maintenance and Utilities (i.e Electricity and Gas) over the last 20-year period of its life?
 
$1,867,236
 
$1,987,943
 
$2,022,006
 
$2,027,038
 
$2,993,960
 
If none, please provide a more appropriate estimate in the adjoining box
 
 
 
 
In your opinion, which of the following numerical estimates best indicates the overall cost that has been expended (in present-value terms) on your building for the Initial retrofitting, Maintenance and Utilities (i.e Electricity and Gas) over the last 25-year period of its life?
 
$1,852,206
 
$2,046,136
 
$2,248,761
 
$2,311,641
 
$3,276,995
 
If none, please provide a more appropriate estimate in the adjoining box
 
 
 
 
Given the option selected does the sum of $1,507, 660 provide a fair estimate of the capital cost of the retrofitting carried out in your building?
 
Yes
 
If No, please provide a more representative estimate in the adjoining box
 
 
 
 
Given the option selected. does the sum of $8,760 provide a fair estimate of the Annual Maintenance cost of your building?
 
Yes
 
If No, please provide a more representative estimate in the adjoining box
 
 
 
 
Given the option selected, does the sum of $69,185 provide a fair estimate of the annual cost for Electrical and Gas Energy Usage for your building?
 
Yes
 
If No, please provide a more representative estimate in the adjoining box
 
 
 
 
Could you please indicate the number of years since your building has been retrofitted to comply with the selected building configuration permutation to the nearest 5-year period?
Please select the earlier year if in-between ranges
 
5
 
10
 
15
 
20
 
25
 
Other
 
 
 
 
In your opinion, which of the following numerical estimates best indicates the overall cost that has been expended (in present-value terms) on your building for the Initial retrofitting, Maintenance and Utilities (i.e Electricity and Gas) over the last 5-year period of its life?
 
$1,832,686
 
$1,833,548
 
$1,849,886
 
$1,887,696
 
$1,961,180
 
If none, please provide a more appropriate estimate in the adjoining box
 
 
 
 
In your opinion, which of the following numerical estimates best indicates the overall cost that has been expended (in present-value terms) on your building for the Initial retrofitting, Maintenance and Utilities (i.e Electricity and Gas) over the last 10-year period of its life?
 
$1,953,949
 
$1,970,580
 
$1,990,961
 
$2,008,155
 
$2,325,426
 
If none, please provide a more appropriate estimate in the adjoining box
 
 
 
 
In your opinion, which of the following numerical estimates best indicates the overall cost that has been expended (in present-value terms) on your building for the Initial retrofitting, Maintenance and Utilities (i.e Electricity and Gas) over the last 15-year period of its life?
 
$1,975,612
 
$2,124,603
 
$2,166,702
 
$2,180,386
 
$2,794,495
 
If none, please provide a more appropriate estimate in the adjoining box
 
 
 
 
In your opinion, which of the following numerical estimates best indicates the overall cost that has been expended (in present-value terms) on your building for the Initial retrofitting, Maintenance and Utilities (i.e Electricity and Gas) over the last 20-year period of its life?
 
$1,953,781
 
$2,094,958
 
$2,134,797
 
$2,140,682
 
$3,271,575
 
If none, please provide a more appropriate estimate in the adjoining box
 
 
 
 
In your opinion, which of the following numerical estimates best indicates the overall cost that has been expended (in present-value terms) on your building for the Initial retrofitting, Maintenance and Utilities (i.e Electricity and Gas) over the last 25-year period of its life?
 
$1,936,300
 
$2,163,168
 
$2,426,490
 
$2,502,215
 
$3,603,082
 
If none, please provide a more appropriate estimate in the adjoining box
 
 
 
 
Given the option selected does the sum of $1,690,956 provide a fair estimate of the capital cost of the retrofitting carried out in your building?
 
Yes
 
If No, please provide a more representative estimate in the adjoining box
 
 
 
 
Given the option selected. does the sum of $4,206 provide a fair estimate of the Annual Maintenance cost of your building?
 
Yes
 
If No, please provide a more representative estimate in the adjoining box
 
 
 
 
Given the option selected, does the sum of $61,309 provide a fair estimate of the annual cost for Electrical and Gas Energy Usage for your building?
 
Yes
 
If No, please provide a more representative estimate in the adjoining box
 
 
 
 
Could you please indicate the number of years since your building has been retrofitted to comply with the selected building configuration permutation to the nearest 5-year period?
Please select the earlier year if in-between ranges
 
5
 
10
 
15
 
20
 
25
 
Other
 
 
 
 
In your opinion, which of the following numerical estimates best indicates the overall cost that has been expended (in present-value terms) on your building for the Initial retrofitting, Maintenance and Utilities (i.e Electricity and Gas) over the last 5-year period of its life?
 
$1,964,150
 
$1,964,875
 
$1,978,607
 
$2,010,388
 
$2,072,153
 
If none, please provide a more appropriate estimate in the adjoining box
 
 
 
 
In your opinion, which of the following numerical estimates best indicates the overall cost that has been expended (in present-value terms) on your building for the Initial retrofitting, Maintenance and Utilities (i.e Electricity and Gas) over the last 10-year period of its life?
 
$2,060,844
 
$2,074,627
 
$2,091,519
 
$2,105,769
 
$2,368,726
 
If none, please provide a more appropriate estimate in the adjoining box
 
 
 
 
In your opinion, which of the following numerical estimates best indicates the overall cost that has been expended (in present-value terms) on your building for the Initial retrofitting, Maintenance and Utilities (i.e Electricity and Gas) over the last 15-year period of its life?
 
$2,078,106
 
$2,201,370
 
$2,236,199
 
$2,247,520
 
$2,755,589
 
If none, please provide a more appropriate estimate in the adjoining box
 
 
 
 
In your opinion, which of the following numerical estimates best indicates the overall cost that has been expended (in present-value terms) on your building for the Initial retrofitting, Maintenance and Utilities (i.e Electricity and Gas) over the last 20-year period of its life?
 
$2,060,044
 
$2,176,843
 
$2,209,803
 
$2,214,672
 
$3,150,290
 
If none, please provide a more appropriate estimate in the adjoining box
 
 
 
 
In your opinion, which of the following numerical estimates best indicates the overall cost that has been expended (in present-value terms) on your building for the Initial retrofitting, Maintenance and Utilities (i.e Electricity and Gas) over the last 25-year period of its life?
 
$2,044,935
 
$2,232,286
 
$2,467,707
 
$2,541,465
 
$3,421,391
 
If none, please provide a more appropriate estimate in the adjoining box
 
 
 
 
Given the option selected does the sum of $1,621,235 provide a fair estimate of the capital cost of the retrofitting carried out in your building?
 
Yes
 
If No, please provide a more representative estimate in the adjoining box
 
 
 
 
Given the option selected. does the sum of $10,360 provide a fair estimate of the Annual Maintenance cost of your building?
 
Yes
 
If No, please provide a more representative estimate in the adjoining box
 
 
 
 
Given the option selected, does the sum of $65,861 provide a fair estimate of the annual cost for Electrical and Gas Energy Usage for your building?
 
Yes
 
If No, please provide a more representative estimate in the adjoining box
 
 
 
 
Could you please indicate the number of years since your building has been retrofitted to comply with the selected building configuration permutation to the nearest 5-year period?
Please select the earlier year if in-between ranges
 
5
 
10
 
15
 
20
 
25
 
Other
 
 
 
 
In your opinion, which of the following numerical estimates best indicates the overall cost that has been expended (in present-value terms) on your building for the Initial retrofitting, Maintenance and Utilities (i.e Electricity and Gas) over the last 5-year period of its life?
 
$1,939,070
 
$1,939,913
 
$1,955,890
 
$1,992,864
 
$2,064,722
 
If none, please provide a more appropriate estimate in the adjoining box
 
 
 
 
In your opinion, which of the following numerical estimates best indicates the overall cost that has been expended (in present-value terms) on your building for the Initial retrofitting Maintenance and Utilities (i.e Electricity and Gas) over the last 10-year period of its life?
 
$2,065,502
 
$2,082,057
 
$2,102,346
 
$2,119,462
 
$2,435,297
 
If none, please provide a more appropriate estimate in the adjoining box
 
 
 
 
In your opinion, which of the following numerical estimates best indicates the overall cost that has been expended (in present-value terms) on your building for the Initial retrofitting, Maintenance and Utilities (i.e Electricity and Gas) over the last 15-year period of its life?
 
$2,090,580
 
$2,240,014
 
$2,282,238
 
$2,295,963
 
$2,911,900
 
If none, please provide a more appropriate estimate in the adjoining box
 
 
 
 
In your opinion, which of the following numerical estimates best indicates the overall cost that has been expended (in present-value terms) on your building for the Initial retrofitting, Maintenance and Utilities (i.e Electricity and Gas) over the last 20-year period of its life?
 
$2,068,684
 
$2,210,281
 
$2,250,238
 
$2,256,141
 
$3,390,401
 
If none, please provide a more appropriate estimate in the adjoining box
 
 
 
 
In your opinion, which of the following numerical estimates best indicates the overall cost that has been expended (in present-value terms) on your building for the Initial retrofitting, Maintenance and Utilities (i.e Electricity and Gas) over the last 25-year period of its life?
 
$2,050,456
 
$2,277,631
 
$2,494,712
 
$2,566,701
 
$3,719,496
 
If none, please provide a more appropriate estimate in the adjoining box
 
 
 
 
Given the option selected does the sum of $1,804,531 provide a fair estimate of the capital cost of the retrofitting carried out in your building?
 
Yes
 
If No, please provide a more representative estimate in the adjoining box
 
 
 
 
Given the option selected. does the sum of $5,806 provide a fair estimate of the Annual Maintenance cost of your building?
 
Yes
 
If No, please provide a more representative estimate in the adjoining box
 
 
 
 
Given the option selected, does the sum of $55,494 provide a fair estimate of the annual cost for Electrical and Gas Energy Usage for your building?
 
Yes
 
If No, please provide a more representative estimate in the adjoining box
 
 
 
 
Could you please indicate the number of years since your building has been retrofitted to comply with the selected building configuration permutation to the nearest 5-year period?
Please select the earlier year if in-between ranges
 
5
 
10
 
15
 
20
 
25
 
Other
 
 
 
 
In your opinion, which of the following numerical estimates best indicates the overall cost that has been expended (in present-value terms) on your building for the Initial retrofitting, Maintenance and Utilities (i.e Electricity and Gas) over the last 5-year period of its life?
 
$2,060,148
 
$2,060,827
 
$2,073,676
 
$2,103,412
 
$2,161,203
 
If none, please provide a more appropriate estimate in the adjoining box
 
 
 
 
In your opinion, which of the following numerical estimates best indicates the overall cost that has been expended (in present-value terms) on your building for the Initial retrofitting, Maintenance and Utilities (i.e Electricity and Gas) over the last 10-year period of its life?
 
$2,157,969
 
$2,171,140
 
$2,187,281
 
$2,200,897
 
$2,452,161
 
If none, please provide a more appropriate estimate in the adjoining box
 
 
 
 
In your opinion, which of the following numerical estimates best indicates the overall cost that has been expended (in present-value terms) on your building for the Initial retrofitting, Maintenance and Utilities (i.e Electricity and Gas) over the last 15-year period of its life?
 
$2,177,604
 
$2,296,387
 
$2,329,950
 
$2,340,859
 
$2,830,455
 
If none, please provide a more appropriate estimate in the adjoining box
 
 
 
 
In your opinion, which of the following numerical estimates best indicates the overall cost that has been expended (in present-value terms) on your building for the Initial retrofitting, Maintenance and Utilities (i.e Electricity and Gas) over the last 20-year period of its life?
 
$2,160,199
 
$2,272,752
 
$2,304,513
 
$2,309,205
 
$3,210,806
 
If none, please provide a more appropriate estimate in the adjoining box
 
 
 
 
In your opinion, which of the following numerical estimates best indicates the overall cost that has been expended (in present-value terms) on your building for the Initial retrofitting, Maintenance and Utilities (i.e Electricity and Gas) over the last 25-year period of its life?
 
$2,145,115
 
$2,325,377
 
$2,516,623
 
$2,575,310
 
$3,469,488
 
If none, please provide a more appropriate estimate in the adjoining box
 
 
 
 
Given the option selected does the sum of $2,024,721 provide a fair estimate of the capital cost of the retrofitting carried out in your building?
 
Yes
 
If No, please provide a more representative estimate in the adjoining box
 
 
 
 
Given the option selected. does the sum of $8,760 provide a fair estimate of the Annual Maintenance cost of your building?
 
Yes
 
If No, please provide a more representative estimate in the adjoining box
 
 
 
 
Given the option selected, does the sum of $55,015 provide a fair estimate of the annual cost for Electrical and Gas Energy Usage for your building
 
Yes
 
If No, please provide a more representative estimate in the adjoining box
 
 
 
 
Could you please indicate the number of years since your building has been retrofitted to comply with the selected building configuration permutation to the nearest 5-year period?
Please select the earlier year if in-between ranges
 
5
 
10
 
15
 
20
 
25
 
Other
 
 
 
 
In your opinion, which of the following numerical estimates best indicates the overall cost that has been expended (in present-value terms) on your building for the Initial retrofitting, Maintenance and Utilities (i.e Electricity and Gas) over the last 5-year period of its life?
 
$2,290,659
 
$2,291,365
 
$2,304,733
 
$2,335,670
 
$2,395,794
 
If none, please provide a more appropriate estimate in the adjoining box
 
 
 
 
In your opinion, which of the following numerical estimates best indicates the overall cost that has been expended (in present-value terms) on your building for the Initial retrofitting, Maintenance and Utilities (i.e Electricity and Gas) over the last 10-year period of its life?
 
$2,397,132
 
$2,411,010
 
$2,428,017
 
$2,442,365
 
$2,707,116
 
If none, please provide a more appropriate estimate in the adjoining box
 
 
 
 
In your opinion, which of the following numerical estimates best indicates the overall cost that has been expended (in present-value terms) on your building for the Initial retrofitting, Maintenance and Utilities (i.e Electricity and Gas) over the last 15-year period of its life?
 
$2,418,509
 
$2,543,887
 
$2,579,314
 
$2,590,829
 
$3,107,611
 
If none, please provide a more appropriate estimate in the adjoining box
 
 
 
 
In your opinion, which of the following numerical estimates best indicates the overall cost that has been expended (in present-value terms) on your building for the Initial retrofitting, Maintenance and Utilities (i.e Electricity and Gas) over the last 20-year period of its life?
 
$2,400,138
 
$2,518,940
 
$2,552,466
 
$2,557,418
 
$3,509,081
 
If none, please provide a more appropriate estimate in the adjoining box
 
 
 
 
In your opinion, which of the following numerical estimates best indicates the overall cost that has been expended (in present-value terms) on your building for the Initial retrofitting, Maintenance and Utilities (i.e Electricity and Gas) over the last 25-year period of its life?
 
$2,384,749
 
$2,575,302
 
$2,753,285
 
$2,813,330
 
$3,784,730
 
If none, please provide a more appropriate estimate in the adjoining box
 
 
 
 
Given the option selected does the sum of $2,221,501 provide a fair estimate of the capital cost of the retrofitting carried out in your building?
 
Yes
 
If No, please provide a more representative estimate in the adjoining box
 
 
 
 
Given the option selected. does the sum of $8,760 provide a fair estimate of the Annual Maintenance cost of your building?
 
Yes
 
If No, please provide a more representative estimate in the adjoining box
 
 
 
 
Given the option selected, does the sum of $63,298 provide a fair estimate of the annual cost for Electrical and Gas Energy Usage for your building?
 
Yes
 
If No, please provide a more representative estimate in the adjoining box
 
 
 
 
Could you please indicate the number of years since your building has been retrofitted to comply with the selected building configuration permutation to the nearest 5-year period?
Please select the earlier year if in-between ranges
 
5
 
10
 
15
 
20
 
25
 
Other
 
 
 
 
In your opinion, which of the following numerical estimates best indicates the overall cost that has been expended (in present-value terms) on your building for the Initial retrofitting, Maintenance and Utilities (i.e Electricity and Gas) over the last 5-year period of its life?
 
$2,521,975
 
$2,522,772
 
$2,537,876
 
$2,572,831
 
$2,640,763
 
If none, please provide a more appropriate estimate in the adjoining box
 
 
 
 
In your opinion, which of the following numerical estimates best indicates the overall cost that has been expended (in present-value terms) on your building for the Initial retrofitting, Maintenance and Utilities (i.e Electricity and Gas) over the last 10-year period of its life?
 
$2,637,751
 
$2,653,262
 
$2,672,271
 
$2,688,308
 
$2,984,224
 
If none, please provide a more appropriate estimate in the adjoining box
 
 
 
 
In your opinion, which of the following numerical estimates best indicates the overall cost that has been expended (in present-value terms) on your building for the Initial retrofitting, Maintenance and Utilities (i.e Electricity and Gas) over the last 15-year period of its life?
 
$2,659,748
 
$2,799,281
 
$2,838,707
 
$2,851,522
 
$3,426,648
 
If none, please provide a more appropriate estimate in the adjoining box
 
 
 
 
In your opinion, which of the following numerical estimates best indicates the overall cost that has been expended (in present-value terms) on your building for the Initial retrofitting, Maintenance and Utilities (i.e Electricity and Gas) over the last 20-year period of its life?
 
$2,639,302
 
$2,771,517
 
$2,808,827
 
$2,814,339
 
$3,873,444
 
If none, please provide a more appropriate estimate in the adjoining box
 
 
 
 
In your opinion, which of the following numerical estimates best indicates the overall cost that has been expended (in present-value terms) on your building for the Initial retrofitting, Maintenance and Utilities (i.e Electricity and Gas) over the last 25-year period of its life?
 
$2,622,506
 
$2,834,747
 
$3,058,928
 
$3,127,945
 
$4,181,827
 
If none, please provide a more appropriate estimate in the adjoining box
 
 
 
 
Given the option selected does the sum of $2,404,797 provide a fair estimate of the capital cost of the retrofitting carried out in your building?
 
Yes
 
If No, please provide a more representative estimate in the adjoining box
 
 
 
 
Given the option selected. does the sum of $4,206 provide a fair estimate of the Annual Maintenance cost of your building?
 
Yes
 
If No, please provide a more representative estimate in the adjoining box
 
 
 
 
Given the option selected, does the sum of $55,422 provide a fair estimate of the annual cost for Electrical and Gas Energy Usage for your building?
 
Yes
 
If No, please provide a more representative estimate in the adjoining box
 
 
 
 
Could you please indicate the number of years since your building has been retrofitted to comply with the selected building configuration permutation to the nearest 5-year period?
Please select the earlier year if in-between ranges
 
5
 
10
 
15
 
20
 
25
 
Other
 
 
 
 
In your opinion, which of the following numerical estimates best indicates the overall cost that has been expended (in present-value terms) on your building for the Initial retrofitting, Maintenance and Utilities (i.e Electricity and Gas) over the last 5-year period of its life?
 
$2,653,439
 
$2,654,099
 
$2,666,597
 
$2,695,522
 
$2,751,737
 
If none, please provide a more appropriate estimate in the adjoining box
 
 
 
 
In your opinion, which of the following numerical estimates best indicates the overall cost that has been expended (in present-value terms) on your building for the Initial retrofitting, Maintenance and Utilities (i.e Electricity and Gas) over the last 10-year period of its life?
 
$2,744,645
 
$2,757,309
 
$2,772,829
 
$2,785,923
 
$3,027,524
 
If none, please provide a more appropriate estimate in the adjoining box
 
 
 
 
In your opinion, which of the following numerical estimates best indicates the overall cost that has been expended (in present-value terms) on your building for the Initial retrofitting Maintenance and Utilities (i.e Electricity and Gas) over the last 15-year period of its life?
 
$2,762,241
 
$2,876,047
 
$2,908,204
 
$2,918,657
 
$3,387,742
 
If none, please provide a more appropriate estimate in the adjoining box
 
 
 
 
In your opinion, which of the following numerical estimates best indicates the overall cost that has been expended (in present-value terms) on your building for the Initial retrofitting, Maintenance and Utilities (i.e Electricity and Gas) over the last 20-year period of its life?
 
$2,745,565
 
$2,853,403
 
$2,883,834
 
$2,888,329
 
$3,752,159
 
If none, please provide a more appropriate estimate in the adjoining box
 
 
 
 
In your opinion, which of the following numerical estimates best indicates the overall cost that has been expended (in present-value terms) on your building for the Initial retrofitting, Maintenance and Utilities (i.e Electricity and Gas) over the last 25-year period of its life?
 
$2,731,140
 
$2,903,864
 
$3,109,146
 
$3,167,195
 
$4,000,135
 
If none, please provide a more appropriate estimate in the adjoining box
 
 
 
 
Given the option selected does the sum of $2,325,494 provide a fair estimate of the capital cost of the retrofitting carried out on your building?
 
Yes
 
If No, please provide a more representative estimate in the adjoining box
 
 
 
 
Given the option selected. does the sum of $10,360 provide a fair estimate of the Annual Maintenance cost of your building?
 
Yes
 
If No, please provide a more representative estimate in the adjoining box
 
 
 
 
Given the option selected, does the sum of $52,666 provide a fair estimate of the annual cost for Electrical and Gas Energy Usage for your building?
 
Yes
 
If No, please provide a more representative estimate in the adjoining box
 
 
 
 
Could you please indicate the number of years since your building has been retrofitted to comply with the selected building configuration permutation to the nearest 5-year period?
Please select the earlier year if in-between ranges
 
5
 
10
 
15
 
20
 
25
 
Other
 
 
 
 
In your opinion, which of the following numerical estimates best indicates the overall cost that has been expended (in present-value terms) on your building for the Initial retrofitting, Maintenance and Utilities (i.e Electricity and Gas) over the last 5-year period of its life?
 
$2,588,308
 
$2,589,005
 
$2,602,216
 
$2,632,790
 
$2,692,208
 
If none, please provide a more appropriate estimate in the adjoining box
 
 
 
 
In your opinion, which of the following numerical estimates best indicates the overall cost that has been expended (in present-value terms) on your building for the Initial retrofitting, Maintenance and Utilities (i.e Electricity and Gas) over the last 10-year period of its life?
 
$2,694,123
 
$2,707,859
 
$2,724,694
 
$2,738,896
 
$3,000,958
 
If none, please provide a more appropriate estimate in the adjoining box
 
 
 
 
In your opinion, which of the following numerical estimates best indicates the overall cost that has been expended (in present-value terms) on your building for the Initial retrofitting, Maintenance and Utilities (i.e Electricity and Gas) over the last 15-year period of its life?
 
$2,714,225
 
$2,837,993
 
$2,872,965
 
$2,884,332
 
$3,394,477
 
If none, please provide a more appropriate estimate in the adjoining box
 
 
 
 
In your opinion, which of the following numerical estimates best indicates the overall cost that has been expended (in present-value terms) on your building for the Initial retrofitting, Maintenance and Utilities (i.e Electricity and Gas) over the last 20-year period of its life?
 
$2,696,090
 
$2,813,366
 
$2,846,461
 
$2,851,350
 
$3,790,792
 
If none, please provide a more appropriate estimate in the adjoining box
 
 
 
 
In your opinion, which of the following numerical estimates best indicates the overall cost that has been expended (in present-value terms) on your building for the Initial retrofitting, Maintenance and Utilities (i.e Electricity and Gas) over the last 25-year period of its life?
 
$2,681,733
 
$2,870,280
 
$3,046,192
 
$3,105,589
 
$4,066,979
 
If none, please provide a more appropriate estimate in the adjoining box
 
 
 
 
Given the option selected does the sum of $2,508,790 provide a fair estimate of the capital cost of the retrofitting carried out in your building?
 
Yes
 
If No, please provide a more representative estimate in the adjoining box
 
 
 
 
Given the option selected. does the sum of $5,806 provide a fair estimate of the Annual Maintenance cost of your building?
 
Yes
 
If No, please provide a more representative estimate in the adjoining box
 
 
 
 
Given the option selected, does the sum of $48,413 provide a fair estimate of the annual cost for Electrical and Gas Energy Usage for your building?
 
Yes
 
If No, please provide a more representative estimate in the adjoining box
 
 
 
 
Could you please indicate the number of years since your building has been retrofitted to comply with the selected building configuration permutation to the nearest 5-year period?
Please select the earlier year if in-between ranges
 
5
 
10
 
15
 
20
 
25
 
Other
 
 
 
 
In your opinion, which of the following numerical estimates best indicates the overall cost that has been expended (in present-value terms) on your building for the Initial retrofitting, Maintenance and Utilities (i.e Electricity and Gas) over the last 5-year period of its life?
 
$2,734,880
 
$2,735,479
 
$2,746,844
 
$2,773,146
 
$2,824,261
 
If none, please provide a more appropriate estimate in the adjoining box
 
 
 
 
In your opinion, which of the following numerical estimates best indicates the overall cost that has been expended (in present-value terms) on your building for the Initial retrofitting, Maintenance and Utilities (i.e Electricity and Gas) over the last 10-year period of its life?
 
$2,822,002
 
$2,833,674
 
$2,847,978
 
$2,860,045
 
$3,082,711
 
If none, please provide a more appropriate estimate in the adjoining box
 
 
 
 
In your opinion, which of the following numerical estimates best indicates the overall cost that has been expended (in present-value terms) on your building for the Initial retrofitting, Maintenance and Utilities (i.e Electricity and Gas) over the last 15-year period of its life?
 
$2,839,219
 
$2,944,424
 
$2,974,151
 
$2,983,813
 
$3,417,446
 
If none, please provide a more appropriate estimate in the adjoining box
 
 
 
 
In your opinion, which of the following numerical estimates best indicates the overall cost that has been expended (in present-value terms) on your building for the Initial retrofitting, Maintenance and Utilities (i.e Electricity and Gas) over the last 20-year period of its life?
 
$2,823,804
 
$2,923,491
 
$2,951,622
 
$2,955,778
 
$3,754,321
 
If none, please provide a more appropriate estimate in the adjoining box
 
 
 
 
In your opinion, which of the following numerical estimates best indicates the overall cost that has been expended (in present-value terms) on your building for the Initial retrofitting, Maintenance and Utilities (i.e Electricity and Gas) over the last 25-year period of its life?
 
$2,810,694
 
$2,970,483
 
$3,137,585
 
$3,189,407
 
$3,984,657
 
If none, please provide a more appropriate estimate in the adjoining box
 
 
 
 
Given the option selected does the sum of $1,383,207 provide a fair estimate of the capital cost of the retrofitting carried out in your building?
 
Yes
 
If No, please provide a more representative estimate in the adjoining box
 
 
 
 
Given the option selected. does the sum of $8,760 provide a fair estimate of the Annual Maintenance cost of your building?
 
Yes
 
If No, please provide a more representative estimate in the adjoining box
 
 
 
 
Given the option selected, does the sum of $76,609 provide a fair estimate of the annual cost for Electrical and Gas Energy Usage for your building?
 
Yes
 
If No, please provide a more representative estimate in the adjoining box
 
 
 
 
Could you please indicate the number of years since your building has been retrofitted to comply with the selected building configuration permutation to the nearest 5-year period?
Please select the earlier year if in-between ranges
 
5
 
10
 
15
 
20
 
25
 
Other
 
 
 
 
In your opinion, which of the following numerical estimates best indicates the overall cost that has been expended (in present-value terms) on your building for the Initial retrofitting, Maintenance and Utilities (i.e Electricity and Gas) over the last 5-year period of its life?
 
$1,739,187
 
$1,740,131
 
$1,758,025
 
$1,799,437
 
$1,879,918
 
If none, please provide a more appropriate estimate in the adjoining box
 
 
 
 
In your opinion, which of the following numerical estimates best indicates the overall cost that has been expended (in present-value terms) on your building for the Initial retrofitting, Maintenance and Utilities (i.e Electricity and Gas) over the last 10-year period of its life?
 
$1,880,702
 
$1,899,241
 
$1,921,960
 
$1,941,127
 
$2,294,802
 
If none, please provide a more appropriate estimate in the adjoining box
 
 
 
 
In your opinion, which of the following numerical estimates best indicates the overall cost that has been expended (in present-value terms) on your building for the Initial retrofitting, Maintenance and Utilities (i.e Electricity and Gas) over the last 15-year period of its life?
 
$1,911,117
 
$2,079,197
 
$2,126,690
 
$2,142,127
 
$2,834,919
 
If none, please provide a more appropriate estimate in the adjoining box
 
 
 
 
In your opinion, which of the following numerical estimates best indicates the overall cost that has been expended (in present-value terms) on your building for the Initial retrofitting, Maintenance and Utilities (i.e Electricity and Gas) over the last 20-year period of its life?
 
$1,886,489
 
$2,045,753
 
$2,090,697
 
$2,097,336
 
$3,373,127
 
If none, please provide a more appropriate estimate in the adjoining box
 
 
 
 
In your opinion, which of the following numerical estimates best indicates the overall cost that has been expended (in present-value terms) on your building for the Initial retrofitting, Maintenance and Utilities over the last 25-year period of its life.
 
$1,864,399
 
$2,119,081
 
$2,357,153
 
$2,437,421
 
$3,735,529
 
If none, please provide a more appropriate estimate in the adjoining box
 
 
 
 
Given the option selected does the sum of $1,515,868 provide a fair estimate of the capital cost of the retrofitting carried out in your building?
 
Yes
 
If No, please provide a more representative estimate in the adjoining box
 
 
 
 
Given the option selected. does the sum of $8,760 provide a fair estimate of the Annual Maintenance cost of your building?
 
Yes
 
If No, please provide a more representative estimate in the adjoining box
 
 
 
 
Given the option selected, does the sum of $85,297 provide a fair estimate of the annual cost for Electrical and Gas Energy Usage for your building?
 
Yes
 
If No, please provide a more representative estimate in the adjoining box
 
 
 
 
Could you please indicate the number of years since your building has been retrofitted to comply with the selected building configuration permutation to the nearest 5-year period?
Please select the earlier year if in-between ranges
 
5
 
10
 
15
 
20
 
25
 
Other
 
 
 
 
In your opinion, which of the following numerical estimates best indicates the overall cost that has been expended (in present-value terms) on your building for the Initial retrofitting, Maintenance and Utilities (i.e Electricity and Gas) over the last 5-year period of its life?
 
$1,908,076
 
$1,909,117
 
$1,928,832
 
$1,974,458
 
$2,063,130
 
If none, please provide a more appropriate estimate in the adjoining box
 
 
 
 
In your opinion, which of the following numerical estimates best indicates the overall cost that has been expended (in present-value terms) on your building for the Initial retrofitting , Maintenance and Utilities (i.e Electricity and Gas) over the last 10-year period of its life?
 
$2,064,016
 
$2,084,442
 
$2,109,475
 
$2,130,593
 
$2,520,278
 
If none, please provide a more appropriate estimate in the adjoining box
 
 
 
 
In your opinion, which of the following numerical estimates best indicates the overall cost that has been expended (in present-value terms) on your building for the Initial retrofitting, Maintenance and Utilities (i.e Electricity and Gas) over the last 15-year period of its life?
 
$2,098,290
 
$2,283,727
 
$2,336,124
 
$2,353,155
 
$3,117,486
 
If none, please provide a more appropriate estimate in the adjoining box
 
 
 
 
In your opinion, which of the following numerical estimates best indicates the overall cost that has been expended (in present-value terms) on your building for the Initial retrofitting, Maintenance and Utilities (i.e Electricity and Gas) over the last 20-year period of its life?
 
$2,071,119
 
$2,246,830
 
$2,296,414
 
$2,303,739
 
$3,711,270
 
If none, please provide a more appropriate estimate in the adjoining box
 
 
 
 
In your opinion, which of the following numerical estimates best indicates the overall cost that has been expended (in present-value terms) on your building for the Initial retrofitting, Maintenance and Utilities (i.e Electricity and Gas) over the last 25-year period of its life?
 
$2,046,243
 
$2,326,955
 
$2,587,388
 
$2,675,697
 
$4,108,621
 
If none, please provide a more appropriate estimate in the adjoining box
 
 
 
 
Given the option selected does the sum of $1,699,164 provide a fair estimate of the capital cost of the retrofitting carried out in your building?
 
Yes
 
If No, please provide a more representative estimate in the adjoining box
 
 
 
 
Given the option selected. does the sum of $4,206 provide a fair estimate of the Annual Maintenance cost of your building?
 
Yes
 
If No, please provide a more representative estimate in the adjoining box
 
 
 
 
Given the option selected, does the sum of $74,930 provide a fair estimate of the annual cost for Electrical and Gas Energy Usage for your building?
 
Yes
 
If No, please provide a more representative estimate in the adjoining box
 
 
 
 
Could you please indicate the number of years since your building has been retrofitted to comply with the selected building configuration permutation to the nearest 5-year period?
Please select the earlier year if in-between ranges
 
5
 
10
 
15
 
20
 
25
 
Other
 
 
 
 
In your opinion, which of the following numerical estimates best indicates the overall cost that has been expended (in present-value terms) on your building for the Initial retrofitting, Maintenance and Utilities (i.e Electricity and Gas) over the last 5-year period of its life?
 
$2,029,155
 
$2,030,030
 
$2,046,618
 
$2,085,066
 
$2,159,612
 
If none, please provide a more appropriate estimate in the adjoining box
 
 
 
 
In your opinion, which of the following numerical estimates best indicates the overall cost that has been expended (in present-value terms) on your building for the Initial retrofitting, Maintenance and Utilities (i.e Electricity and Gas) over the last 10-year period of its life?
 
$2,156,483
 
$2,173,525
 
$2,194,410
 
$2,212,029
 
$2,537,142
 
If none, please provide a more appropriate estimate in the adjoining box
 
 
 
 
In your opinion, which of the following numerical estimates best indicates the overall cost that has been expended (in present-value terms) on your building for the Initial retrofitting, Maintenance and Utilities (i.e Electricity and Gas) over the last 15-year period of its life?
 
$2,185,314
 
$2,340,099
 
$2,383,835
 
$2,398,051
 
$3,036,042
 
If none, please provide a more appropriate estimate in the adjoining box
 
 
 
 
In your opinion, which of the following numerical estimates best indicates the overall cost that has been expended (in present-value terms) on your building for the Initial retrofitting, Maintenance and Utilities (i.e Electricity and Gas) over the last 20-year period of its life?
 
$2,162,634
 
$2,309,301
 
$2,350,689
 
$2,356,804
 
$3,531,675
 
If none, please provide a more appropriate estimate in the adjoining box
 
 
 
 
In your opinion, which of the following numerical estimates best indicates the overall cost that has been expended (in present-value terms) on your building for the Initial retrofitting, Maintenance and Utilities (i.e Electricity and Gas) over the last 25-year period of its life?
 
$2,140,902
 
$2,374,701
 
$2,609,298
 
$2,684,307
 
$3,858,613
 
If none, please provide a more appropriate estimate in the adjoining box
 
 
 
 
Given the option selected does the sum of $2,370,163 provide a fair estimate of the capital cost of the retrofitting of your building?
 
Yes
 
If No, please provide a more representative estimate in the adjoining box
 
 
 
 
Given the option selected. does the sum of $4,206 provide a fair estimate of the Annual Maintenance cost of your building?
 
Yes
 
If No, please provide a more representative estimate in the adjoining box
 
 
 
 
Given the option selected, does the sum of $64,914 provide a fair estimate of the annual cost for Electrical and Gas Energy Usage for your building?
 
Yes
 
If No, please provide a more representative estimate in the adjoining box
 
 
 
 
Could you please indicate the number of years since your building has been retrofitted to comply with the selected building configuration permutation to the nearest 5-year period?
Please select the earlier year if in-between ranges
 
5
 
10
 
15
 
20
 
25
 
Other
 
 
 
 
In your opinion, which of the following numerical estimates best indicates the overall cost that has been expended (in present-value terms) on your building for the Initial retrofitting, Maintenance and Utilities (i.e Electricity and Gas) over the last 5-year period of its life?
 
$2,658,387
 
$2,659,152
 
$2,673,640
 
$2,707,170
 
$2,772,333
 
If none, please provide a more appropriate estimate in the adjoining box
 
 
 
 
In your opinion, which of the following numerical estimates best indicates the overall cost that has been expended (in present-value terms) on your building for the Initial retrofitting, Maintenance and Utilities (i.e Electricity and Gas) over the last 10-year period of its life?
 
$2,770,765
 
$2,785,693
 
$2,803,988
 
$2,819,421
 
$3,104,214
 
If none, please provide a more appropriate estimate in the adjoining box
 
 
 
 
In your opinion, which of the following numerical estimates best indicates the overall cost that has been expended (in present-value terms) on your building for the Initial retrofitting, Maintenance and Utilities (i.e Electricity and Gas) over the last 15-year period of its life?
 
$2,796,301
 
$2,931,978
 
$2,970,316
 
$2,982,777
 
$3,542,012
 
If none, please provide a more appropriate estimate in the adjoining box
 
 
 
 
In your opinion, which of the following numerical estimates best indicates the overall cost that has been expended (in present-value terms) on your building for the Initial retrofitting, Maintenance and Utilities (i.e Electricity and Gas) over the last 20-year period of its life?
 
$2,776,421
 
$2,904,982
 
$2,941,261
 
$2,946,621
 
$3,976,462
 
If none, please provide a more appropriate estimate in the adjoining box
 
 
 
 
In your opinion, which of the following numerical estimates best indicates the overall cost that has been expended (in present-value terms) on your building for the Initial retrofitting, Maintenance and Utilities (i.e Electricity and Gas) over the last 25-year period of its life?
 
$2,757,430
 
$2,962,399
 
$3,161,829
 
$3,227,075
 
$4,263,329
 
If none, please provide a more appropriate estimate in the adjoining box
 
 
 
 
Given the option selected does the sum of $2,539,190 provide a fair estimate of the capital cost of the retrofitting carried out in your building?
 
Yes
 
If No, please provide a more representative estimate in the adjoining box
 
 
 
 
Given the option selected. does the sum of $4,206 provide a fair estimate of the Annual Maintenance cost of your building?
 
Yes
 
If No, please provide a more representative estimate in the adjoining box
 
 
 
 
Given the option selected, does the sum of $93,764 provide a fair estimate of the annual cost for Electrical and Gas Energy Usage for your building?
 
Yes
 
If No, please provide a more representative estimate in the adjoining box
 
 
 
 
Could you please indicate the number of years since your building has been retrofitted to comply with the selected building configuration permutation to the nearest 5-year period?
Please select the earlier year if in-between ranges
 
5
 
10
 
15
 
20
 
25
 
Other
 
 
 
 
In your opinion, which of the following numerical estimates best indicates the overall cost that has been expended (in present-value terms) on your building for the Initial retrofitting, Maintenance and Utilities (i.e Electricity and Gas) over the last 5-year period of its life?
 
$2,947,713
 
$2,948,796
 
$2,969,331
 
$3,016,855
 
$3,109,216
 
If none, please provide a more appropriate estimate in the adjoining box
 
 
 
 
In your opinion, which of the following numerical estimates best indicates the overall cost that has been expended (in present-value terms) on your building for the Initial retrofitting, Maintenance and Utilities (i.e Electricity and Gas) over the last 10-year period of its life?
 
$3,090,582
 
$3,111,130
 
$3,136,310
 
$3,157,554
 
$3,549,545
 
If none, please provide a more appropriate estimate in the adjoining box
 
 
 
 
In your opinion, which of the following numerical estimates best indicates the overall cost that has been expended (in present-value terms) on your building for the Initial retrofitting, Maintenance and Utilities (i.e Electricity and Gas) over the last 15-year period of its life?
 
$3,116,962
 
$3,300,918
 
$3,352,897
 
$3,369,792
 
$4,128,020
 
If none, please provide a more appropriate estimate in the adjoining box
 
 
 
 
In your opinion, which of the following numerical estimates best indicates the overall cost that has been expended (in present-value terms) on your building for the Initial retrofitting, Maintenance and Utilities (i.e Electricity and Gas) over the last 20-year period of its life?
 
$3,090,007
 
$3,264,315
 
$3,313,504
 
$3,320,770
 
$4,717,063
 
If none, please provide a more appropriate estimate in the adjoining box
 
 
 
 
In your opinion, which of the following numerical estimates best indicates the overall cost that has been expended (in present-value terms) on your building for the Initial retrofitting, Maintenance and Utilities (i.e Electricity and Gas) over the last 25-year period of its life?
 
$3,066,652
 
$3,345,823
 
$3,716,876
 
$3,813,935
 
$5,117,705
 
If none, please provide a more appropriate estimate in the adjoining box
 
 
 
 
Given the option selected does the sum of $1,621,235 provide a fair estimate of the capital cost of the retrofitting carried out in your building?
 
Yes
 
If No, please provide a more representative estimate in the adjoining box
 
 
 
 
Given the option selected. does the sum of $10,360 provide a fair estimate of the Annual Maintenance cost of your building?
 
Yes
 
If No, please provide a more representative estimate in the adjoining box
 
 
 
 
Given the option selected, does the sum of $65,861 provide a fair estimate of the annual cost for Electrical and Gas Energy Usage for your building?
 
Yes
 
If No, please provide a more representative estimate in the adjoining box
 
 
 
 
Could you please indicate the number of years since your building has been retrofitted to comply with the selected building configuration permutation to the nearest 5-year period?
Please select the earlier year if in-between ranges
 
5
 
10
 
15
 
20
 
25
 
Other
 
 
 
 
In your opinion, which of the following numerical estimates best indicates the overall cost that has been expended (in present-value terms) on your building for the Initial retrofitting, Maintenance and Utilities (i.e Electricity and Gas) over the last 5-year period of its life?
 
$1,939,070
 
$1,939,913
 
$1,955,890
 
$1,992,864
 
$2,064,722
 
If none, please provide a more appropriate estimate in the adjoining box
 
 
 
 
In your opinion, which of the following numerical estimates best indicates the overall cost that has been expended (in present-value terms) on your building for the Initial retrofitting, Maintenance and Utilities (i.e Electricity and Gas) over the last 10-year period of its life?
 
$2,065,502
 
$2,082,057
 
$2,102,346
 
$2,119,462
 
$2,435,297
 
If none, please provide a more appropriate estimate in the adjoining box
 
 
 
 
In your opinion, which of the following numerical estimates best indicates the overall cost that has been expended (in present-value terms) on your building for the Initial retrofitting, Maintenance and Utilities (i.e Electricity and Gas) over the last 15-year period of its life?
 
$2,090,580
 
$2,240,014
 
$2,282,238
 
$2,295,963
 
$2,911,900
 
If none, please provide a more appropriate estimate in the adjoining box
 
 
 
 
In your opinion, which of the following numerical estimates best indicates the overall cost that has been expended (in present-value terms) on your building for the Initial retrofitting, Maintenance and Utilities (i.e Electricity and Gas) over the last 20-year period of its life?
 
$2,068,684
 
$2,210,281
 
$2,250,238
 
$2,256,141
 
$3,390,401
 
If none, please provide a more appropriate estimate in the adjoining box
 
 
 
 
In your opinion, which of the following numerical estimates best indicates the overall cost that has been expended (in present-value terms) on your building for the Initial retrofitting, Maintenance and Utilities (i.e Electricity and Gas) over the last 25-year period of its life?
 
$2,050,456
 
$2,277,631
 
$2,494,712
 
$2,566,701
 
$3,719,496
 
If none, please provide a more appropriate estimate in the adjoining box
 
 
 
 
Given the option selected does the sum of $1,804,531 provide a fair estimate of the capital cost of the retrofitting carried out on your building?
 
Yes
 
If No, please provide a more representative estimate in the adjoining box
 
 
 
 
Given the option selected. does the sum of $5,806 provide a fair estimate of the Annual Maintenance cost of your building?
 
Yes
 
If No, please provide a more representative estimate in the adjoining box
 
 
 
 
Given the option selected, does the sum of $55,494 provide a fair estimate of the annual cost for Electrical and Gas Energy Usage for your building?
 
Yes
 
If No, please provide a more representative estimate in the adjoining box
 
 
 
 
Could you please indicate the number of years since your building has been retrofitted to comply with the selected building configuration permutation to the nearest 5-year period?
Please select the earlier year if in-between ranges
 
5
 
10
 
15
 
20
 
25
 
Other
 
 
 
 
In your opinion, which of the following numerical estimates best indicates the overall cost that has been expended (in present-value terms) on your building for the Initial retrofitting, Maintenance and Utilities (i.e Electricity and Gas) over the last 5-year period of its life?
 
$2,060,148
 
$2,060,827
 
$2,073,676
 
$2,103,412
 
$2,161,203
 
If none, please provide a more appropriate estimate in the adjoining box
 
 
 
 
In your opinion, which of the following numerical estimates best indicates the overall cost that has been expended (in present-value terms) on your building for the Initial retrofitting, Maintenance and Utilities (i.e Electricity and Gas) over the last 10-year period of its life?
 
$2,157,969
 
$2,171,140
 
$2,187,281
 
$2,200,897
 
$2,452,161
 
If none, please provide a more appropriate estimate in the adjoining box
 
 
 
 
In your opinion, which of the following numerical estimates best indicates the overall cost that has been expended (in present-value terms) on your building for the Initial retrofitting, Maintenance and Utilities (i.e Electricity and Gas) over the last 15-year period of its life?
 
$2,177,604
 
$2,296,387
 
$2,329,950
 
$2,340,859
 
$2,830,455
 
If none, please provide a more appropriate estimate in the adjoining box
 
 
 
 
In your opinion, which of the following numerical estimates best indicates the overall cost that has been expended (in present-value terms) on your building for the Initial retrofitting, Maintenance and Utilities (i.e Electricity and Gas) over the last 20-year period of its life?
 
$2,160,199
 
$2,272,752
 
$2,304,513
 
$2,309,205
 
$3,210,806
 
If none, please provide a more appropriate estimate in the adjoining box
 
 
 
 
In your opinion, which of the following numerical estimates best indicates the overall cost that has been expended (in present-value terms) on your building for the Initial retrofitting, Maintenance and Utilities (i.e Electricity and Gas) over the last 25-year period of its life?
 
$2,145,115
 
$2,325,377
 
$2,516,623
 
$2,575,310
 
$3,469,488
 
If none, please provide a more appropriate estimate in the adjoining box
 
 
 
 
Given the option selected does the sum of 2,689,837 provide a fair estimate of the capital cost of the retrofitting carried out on your building?
 
Yes
 
If No, please provide a more representative estimate in the adjoining box
 
 
 
 
Given the option selected. does the sum of $10,360 provide a fair estimate of the Annual Maintenance cost of your building?
 
Yes
 
If No, please provide a more representative estimate in the adjoining box
 
 
 
 
Given the option selected, does the sum of $58,999 provide a fair estimate of the annual cost for Electrical and Gas Energy Usage for your building?
 
Yes
 
If No, please provide a more representative estimate in the adjoining box
 
 
 
 
Could you please indicate the number of years since your building has been retrofitted to comply with the selected building configuration permutation to the nearest 5-year period?
Please select the earlier year if in-between ranges
 
5
 
10
 
15
 
20
 
25
 
Other
 
 
 
 
In your opinion, which of the following numerical estimates best indicates the overall cost that has been expended (in present-value terms) on your building for the Initial retrofitting, Maintenance and Utilities (i.e Electricity and Gas) over the last 5-year period of its life?
 
$2,979,058
 
$2,979,825
 
$2,994,364
 
$3,028,009
 
$3,093,398
 
If none, please provide a more appropriate estimate in the adjoining box
 
 
 
 
In your opinion, which of the following numerical estimates best indicates the overall cost that has been expended (in present-value terms) on your building for the Initial retrofitting, Maintenance and Utilities (i.e Electricity and Gas) over the last 10-year period of its life?
 
$3,095,082
 
$3,110,183
 
$3,128,689
 
$3,144,302
 
$3,432,395
 
If none, please provide a more appropriate estimate in the adjoining box
 
 
 
 
In your opinion, which of the following numerical estimates best indicates the overall cost that has been expended (in present-value terms) on your building for the Initial retrofitting, Maintenance and Utilities (i.e Electricity and Gas) over the last 15-year period of its life?
 
$3,117,788
 
$3,254,043
 
$3,292,543
 
$3,305,057
 
$3,866,671
 
If none, please provide a more appropriate estimate in the adjoining box
 
 
 
 
In your opinion, which of the following numerical estimates best indicates the overall cost that has been expended (in present-value terms) on your building for the Initial retrofitting, Maintenance and Utilities (i.e Electricity and Gas) over the last 20-year period of its life?
 
$3,097,823
 
$3,226,931
 
$3,263,365
 
$3,268,747
 
$4,302,969
 
If none, please provide a more appropriate estimate in the adjoining box
 
 
 
 
In your opinion, which of the following numerical estimates best indicates the overall cost that has been expended (in present-value terms) on your building for the Initial retrofitting, Maintenance and Utilities (i.e Electricity and Gas) over the last 25-year period of its life?
 
$3,081,520
 
$3,288,827
 
$3,482,741
 
$3,548,089
 
$4,604,590
 
If none, please provide a more appropriate estimate in the adjoining box
 
 
 
 
Given the option selected does the sum of $2,606,203 provide a fair estimate of the capital cost of the retrofitting carried out in your building?
 
Yes
 
If No, please provide a more representative estimate in the adjoining box
 
 
 
 
Given the option selected. does the sum of $8,760 provide a fair estimate of the Annual Maintenance cost of your building?
 
Yes
 
If No, please provide a more representative estimate in the adjoining box
 
 
 
 
Given the option selected, does the sum of $80,522 provide a fair estimate of the annual cost for Electrical and Gas Energy Usage for your building?
 
Yes
 
If No, please provide a more representative estimate in the adjoining box
 
 
 
 
Could you please indicate the number of years since your building has been retrofitted to comply with the selected building configuration permutation to the nearest 5-year period?
Please select the earlier year if in-between ranges
 
5
 
10
 
15
 
20
 
25
 
Other
 
 
 
 
In your opinion, which of the following numerical estimates best indicates the overall cost that has been expended (in present-value terms) on your building for the Initial retrofitting, Maintenance and Utilities (i.e Electricity and Gas) over the last 5-year period of its life?
 
$2,978,501
 
$2,979,488
 
$2,998,203
 
$3,041,513
 
$3,125,683
 
If none, please provide a more appropriate estimate in the adjoining box
 
 
 
 
In your opinion, which of the following numerical estimates best indicates the overall cost that has been expended (in present-value terms) on your building for the Initial retrofitting, Maintenance and Utilities (i.e Electricity and Gas) over the last 10-year period of its life?
 
$3,120,058
 
$3,139,207
 
$3,162,673
 
$3,182,470
 
$3,547,775
 
If none, please provide a more appropriate estimate in the adjoining box
 
 
 
 
In your opinion, which of the following numerical estimates best indicates the overall cost that has been expended (in present-value terms) on your building for the Initial retrofitting, Maintenance and Utilities (i.e Electricity and Gas) over the last 15-year period of its life?
 
$3,147,771
 
$3,320,200
 
$3,368,921
 
$3,384,758
 
$4,095,474
 
If none, please provide a more appropriate estimate in the adjoining box
 
 
 
 
In your opinion, which of the following numerical estimates best indicates the overall cost that has been expended (in present-value terms) on your building for the Initial retrofitting, Maintenance and Utilities (i.e Electricity and Gas) over the last 20-year period of its life?
 
$3,122,505
 
$3,285,891
 
$3,331,997
 
$3,338,808
 
$4,647,606
 
If none, please provide a more appropriate estimate in the adjoining box
 
 
 
 
In your opinion, which of the following numerical estimates best indicates the overall cost that has been expended (in present-value terms) on your building for the Initial retrofitting, Maintenance and Utilities (i.e Electricity and Gas) over the last 25-year period of its life?
 
$3,100,974
 
$3,362,843
 
$3,647,101
 
$3,732,887
 
$5,024,908
 
If none, please provide a more appropriate estimate in the adjoining box
 
 
 
 
Given the option selected does the sum of $3,614,542 provide a fair estimate of the capital cost of the retrofitting carried out on your building?
 
Yes
 
If No, please provide a more representative estimate in the adjoining box
 
 
 
 
Given the option selected. does the sum of $5,806 provide a fair estimate of the Annual Maintenance cost of your building?
 
Yes
 
If No, please provide a more representative estimate in the adjoining box
 
 
 
 
Given the option selected, does the sum of $48,331 provide a fair estimate of the annual cost for Electrical and Gas Energy Usage for your building?
 
Yes
 
If No, please provide a more representative estimate in the adjoining box
 
 
 
 
Could you please indicate the number of years since your building has been retrofitted to comply with the selected building configuration permutation to the nearest 5-year period?
Please select the earlier year if in-between ranges
 
5
 
10
 
15
 
20
 
25
 
Other
 
 
 
 
In your opinion, which of the following numerical estimates best indicates the overall cost that has been expended (in present-value terms) on your building for the Initial retrofitting, Maintenance and Utilities (i.e Electricity and Gas) over the last 5-year period of its life?
 
$3,840,289
 
$3,840,888
 
$3,852,235
 
$3,878,497
 
$3,929,534
 
If none, please provide a more appropriate estimate in the adjoining box
 
 
 
 
In your opinion, which of the following numerical estimates best indicates the overall cost that has been expended (in present-value terms) on your building for the Initial retrofitting, Maintenance and Utilities (i.e Electricity and Gas) over the last 10-year period of its life?
 
$3,927,747
 
$3,939,418
 
$3,953,721
 
$3,965,788
 
$4,188,448
 
If none, please provide a more appropriate estimate in the adjoining box
 
 
 
 
In your opinion, which of the following numerical estimates best indicates the overall cost that has been expended (in present-value terms) on your building for the Initial retrofitting, Maintenance and Utilities (i.e Electricity and Gas) over the last 15-year period of its life?
 
$3,945,252
 
$4,050,546
 
$4,080,298
 
$4,089,968
 
$4,523,969
 
If none, please provide a more appropriate estimate in the adjoining box
 
 
 
 
In your opinion, which of the following numerical estimates best indicates the overall cost that has been expended (in present-value terms) on your building for the Initial retrofitting, Maintenance and Utilities (i.e Electricity and Gas) over the last 20-year period of its life?
 
$3,929,823
 
$4,029,595
 
$4,057,750
 
$4,061,909
 
$4,861,129
 
If none, please provide a more appropriate estimate in the adjoining box
 
 
 
 
In your opinion, which of the following numerical estimates best indicates the overall cost that has been expended (in present-value terms) on your building for the Initial retrofitting, Maintenance and Utilities (i.e Electricity and Gas) over the last 25-year period of its life?
 
$3,916,607
 
$4,076,482
 
$4,240,731
 
$4,292,338
 
$5,091,195
 
If none, please provide a more appropriate estimate in the adjoining box
 
 
 
 
Given the option selected does the sum of $2,561,919 provide a fair estimate of the capital cost of the retrofitting carried out in your building?
 
Yes
 
If No, please provide a more representative estimate in the adjoining box
 
 
 
 
Given the option selected. does the sum of $8,760 provide a fair estimate of the Annual Maintenance cost of your building?
 
Yes
 
If No, please provide a more representative estimate in the adjoining box
 
 
 
 
Given the option selected, does the sum of $77,279 provide a fair estimate of the annual cost for Electrical and Gas Energy Usage for your building?
 
Yes
 
If No, please provide a more representative estimate in the adjoining box
 
 
 
 
Could you please indicate the number of years since your building has been retrofitted to comply with the selected building configuration permutation to the nearest 5-year period?
Please select the earlier year if in-between ranges
 
5
 
10
 
15
 
20
 
25
 
Other
 
 
 
 
In your opinion, which of the following numerical estimates best indicates the overall cost that has been expended (in present-value terms) on your building for the Initial retrofitting, Maintenance and Utilities (i.e Electricity and Gas) over the last 5-year period of its life?
 
$2,920,694
 
$2,921,645
 
$2,939,680
 
$2,981,417
 
$3,062,530
 
If none, please provide a more appropriate estimate in the adjoining box
 
 
 
 
In your opinion, which of the following numerical estimates best indicates the overall cost that has been expended (in present-value terms) on your building for the Initial retrofitting, Maintenance and Utilities (i.e Electricity and Gas) over the last 10-year period of its life?
 
$3,062,741
 
$3,081,404
 
$3,104,275
 
$3,123,570
 
$3,479,609
 
If none, please provide a more appropriate estimate in the adjoining box
 
 
 
 
In your opinion, which of the following numerical estimates best indicates the overall cost that has been expended (in present-value terms) on your building for the Initial retrofitting, Maintenance and Utilities (i.e. Electricity and Gas) over the last 15-year period of its life?
 
$3,093,053
 
$3,262,161
 
$3,309,943
 
$3,325,475
 
$4,022,499
 
If none, please provide a more appropriate estimate in the adjoining box
 
 
 
 
In your opinion, which of the following numerical estimates best indicates the overall cost that has been expended (in present-value terms) on your building for the Initial retrofitting, Maintenance and Utilities (i.e Electricity and Gas) over the last 20-year period of its life?
 
$3,068,275
 
$3,228,512
 
$3,273,731
 
$3,280,411
 
$4,563,994
 
If none, please provide a more appropriate estimate in the adjoining box
 
 
 
 
In your opinion, which of the following numerical estimates best indicates the overall cost that has been expended (in present-value terms) on your building for the Initial retrofitting, Maintenance and Utilities (i.e Electricity and Gas) over the last 25-year period of its life?
 
$3,046,134
 
$3,302,415
 
$3,545,463
 
$3,626,522
 
$4,929,017
 
If none, please provide a more appropriate estimate in the adjoining box
 
 
 
 
Given the option selected does the sum of $3,486,624 provide a fair estimate of the capital cost of the retrofitting carried out on your building?
 
Yes
 
If No, please provide a more representative estimate in the adjoining box
 
 
 
 
Given the option selected, does the sum of $4,206 provide a fair estimate of the Annual Maintenance cost of your building?
 
Yes
 
If No, please provide a more representative estimate in the adjoining box
 
 
 
 
Given the option selected, does the sum of $66,912 provide a fair estimate of the annual cost for Electrical and Gas Energy Usage for your building?
 
Yes
 
If No, please provide a more representative estimate in the adjoining box
 
 
 
 
Could you please indicate the number of years since your building has been retrofitted to comply with the selected building configuration permutation to the nearest 5-year period?
Please select the earlier year if in-between ranges
 
5
 
10
 
15
 
20
 
25
 
Other
 
 
 
 
In your opinion, which of the following numerical estimates best indicates the overall cost that has been expended (in present-value terms) on your building for the Initial retrofitting, Maintenance and Utilities (i.e Electricity and Gas) over the last 5-year period of its life?
 
$3,783,181
 
$3,783,968
 
$3,798,875
 
$3,833,373
 
$3,900,420
 
If none, please provide a more appropriate estimate in the adjoining box
 
 
 
 
In your opinion, which of the following numerical estimates best indicates the overall cost that has been expended (in present-value terms) on your building for the Initial retrofitting, Maintenance and Utilities (i.e Electricity and Gas) over the last 10-year period of its life?
 
$3,896,617
 
$3,911,895
 
$3,930,618
 
$3,946,414
 
$4,237,882
 
If none, please provide a more appropriate estimate in the adjoining box
 
 
 
 
In your opinion, which of the following numerical estimates best indicates the overall cost that has been expended (in present-value terms) on your building for the Initial retrofitting, Maintenance and Utilities (i.e Electricity and Gas) over the last 15-year period of its life?
 
$3,921,486
 
$4,059,942
 
$4,099,064
 
$4,111,780
 
$4,682,464
 
If none, please provide a more appropriate estimate in the adjoining box
 
 
 
 
In your opinion, which of the following numerical estimates best indicates the overall cost that has been expended (in present-value terms) on your building for the Initial retrofitting, Maintenance and Utilities (i.e Electricity and Gas) over the last 20-year period of its life?
 
$3,901,199
 
$4,032,393
 
$4,069,415
 
$4,074,884
 
$5,125,809
 
If none, please provide a more appropriate estimate in the adjoining box
 
 
 
 
In your opinion, which of the following numerical estimates best indicates the overall cost that has been expended (in present-value terms) on your building for the Initial retrofitting, Maintenance and Utilities (i.e Electricity and Gas) over the last 25-year period of its life?
 
$3,882,202
 
$4,091,570
 
$4,308,782
 
$4,376,541
 
$5,420,418
 
If none, please provide a more appropriate estimate in the adjoining box
 
 
 
 
Given the option selected does the sum of $3,486,624 provide a fair estimate of the capital cost of the retrofitting carried out in your building?
 
Yes
 
If No, please provide a more representative estimate in the adjoining box
 
 
 
 
Given the option selected. does the sum of $4,206 provide a fair estimate of the Annual Maintenance cost of your building?
 
Yes
 
If No, please provide a more representative estimate in the adjoining box
 
 
 
 
Given the option selected, does the sum of $66,912 provide a fair estimate of the annual cost for Electrical and Gas Energy Usage for your building?
 
Yes
 
If No, please provide a more representative estimate in the adjoining box
 
 
 
 
Could you please indicate the number of years since your building has been retrofitted to comply with the selected building configuration permutation to the nearest 5-year period?
Please select the earlier year if in-between ranges
 
5
 
10
 
15
 
20
 
25
 
Other
 
 
 
 
In your opinion, which of the following numerical estimates best indicates the overall cost that has been expended (in present-value terms) on your building for the Initial retrofitting, Maintenance and Utilities (i.e Electricity and Gas) over the last 5-year period of its life?
 
$3,783,181
 
$3,783,968
 
$3,798,875
 
$3,833,373
 
$3,900,420
 
If none, please provide a more appropriate estimate in the adjoining box
 
 
 
 
In your opinion, which of the following numerical estimates best indicates the overall cost that has been expended (in present-value terms) on your building for the Initial retrofitting, Maintenance and Utilities (i.e Electricity and Gas) over the last 10-year period of its life?
 
$3,896,617
 
$3,911,895
 
$3,930,618
 
$3,946,414
 
$4,237,882
 
If none, please provide a more appropriate estimate in the adjoining box
 
 
 
 
In your opinion, which of the following numerical estimates best indicates the overall cost that has been expended (in present-value terms) on your building for the Initial retrofitting, Maintenance and Utilities (i.e Electricity and Gas) over the last 15-year period of its life?
 
$3,921,486
 
$4,009,064
 
$4,059,942
 
$4,117,780
 
$4,682,464
 
If none, please provide a more appropriate estimate in the adjoining box
 
 
 
 
In your opinion, which of the following numerical estimates best indicates the overall cost that has been expended (in present-value terms) on your building for the Initial retrofitting, Maintenance and Utilities (i.e Electricity and Gas) over the last 20-year period of its life?
 
$3,901,199
 
$4,032,393
 
$4,069,415
 
$4,074,884
 
$5,125,809
 
If none, please provide a more appropriate estimate in the adjoining box
 
 
 
 
In your opinion, which of the following numerical estimates best indicates the overall cost that has been expended (in present-value terms) on your building for the Initial retrofitting, Maintenance and Utilities (i.e Electricity and Gas) over the last 25-year period of its life?
 
$3,882,202
 
$4,091,570
 
$4,308,782
 
$4,376,541
 
$5,420,418
 
If none, please provide a more appropriate estimate in the adjoining box
 
 
 
 
Given the option selected does the sum of $1,601,495 provide a fair estimate of the capital cost of the retrofitting carried out in your building?
 
Yes
 
If No, please provide a more representative estimate in the adjoining box
 
 
 
 
Given the option selected. does the sum of $8,760 provide a fair estimate of the Annual Maintenance cost of your building?
 
Yes
 
If No, please provide a more representative estimate in the adjoining box
 
 
 
 
Given the option selected, does the sum of $67,327 provide a fair estimation of the annual cost for Electrical and Gas Energy Usage for your building?
 
Yes
 
If No, please provide a more representative estimate in the adjoining box
 
 
 
 
Could you please indicate the number of years since your building has been retrofitted to comply with the selected building configuration permutation to the nearest 5-year period?
Please select the earlier year if in-between ranges
 
5
 
10
 
15
 
20
 
25
 
Other
 
 
 
 
In your opinion, which of the following numerical estimates best indicates the overall cost that has been expended (in present-value terms) on your building for the Initial retrofitting, Maintenance and Utilities (i.e Electricity and Gas) over the last 5-year period of its life?
 
$1,918,770
 
$1,919,611
 
$1,935,560
 
$1,972,468
 
$2,044,200
 
If none, please provide a more appropriate estimate in the adjoining box
 
 
 
 
In your opinion, which of the following numerical estimates best indicates the overall cost that has been expended (in present-value terms) on your building for the Initial retrofitting, Maintenance and Utilities (i.e Electricity and Gas) over the last 10-year period of its life?
 
$2,041,562
 
$2,057,960
 
$2,078,057
 
$2,095,012
 
$2,407,860
 
If none, please provide a more appropriate estimate in the adjoining box
 
 
 
 
In your opinion, which of the following numerical estimates best indicates the overall cost that has been expended (in present-value terms) on your building for the Initial retrofitting, Maintenance and Utilities (i.e Electricity and Gas) over the last 15-year period of its life?
 
$2,065,573
 
$2,213,331
 
$2,255,081
 
$2,268,652
 
$2,877,678
 
If none, please provide a more appropriate estimate in the adjoining box
 
 
 
 
In your opinion, which of the following numerical estimates best indicates the overall cost that has been expended (in present-value terms) on your building for the Initial retrofitting, Maintenance and Utilities (i.e Electricity and Gas) over the last 20-year period of its life?
 
$2,043,923
 
$2,183,931
 
$2,223,440
 
$2,229,277
 
$3,350,809
 
If none, please provide a more appropriate estimate in the adjoining box
 
 
 
 
In your opinion, which of the following numerical estimates best indicates the overall cost that has been expended (in present-value terms) on your building for the Initial retrofitting, Maintenance and Utilities (i.e Electricity and Gas) over the last 25-year period of its life?
 
$2,025,742
 
$2,250,285
 
$2,483,007
 
$2,555,657
 
$3,675,443
 
If none, please provide a more appropriate estimate in the adjoining box
 
 
 
 
Given the option selected does the sum of $1,932,668 provide a fair estimate of the capital cost of the retrofitting carried out on your building?
 
Yes
 
If No, please provide a more representative estimate in the adjoining box
 
 
 
 
Given the option selected. does the sum of $4,206 provide a fair estimate of the Annual Maintenance cost of your building?
 
Yes
 
If No, please provide a more representative estimate in the adjoining box
 
 
 
 
Given the option selected, does the sum of $57,419 provide a fair estimate of the annual cost for Electrical and Gas Energy Usage for your building?
 
Yes
 
If No, please provide a more representative estimate in the adjoining box
 
 
 
 
Could you please indicate the number of years since your building has been retrofitted to comply with the selected building configuration permutation to the nearest 5-year period?
Please select the earlier year if in-between ranges
 
5
 
10
 
15
 
20
 
25
 
Other
 
 
 
 
In your opinion, which of the following numerical estimates best indicates the overall cost that has been expended (in present-value terms) on your building for the Initial retrofitting, Maintenance and Utilities (i.e Electricity and Gas) over the last 5-year period of its life?
 
$2,189,639
 
$2,190,320
 
$2,203,237
 
$2,233,131
 
$2,291,228
 
If none, please provide a more appropriate estimate in the adjoining box
 
 
 
 
In your opinion, which of the following numerical estimates best indicates the overall cost that has been expended (in present-value terms) on your building for the Initial retrofitting, Maintenance and Utilities (i.e Electricity and Gas) over the last 10-year period of its life?
 
$2,286,219
 
$2,299,393
 
$2,315,539
 
$2,329,160
 
$2,580,503
 
If none, please provide a more appropriate estimate in the adjoining box
 
 
 
 
In your opinion, which of the following numerical estimates best indicates the overall cost that has been expended (in present-value terms) on your building for the Initial retrofitting, Maintenance and Utilities (i.e Electricity and Gas) over the last 15-year period of its life?
 
$2,306,118
 
$2,425,020
 
$2,458,617
 
$2,469,537
 
$2,959,627
 
If none, please provide a more appropriate estimate in the adjoining box
 
 
 
 
In your opinion, which of the following numerical estimates best indicates the overall cost that has been expended (in present-value terms) on your building for the Initial retrofitting, Maintenance and Utilities (i.e Electricity and Gas) over the last 20-year period of its life?
 
$2,288,695
 
$2,401,361
 
$2,433,155
 
$2,437,852
 
$3,340,361
 
If none, please provide a more appropriate estimate in the adjoining box
 
 
 
 
In your opinion, which of the following numerical estimates best indicates the overall cost that has been expended (in present-value terms) on your building for the Initial retrofitting, Maintenance and Utilities (i.e Electricity and Gas) over the last 25-year period of its life?
 
$2,273,051
 
$2,453,206
 
$2,652,112
 
$2,711,405
 
$3,596,640
 
If none, please provide a more appropriate estimate in the adjoining box
 
 
 
 
Given the option selected does the sum of $1,810,318 provide a fair estimate of the capital cost of the retrofitting carried out on your building?
 
Yes
 
If No, please provide a more representative estimate in the adjoining box
 
 
 
 
Given the option selected, does the sum of $8,760 provide a fair estimate of the Annual Maintenance cost of your building?
 
Yes
 
If No, please provide a more representative estimate in the adjoining box
 
 
 
 
Given the option selected, does the sum of $69,380 provide a fair estimate of the annual cost for Electrical and Gas Energy Usage for your building?
 
Yes
 
If No, please provide a more representative estimate in the adjoining box
 
 
 
 
Could you please indicate the number of years since your building has been retrofitted to comply with the selected building configuration permutation to the nearest 5-year period?
Please select the earlier year if in-between ranges
 
5
 
10
 
15
 
20
 
25
 
Other
 
 
 
 
In your opinion, which of the following numerical estimates best indicates the overall cost that has been expended (in present-value terms) on your building for the Initial retrofitting Maintenance and Utilities (i.e Electricity and Gas) over the last 5-year period of its life?
 
$2,136,154
 
$2,137,019
 
$2,153,397
 
$2,191,302
 
$2,264,969
 
If none, please provide a more appropriate estimate in the adjoining box
 
 
 
 
In your opinion, which of the following numerical estimates best indicates the overall cost that has been expended (in present-value terms) on your building for the Initial retrofitting , Maintenance and Utilities (i.e Electricity and Gas) over the last 10-year period of its life?
 
$2,257,796
 
$2,274,471
 
$2,294,906
 
$2,312,146
 
$2,630,263
 
If none, please provide a more appropriate estimate in the adjoining box
 
 
 
 
In your opinion, which of the following numerical estimates best indicates the overall cost that has been expended (in present-value terms) on your building for the Initial retrofitting, Maintenance and Utilities (i.e Electricity and Gas) over the last 15-year period of its life?
 
$2,279,584
 
$2,428,993
 
$2,471,210
 
$2,484,932
 
$3,100,764
 
If none, please provide a more appropriate estimate in the adjoining box
 
 
 
 
In your opinion, which of the following numerical estimates best indicates the overall cost that has been expended (in present-value terms) on your building for the Initial retrofitting, Maintenance and Utilities (i.e Electricity and Gas) over the last 20-year period of its life?
 
$2,257,691
 
$2,399,264
 
$2,439,215
 
$2,445,117
 
$3,579,183
 
If none, please provide a more appropriate estimate in the adjoining box
 
 
 
 
In your opinion, which of the following numerical estimates best indicates the overall cost that has been expended (in present-value terms) on your building for the Initial retrofitting Maintenance and Utilities (i.e Electricity and Gas) over the last 25-year period of its life?
 
$2,240,133
 
$2,467,622
 
$2,731,133
 
$2,807,022
 
$3,911,480
 
If none, please provide a more appropriate estimate in the adjoining box
 
 
 
 
Given the option selected does the sum of $2,188,207 provide a fair estimate of the capital cost of the retrofitting carried out in your building?
 
Yes
 
If No, please provide a more representative estimate in the adjoining box
 
 
 
 
Given the option selected. does the sum of $5,806 provide a fair estimate of the Annual Maintenance cost of your building?
 
Yes
 
If No, please provide a more representative estimate in the adjoining box
 
 
 
 
Given the option selected, does the sum of $65,861 provide a fair estimate of the annual cost for Electrical and Gas Energy Usage for your building?
 
Yes
 
If No, please provide a more representative estimate in the adjoining box
 
 
 
 
Could you please indicate the number of years since your building has been retrofitted to comply with the selected building configuration permutation to the nearest 5-year period?
Please select the earlier year if in-between ranges
 
5
 
10
 
15
 
20
 
25
 
Other
 
 
 
 
In your opinion, which of the following numerical estimates best indicates the overall cost that has been expended (in present-value terms) on your building for the Initial retrofitting, Maintenance and Utilities (i.e Electricity and Gas) over the last 5-year period of its life?
 
$2,487,052
 
$2,487,845
 
$2,502,867
 
$2,537,632
 
$2,605,196
 
If none, please provide a more appropriate estimate in the adjoining box
 
 
 
 
In your opinion, which of the following numerical estimates best indicates the overall cost that has been expended (in present-value terms) on your building for the Initial retrofitting, Maintenance and Utilities (i.e Electricity and Gas) over the last 10-year period of its life?
 
$2,601,693
 
$2,617,101
 
$2,635,984
 
$2,651,914
 
$2,945,865
 
If none, please provide a more appropriate estimate in the adjoining box
 
 
 
 
In your opinion, which of the following numerical estimates best indicates the overall cost that has been expended (in present-value terms) on your building for the Initial retrofitting, Maintenance and Utilities (i.e Electricity and Gas) over the last 15-year period of its life?
 
$2,625,664
 
$2,764,945
 
$2,804,300
 
$2,817,092
 
$3,391,180
 
If none, please provide a more appropriate estimate in the adjoining box
 
 
 
 
In your opinion, which of the following numerical estimates best indicates the overall cost that has been expended (in present-value terms) on your building for the Initial retrofitting, Maintenance and Utilities (i.e Electricity and Gas) over the last 20-year period of its life.
 
$2,605,255
 
$2,737,231
 
$2,774,474
 
$2,779,976
 
$3,837,170
 
If none, please provide a more appropriate estimate in the adjoining box
 
 
 
 
In your opinion, which of the following numerical estimates best indicates the overall cost that has been expended (in present-value terms) on your building for the Initial retrofitting, Maintenance and Utilities (i.e Electricity and Gas) over the last 25-year period of its life.
 
$2,586,955
 
$2,798,002
 
$3,018,117
 
$3,086,514
 
$4,137,501
 
If none, please provide a more appropriate estimate in the adjoining box
 
 
 
 
Given the option selected does the sum of $2,788,473 provide a fair estimate of the capital cost of the retrofitting carried out in your building?
 
Yes
 
If No, please provide a more representative estimate in the adjoining box
 
 
 
 
Given the option selected. does the sum of $4,206 provide a fair estimate of the Annual Maintenance cost of your building?
 
Yes
 
If No, please provide a more representative estimate in the adjoining box
 
 
 
 
Given the option selected, does the sum of $63,298 provide a fair estimate of the annual cost for Electrical and Gas Energy Usage for your building?
 
Yes
 
If No, please provide a more representative estimate in the adjoining box
 
 
 
 
Could you please indicate the number of years since your building has been retrofitted to comply with the selected building configuration permutations to the nearest 5-year period?
Please select the earlier year if in-between ranges
 
5
 
10
 
15
 
20
 
25
 
Other
 
 
 
 
In your opinion, which of the following numerical estimates best indicates the overall cost that has been expended (in present-value terms) on your building for the Initial retrofitting, Maintenance and Utilities (i.e Electricity and Gas) over the last 5-year period of its life?
 
$3,069,957
 
$3,070,704
 
$3,084,853
 
$3,117,598
 
$3,181,238
 
If none, please provide a more appropriate estimate in the adjoining box
 
 
 
 
In your opinion, which of the following numerical estimates best indicates the overall cost that has been expended (in present-value terms) on your building for the Initial retrofitting, Maintenance and Utilities (i.e Electricity and Gas) over the last 10-year period of its life?
 
$3,173,941
 
$3,188,305
 
$3,205,909
 
$3,220,760
 
$3,494,793
 
If none, please provide a more appropriate estimate in the adjoining box
 
 
 
 
In your opinion, which of the following numerical estimates best indicates the overall cost that has been expended (in present-value terms) on your building for the Initial retrofitting, Maintenance and Utilities (i.e Electricity and Gas) over the last 15-year period of its life?
 
$3,194,831
 
$3,324,211
 
$3,360,769
 
$3,372,651
 
$3,905,928
 
If none, please provide a more appropriate estimate in the adjoining box
 
 
 
 
In your opinion, which of the following numerical estimates best indicates the overall cost that has been expended (in present-value terms) on your building for the Initial retrofitting, Maintenance and Utilities (i.e Electricity and Gas) over the last 20-year period of its life?
 
$3,175,874
 
$3,298,468
 
$3,333,063
 
$3,338,174
 
$4,320,213
 
If none, please provide a more appropriate estimate in the adjoining box
 
 
 
 
In your opinion, which of the following numerical estimates best indicates the overall cost that has been expended (in present-value terms) on your building for the Initial retrofitting, Maintenance and Utilities (i.e Electricity and Gas) over the last 25-year period of its life?
 
$3,159,005
 
$3,355,118
 
$3,582,333
 
$3,647,759
 
$4,599,832
 
If none, please provide a more appropriate estimate in the adjoining box
 
 
 
 
Given the option selected does the sum of $2,082,840 provide a fair estimate of the capital cost of the retrofitting carried out in your building?
 
Yes
 
If No, please provide a more representative estimate in the adjoining box
 
 
 
 
Given the option selected. does the sum of $4,206 provide a fair estimate of the Annual Maintenance cost of your building?
 
Yes
 
If No, please provide a more representative estimate in the adjoining box
 
 
 
 
Given the option selected, does the sum of $74,930 provide a fair estimate of the annual cost for Electrical and Gas Energy Usage for your building?
 
Yes
 
If No, please provide a more representative estimate in the adjoining box
 
 
 
 
Could you please indicate the number of years since your building has been retrofitted to comply with the selected building configuration permutation to the nearest 5-year period?
Please select the earlier year if in-between ranges
 
5
 
10
 
15
 
20
 
25
 
Other
 
 
 
 
In your opinion, which of the following numerical estimates best indicates the overall cost that has been expended (in present-value terms) on your building for the Initial retrofitting, Maintenance and Utilities (i.e Electricity and Gas) over the last 5-year period of its life?
 
$2,412,831
 
$2,413,706
 
$2,430,294
 
$2,468,682
 
$2,543,288
 
If none, please provide a more appropriate estimate in the adjoining box
 
 
 
 
In your opinion, which of the following numerical estimates best indicates the overall cost that has been expended (in present-value terms) on your building for the Initial retrofitting, Maintenance and Utilities (i.e Electricity and Gas) over the last 10-year period of its life?
 
$2,540,159
 
$2,557,201
 
$2,578,086
 
$2,595,705
 
$2,920,818
 
If none, please provide a more appropriate estimate in the adjoining box
 
 
 
 
In your opinion, which of the following numerical estimates best indicates the overall cost that has been expended (in present-value terms) on your building for the Initial retrofitting, Maintenance and Utilities (i.e Electricity and Gas) over the last 15-year period of its life?
 
$2,568,991
 
$2,723,775
 
$2,767,511
 
$2,781,727
 
$3,419,718
 
If none, please provide a more appropriate estimate in the adjoining box
 
 
 
 
In your opinion, which of the following numerical estimates best indicates the overall cost that has been expended (in present-value terms) on your building for the Initial retrofitting, Maintenance and Utilities (i.e Electricity and Gas) over the last 20-year period of its life?
 
$2,546,311
 
$2,692,977
 
$2,734,365
 
$2,740,480
 
$3,915,351
 
If none, please provide a more appropriate estimate in the adjoining box
 
 
 
 
In your opinion, which of the following numerical estimates best indicates the overall cost that has been expended (in present-value terms) on your building for the Initial retrofitting, Maintenance and Utilities (i.e Electricity and Gas) over the last 25-year period of its life?
 
$2,524,578
 
$2,758,378
 
$2,992,974
 
$3,067,983
 
$4,242,289
 
If none, please provide a more appropriate estimate in the adjoining box
 
 
 
 
Given the option selected does the sum of $2,815,712 provide a fair estimate of the capital cost of the retrofitting carried out in your building?
 
Yes
 
If No, please provide a more representative estimate in the adjoining box
 
 
 
 
Given the option selected. does the sum of $4,206 provide a fair estimate of the Annual Maintenance cost of your building?
 
Yes
 
If No, please provide a more representative estimate in the adjoining box
 
 
 
 
Given the option selected, does the sum of $64,914 provide a fair estimate of the annual cost for Electrical and Gas Energy Usage for your building?
 
Yes
 
If No, please provide a more representative estimate in the adjoining box
 
 
 
 
Could you please indicate the number of years since your building has been retrofitted to comply with the selected building configuration permutation to the nearest 5-year period?
Please select the earlier year if in-between ranges
 
5
 
10
 
15
 
20
 
25
 
Other
 
 
 
 
In your opinion, which of the following numerical estimates best indicates the overall cost that has been expended (in present-value terms) on your building for the Initial retrofitting, Maintenance and Utilities (i.e Electricity and Gas) over the last 5-year period of its life?
 
$3,103,936
 
$3,104,701
 
$3,119,189
 
$3,152,718
 
$3,217,882
 
If none, please provide a more appropriate estimate in the adjoining box
 
 
 
 
In your opinion, which of the following numerical estimates best indicates the overall cost that has been expended (in present-value terms) on your building for the Initial retrofitting, Maintenance and Utilities (i.e Electricity and Gas) over the last 10-year period of its life?
 
$3,216,314
 
$3,231,242
 
$3,249,536
 
$3,264,970
 
$3,549,763
 
If none, please provide a more appropriate estimate in the adjoining box
 
 
 
 
In your opinion, which of the following numerical estimates best indicates the overall cost that has been expended (in present-value terms) on your building for the Initial retrofitting, Maintenance and Utilities (i.e Electricity and Gas) over the last 15-year period of its life?
 
$3,241,850
 
$3,377,527
 
$3,415,864
 
$3,428,325
 
$3,987,560
 
If none, please provide a more appropriate estimate in the adjoining box
 
 
 
 
In your opinion, which of the following numerical estimates best indicates the overall cost that has been expended (in present-value terms) on your building for the Initial retrofitting, Maintenance and Utilities (i.e Electricity and Gas) over the last 20-year period of its life?
 
$3,221,969
 
$3,350,531
 
$3,386,810
 
$3,392,170
 
$4,422,011
 
If none, please provide a more appropriate estimate in the adjoining box
 
 
 
 
In your opinion, which of the following numerical estimates best indicates the overall cost that has been expended (in present-value terms) on your building for the Initial retrofitting, Maintenance and Utilities (i.e Electricity and Gas) over the last 25-year period of its life?
 
$3,202,978
 
$3,407,948
 
$3,607,378
 
$3,672,624
 
$4,708,878
 
If none, please provide a more appropriate estimate in the adjoining box
 
 
 
 
Given the option selected does the sum of $2,043,755 provide a fair estimate of the capital cost of the retrofitting carried out in your building?
 
Yes
 
If No, please provide a more representative estimate in the adjoining box
 
 
 
 
Given the option selected does the sum of $10,360 provide a fair estimate of the Annual Maintenance cost of your building?
 
Yes
 
If No, please provide a more representative estimate in the adjoining box
 
 
 
 
Given the option selected, does the sum of $65,861 provide a fair estimate of the annual cost for Electrical and Gas Energy Usage for your building?
 
Yes
 
If No, please provide a more representative estimate in the adjoining box
 
 
 
 
Could you please indicate the number of years since your building has been retrofitted to comply with the selected building configuration permutation to the nearest 5-year period?
Please select the earlier year if in-between ranges
 
5
 
10
 
15
 
20
 
25
 
Other
 
 
 
 
In your opinion, which of the following numerical estimates best indicates the overall cost that has been expended (in present-value terms) on your building for the Initial retrofitting, Maintenance and Utilities (i.e Electricity and Gas) over the last 5-year period of its life?
 
$2,361,591
 
$2,362,434
 
$2,378,410
 
$2,415,385
 
$2,487,242
 
If none, please provide a more appropriate estimate in the adjoining box
 
 
 
 
In your opinion, which of the following numerical estimates best indicates the overall cost that has been expended (in present-value terms) on your building for the Initial retrofitting, Maintenance and Utilities (i.e Electricity and Gas) over the last 10-year period of its life?
 
$2,488,023
 
$2,504,578
 
$2,524,867
 
$2,541,983
 
$2,857,817
 
If none, please provide a more appropriate estimate in the adjoining box
 
 
 
 
In your opinion, which of the following numerical estimates best indicates the overall cost that has been expended (in present-value terms) on your building for the Initial retrofitting, Maintenance and Utilities (i.e Electricity and Gas) over the last 15-year period of its life?
 
$2,513,100
 
$2,662,535
 
$2,704,759
 
$2,718,483
 
$3,334,420
 
If none, please provide a more appropriate estimate in the adjoining box
 
 
 
 
In your opinion, which of the following numerical estimates best indicates the overall cost that has been expended (in present-value terms) on your building for the Initial retrofitting, Maintenance and Utilities (i.e Electricity and Gas) over the last 20-year period of its life?
 
$2,491,204
 
$2,632,801
 
$2,672,759
 
$2,678,662
 
$3,812,921
 
If none, please provide a more appropriate estimate in the adjoining box
 
 
 
 
In your opinion, which of the following numerical estimates best indicates the overall cost that has been expended (in present-value terms) on your building for the Initial retrofitting, Maintenance and Utilities (i.e Electricity and Gas) over the last 25-year period of its life?
 
$2,472,976
 
$2,700,151
 
$2,917,233
 
$2,989,221
 
$4,142,017
 
If none, please provide a more appropriate estimate in the adjoining box
 
 
 
 
Given the option selected does the sum of $3,112,358 provide a fair estimate of the capital cost of the retrofitting carried out in your building?
 
Yes
 
If No, please provide a more representative estimate in the adjoining box
 
 
 
 
Given the option selected. does the sum of $10,360 provide a fair estimate of the Annual Maintenance cost of your building?
 
Yes
 
If No, please provide a more representative estimate in the adjoining box
 
 
 
 
Given the option selected, does the sum of $58,999 provide a fair estimate of the annual cost for Electrical and Gas Energy Usage for your building?
 
Yes
 
If No, please provide a more representative estimate in the adjoining box
 
 
 
 
Could you please indicate the number of years since your building has been retrofitted to comply with the selected building configuration permutation to the nearest 5-year period?
Please select the earlier year if in-between ranges
 
5
 
10
 
15
 
20
 
25
 
Other
 
 
 
 
In your opinion, which of the following numerical estimates best indicates the overall cost that has been expended (in present-value terms) on your building for the Initial retrofitting, Maintenance and Utilities (i.e Electricity and Gas) over the last 5-year period of its life?
 
$3,401,579
 
$3,402,346
 
$3,416,884
 
$3,450,530
 
$3,515,918
 
If none, please provide a more appropriate estimate in the adjoining box
 
 
 
 
In your opinion, which of the following numerical estimates best indicates the overall cost that has been expended (in present-value terms) on your building for the Initial retrofitting, Maintenance and Utilities (i.e Electricity and Gas) over the last 10-year period of its life?
 
$3,517,602
 
$3,532,703
 
$3,551,210
 
$3,566,823
 
$3,854,915
 
If none, please provide a more appropriate estimate in the adjoining box
 
 
 
 
In your opinion, which of the following numerical estimates best indicates the overall cost that has been expended (in present-value terms) on your building for the Initial retrofitting, Maintenance and Utilities (i.e Electricity and Gas) over the last 15-year period of its life?
 
$3,540,309
 
$3,676,563
 
$3,715,063
 
$3,727,577
 
$4,289,191
 
If none, please provide a more appropriate estimate in the adjoining box
 
 
 
 
In your opinion, which of the following numerical estimates best indicates the overall cost that has been expended (in present-value terms) on your building for the Initial retrofitting, Maintenance and Utilities (i.e Electricity and Gas) over the last 20-year period of its life?
 
$3,520,344
 
$3,649,452
 
$3,685,886
 
$3,691,268
 
4,725,490
 
$
 
If none, please provide a more appropriate estimate in the adjoining box
 
 
 
 
In your opinion, which of the following numerical estimates best indicates the overall cost that has been expended (in present-value terms) on your building for the Initial retrofitting, Maintenance and Utilities over the last 25-year period of its life.
 
$3,504,040
 
$3,711,347
 
$3,905,262
 
$3,970,609
 
$5,027,110
 
If none, please provide a more appropriate estimate in the adjoining box
 
 
 
 
Given the option selected does the sum of $3,028,724 provide a fair estimate of the capital cost of the retrofitting carried out in your building?
 
Yes
 
If No, please provide a more representative estimate in the adjoining box
 
 
 
 
Given the option selected. does the sum of $8,760 provide a fair estimate of the Annual Maintenance cost of your building?
 
Yes
 
If No, please provide a more representative estimate in the adjoining box
 
 
 
 
Given the option selected, does the sum of $80,522 provide a fair estimate of the annual cost for Electrical and Gas Energy Usage for your building?
 
Yes
 
If No, please provide a more representative estimate in the adjoining box
 
 
 
 
Could you please indicate the number of years since your building has been retrofitted to comply with the selected building configuration permutation to the nearest 5-year period?
Please select the earlier year if in-between ranges
 
5
 
10
 
15
 
20
 
25
 
Other
 
 
 
 
In your opinion, which of the following numerical estimates best indicates the overall cost that has been expended (in present-value terms) on your building for the Initial retrofitting, Maintenance and Utilities (i.e Electricity and Gas) over the last 5-year period of its life?
 
$3,401,021
 
$3,402,009
 
$3,420,723
 
$3,464,033
 
$3,548,204
 
If none, please provide a more appropriate estimate in the adjoining box
 
 
 
 
In your opinion, which of the following numerical estimates best indicates the overall cost that has been expended (in present-value terms) on your building for the Initial retrofitting, Maintenance and Utilities (i.e Electricity and Gas) over the last 10-year period of its life?
 
$3,542,579
 
$3,561,727
 
$3,585,194
 
$3,604,991
 
$3,970,296
 
If none, please provide a more appropriate estimate in the adjoining box
 
 
 
 
In your opinion, which of the following numerical estimates best indicates the overall cost that has been expended (in present-value terms) on your building for the Initial retrofitting, Maintenance and Utilities (i.e Electricity and Gas) over the last 15-year period of its life?
 
$3,570,291
 
$3,742,720
 
$3,791,442
 
$3,807,278
 
$4,517,995
 
If none, please provide a more appropriate estimate in the adjoining box
 
 
 
 
In your opinion, which of the following numerical estimates best indicates the overall cost that has been expended (in present-value terms) on your building for the Initial retrofitting, Maintenance and Utilities (i.e Electricity and Gas) over the last 20-year period of its life?
 
$3,545,026
 
$3,708,411
 
$3,754,518
 
$3,761,329
 
$5,070,127
 
If none, please provide a more appropriate estimate in the adjoining box
 
 
 
 
In your opinion, which of the following numerical estimates best indicates the overall cost that has been expended (in present-value terms) on your building for the Initial retrofitting, Maintenance and Utilities (i.e Electricity and Gas) over the last 25-year period of its life?
 
$3,523,495
 
$3,785,364
 
$4,069,621
 
$4,155,407
 
$5,447,428
 
If none, please provide a more appropriate estimate in the adjoining box
 
 
 
 
Given the option selected does the sum of $3,998,219 provide a fair estimate of the capital cost of the retrofitting carried out in your building?
 
Yes
 
If No, please provide a more representative estimate in the adjoining box
 
 
 
 
Given the option selected. does the sum of $5,806 provide a fair estimate of the Annual Maintenance cost of your building?
 
Yes
 
If No, please provide a more representative estimate in the adjoining box
 
 
 
 
Given the option selected, does the sum of $48,331 provide a fair estimate of the annual cost for Electrical and Gas Energy Usage for your building?
 
Yes
 
If No, please provide a more representative estimate in the adjoining box
 
 
 
 
Could you please indicate the number of years since your building has been retrofitted to comply with the selected building configuration permutation to the nearest 5-year period?
Please select the earlier year if in-between ranges
 
5
 
10
 
15
 
20
 
25
 
Other
 
 
 
 
In your opinion, which of the following numerical estimates best indicates the overall cost that has been expended (in present-value terms) on your building for the Initial retrofitting, Maintenance and Utilities (i.e Electricity and Gas) over the last 5-year period of its life?
 
$4,223,965
 
$4,224,564
 
$4,235,911
 
$4,262,173
 
$4,313,211
 
If none, please provide a more appropriate estimate in the adjoining box
 
 
 
 
In your opinion, which of the following numerical estimates best indicates the overall cost that has been expended (in present-value terms) on your building for the Initial retrofitting, Maintenance and Utilities (i.e Electricity and Gas) over the last 10-year period of its life?
 
$4,311,423
 
$4,323,094
 
$4,337,397
 
$4,349,464
 
$4,572,124
 
If none, please provide a more appropriate estimate in the adjoining box
 
 
 
 
In your opinion, which of the following numerical estimates best indicates the overall cost that has been expended (in present-value terms) on your building for the Initial retrofitting, Maintenance and Utilities (i.e Electricity and Gas) over the last 15-year period of its life?
 
$4,328,928
 
$4,434,222
 
$4,463,974
 
$4,473,644
 
$4,907,645
 
If none, please provide a more appropriate estimate in the adjoining box
 
 
 
 
In your opinion, which of the following numerical estimates best indicates the overall cost that has been expended (in present-value terms) on your building for the Initial retrofitting Maintenance and Utilities (i.e Electricity and Gas) over the last 20-year period of its life?
 
$4,313,499
 
$4,413,271
 
$4,441,426
 
$4,445,585
 
$5,244,805
 
If none, please provide a more appropriate estimate in the adjoining box
 
 
 
 
In your opinion, which of the following numerical estimates best indicates the overall cost that has been expended (in present-value terms) on your building for the Initial retrofitting, Maintenance and Utilities (i.e Electricity and Gas) over the last 25-year period of its life?
 
$4,300,283
 
$4,460,158
 
$4,624,407
 
$4,676,015
 
$5,474,871
 
If none, please provide a more appropriate estimate in the adjoining box
 
 
 
 
Given the option selected does the sum of $3,211,849 provide a fair estimate of the capital cost of the retrofitting carried out in your building?
 
Yes
 
If No, please provide a more representative estimate in the adjoining box
 
 
 
 
Given the option selected. does the sum of $8,760 provide a fair estimate of the Annual Maintenance cost of your building?
 
Yes
 
If No, please provide a more representative estimate in the adjoining box
 
 
 
 
Given the option selected, does the sum of $84,021 provide a fair estimate of the annual cost for Electrical and Gas Energy Usage for your building?
 
Yes
 
If No, please provide a more representative estimate in the adjoining box
 
 
 
 
Could you please indicate the number of years since your building has been retrofitted to comply with the selected building configuration permutation to the nearest 5-year period?
Please select the earlier year if in-between ranges
 
5
 
10
 
15
 
20
 
25
 
Other
 
 
 
 
In your opinion, which of the following numerical estimates best indicates the overall cost that has been expended (in present-value terms) on your building for the Initial retrofitting, Maintenance and Utilities (i.e Electricity and Gas) over the last 5-year period of its life?
 
$3,598,735
 
$3,599,762
 
$3,619,209
 
$3,664,216
 
$3,751,686
 
If none, please provide a more appropriate estimate in the adjoining box
 
 
 
 
In your opinion, which of the following numerical estimates best indicates the overall cost that has been expended (in present-value terms) on your building for the Initial retrofitting, Maintenance and Utilities (i.e Electricity and Gas) over the last 10-year period of its life?
 
$3,739,765
 
$3,759,437
 
$3,783,546
 
$3,803,884
 
$4,179,186
 
If none, please provide a more appropriate estimate in the adjoining box
 
 
 
 
In your opinion, which of the following numerical estimates best indicates the overall cost that has been expended (in present-value terms) on your building for the Initial retrofitting, Maintenance and Utilities (i.e Electricity and Gas) over the last 15-year period of its life?
 
$3,764,672
 
$3,940,685
 
$3,990,419
 
$4,006,585
 
$4,732,073
 
If none, please provide a more appropriate estimate in the adjoining box
 
 
 
 
In your opinion, which of the following numerical estimates best indicates the overall cost that has been expended (in present-value terms) on your building for the Initial retrofitting, Maintenance and Utilities (i.e Electricity and Gas) over the last 20-year period of its life?
 
$3,738,882
 
$3,905,663
 
$3,952,728
 
$3,959,680
 
$5,295,680
 
If none, please provide a more appropriate estimate in the adjoining box
 
 
 
 
In your opinion, which of the following numerical estimates best indicates the overall cost that has been expended (in present-value terms) on your building for the Initial retrofitting, Maintenance and Utilities (i.e Electricity and Gas) over the last 25-year period of its life?
 
$3,718,009
 
$3,985,905
 
$4,314,622
 
$4,405,507
 
$5,686,228
 
If none, please provide a more appropriate estimate in the adjoining box
 
 
 
 
Given the option selected does the sum of $3,870,300 provide a fair estimate of the capital cost of the retrofitting carried out in your building?
 
Yes
 
If No, please provide a more representative estimate in the adjoining box
 
 
 
 
Given the option selected. does the sum of $4,206 provide a fair estimate of the Annual Maintenance cost of your building?
 
Yes
 
If No, please provide a more representative estimate in the adjoining box
 
 
 
 
Given the option selected, does the sum of $66,912 provide a fair estimate of the annual cost for Electrical and Gas Energy Usage for your building?
 
Yes
 
If No, please provide a more representative estimate in the adjoining box
 
 
 
 
Could you please indicate the number of years since your building has been retrofitted to comply with the selected building configuration permutation to the nearest 5-year period?
Please select the earlier year if in-between ranges
 
5
 
10
 
15
 
20
 
25
 
Other
 
 
 
 
In your opinion, which of the following numerical estimates best indicates the overall cost that has been expended (in present-value terms) on your building for the Initial retrofitting, Maintenance and Utilities (i.e Electricity and Gas) over the last 5-year period of its life?
 
$4,166,857
 
$4,167,644
 
$4,182,551
 
$4,217,050
 
$4,284,096
 
If none, please provide a more appropriate estimate in the adjoining box
 
 
 
 
In your opinion, which of the following numerical estimates best indicates the overall cost that has been expended (in present-value terms) on your building for the Initial retrofitting, Maintenance and Utilities (i.e Electricity and Gas) over the last 10-year period of its life?
 
$4,280,293
 
$4,295,571
 
$4,314,295
 
$4,330,090
 
$4,621,558
 
If none, please provide a more appropriate estimate in the adjoining box
 
 
 
 
In your opinion, which of the following numerical estimates best indicates the overall cost that has been expended (in present-value terms) on your building for the Initial retrofitting, Maintenance and Utilities (i.e Electricity and Gas) over the last 15-year period of its life?
 
$4,305,163
 
$4,443,618
 
$4,482,740
 
$4,495,456
 
$5,066,140
 
If none, please provide a more appropriate estimate in the adjoining box
 
 
 
 
In your opinion, which of the following numerical estimates best indicates the overall cost that has been expended (in present-value terms) on your building for the Initial retrofitting, Maintenance and Utilities (i.e Electricity and Gas ) over the last 20-year period of its life?
 
$4,284,875
 
$4,416,069
 
$4,453,091
 
$4,458,560
 
$5,509,485
 
If none, please provide a more appropriate estimate in the adjoining box
 
 
 
 
In your opinion, which of the following numerical estimates best indicates the overall cost that has been expended (in present-value terms) on your building for the Initial retrofitting, Maintenance and Utilities (i.e Electricity and Gas) over the last 25-year period of its life?
 
$4,265,878
 
$4,475,246
 
$4,692,458
 
$4,760,217
 
$5,804,094
 
If none, please provide a more appropriate estimate in the adjoining box
 
 
 
 
Given the option selected does the sum of $3,870,300 provide a fair estimate of the capital cost of the retrofitting carried out in your building?
 
Yes
 
If No, please provide a more representative estimate in the adjoining box
 
 
 
 
Given the option selected. does the sum of $4,206 provide a fair estimate of the Annual Maintenance cost of your building?
 
Yes
 
If No, please provide a more representative estimate in the adjoining box
 
 
 
 
Given the option selected, does the sum of $66,912 provide a fair estimate of the annual cost for Electrical and Gas Energy Usage for your building?
 
Yes
 
If No, please provide a more representative estimate in the adjoining box
 
 
 
 
Could you please indicate the number of years since your building has been retrofitted to comply with the selected building configuration permutation to the nearest 5-year period?
Please select the earlier year if in-between ranges
 
5
 
10
 
15
 
20
 
25
 
Other
 
 
 
 
In your opinion, which of the following numerical estimates best indicates the overall cost that has been expended (in present-value terms) on your building for the Initial retrofitting Maintenance and Utilities (i.e Electricity and Gas) over the last 5-year period of its life?
 
$4,166,857
 
$4,167,644
 
$4,182,551
 
$4,217,050
 
$4,284,096
 
If none, please provide a more appropriate estimate in the adjoining box
 
 
 
 
In your opinion, which of the following numerical estimates best indicates the overall cost that has been expended (in present-value terms) on your building for the Initial retrofitting, Maintenance and Utilities (i.e Electricity and Gas) over the last 10-year period of its life?
 
$4,280,293
 
$4,295,571
 
$4,314,295
 
$4,330,090
 
$4,621,558
 
If none, please provide a more appropriate estimate in the adjoining box
 
 
 
 
In your opinion, which of the following numerical estimates best indicates the overall cost that has been expended (in present-value terms) on your building for the Initial retrofitting, Maintenance and Utilities (i.e Electricity and Gas) over the last 15-year period of its life?
 
$4,305,163
 
$4,443,618
 
$4,482,740
 
$4,495,456
 
$5,066,140
 
If none, please provide a more appropriate estimate in the adjoining box
 
 
 
 
In your opinion, which of the following numerical estimates best indicates the overall cost that has been expended (in present-value terms) on your building for the Initial retrofitting, Maintenance and Utilities (i.e Electricity and Gas) over the last 20-year period of its life?
 
$4,284,875
 
$4,416,069
 
$4,453,091
 
$4,458,560
 
$5,509,485
 
If none, please provide a more appropriate estimate in the adjoining box
 
 
 
 
In your opinion, which of the following numerical estimates best indicates the overall cost that has been expended (in present-value terms) on your building for the Initial retrofitting, Maintenance and Utilities (i.e Electricity and Gas) over the last 25-year period of its life?
 
$4,265,878
 
$4,475,246
 
$4,692,458
 
$4,760,217
 
$5,804,094
 
If none, please provide a more appropriate estimate in the adjoining box
 
 
 
 
Given the option selected does the sum of $2,219,434 provide a fair estimate of the capital cost of your building?
 
Yes
 
If No, please provide a more representative estimate in the adjoining box
 
 
 
 
Given the option selected, does the sum of $10,360 provide a fair estimate of the Annual Maintenance cost of your building?
 
Yes
 
If No, please provide a more representative estimate in the adjoining box
 
 
 
 
Given the option selected, does the sum of $63,851 provide a fair estimate of the annual cost for Electrical and Gas Energy Usage for your building?
 
Yes
 
If No, please provide a more representative estimate in the adjoining box
 
 
 
 
Could you please indicate the number of years since your building has been retrofitted to comply with the selected building configuration permutation to the nearest 5-year period?
Please select the earlier year if in-between ranges
 
5
 
10
 
15
 
20
 
25
 
Other
 
 
 
 
In your opinion, which of the following numerical estimates best indicates the overall cost that has been expended (in present-value terms) on your building for the Initial retrofitting, Maintenance and Utilities (i.e Electricity and Gas) over the last 5-year period of its life?
 
$2,528,887
 
$2,529,708
 
$2,545,263
 
$2,581,262
 
$2,651,225
 
If none, please provide a more appropriate estimate in the adjoining box
 
 
 
 
In your opinion, which of the following numerical estimates best indicates the overall cost that has been expended (in present-value terms) on your building for the Initial retrofitting, Maintenance and Utilities (i.e Electricity and Gas) over the last 10-year period of its life?
 
$2,558,913
 
$2,571,563
 
$2,587,067
 
$2,600,146
 
$2,841,485
 
If none, please provide a more appropriate estimate in the adjoining box
 
 
 
 
In your opinion, which of the following numerical estimates best indicates the overall cost that has been expended (in present-value terms) on your building for the Initial retrofitting, Maintenance and Utilities (i.e Electricity and Gas) over the last 15-year period of its life?
 
$2,519,075
 
$2,614,477
 
$2,641,434
 
$2,650,196
 
$3,043,425
 
If none, please provide a more appropriate estimate in the adjoining box
 
 
 
 
In your opinion, which of the following numerical estimates best indicates the overall cost that has been expended (in present-value terms) on your building for the Initial retrofitting, Maintenance and Utilities (i.e Electricity and Gas) over the last 20-year period of its life?
 
$2,505,096
 
$2,595,495
 
$2,621,005
 
$2,624,773
 
$3,348,912
 
If none, please provide a more appropriate estimate in the adjoining box
 
 
 
 
In your opinion, which of the following numerical estimates best indicates the overall cost that has been expended (in present-value terms) on your building for the Initial retrofitting, Maintenance and Utilities (i.e Electricity and Gas) over the last 25-year period of its life?
 
$2,513,660
 
$2,669,386
 
$3,402,004
 
$3,499,466
 
$3,657,769
 
If none, please provide a more appropriate estimate in the adjoining box
 
 
 
 
Given the option selected does the sum of $2,960,843 provide a fair estimate of the capital cost of the retrofitting carried out in your building?
 
Yes
 
If No, please provide a more representative estimate in the adjoining box
 
 
 
 
Given the option selected, does the sum of $10,360 provide a fair estimate of the Annual Maintenance cost of your building?
 
Yes
 
If No, please provide a more representative estimate in the adjoining box
 
 
 
 
Given the option selected, does the sum of $54,388 provide a fair estimate of the annual cost for Electrical and Gas Energy Usage for your building?
 
Yes
 
If No, please provide a more representative estimate in the adjoining box
 
 
 
 
Could you please indicate the number of years since your building has been retrofitted to comply with the selected building configuration permutation to the nearest 5-year period?
Please select the earlier year if in-between ranges
 
5
 
10
 
15
 
20
 
25
 
Other
 
 
 
 
In your opinion, which of the following numerical estimates best indicates the overall cost that has been expended (in present-value terms) on your building for the Initial retrofitting, Maintenance and Utilities (i.e Electricity and Gas) over the last 5-year period of its life?
 
$3,230,836
 
$3,231,552
 
$3,245,124
 
$3,276,533
 
$3,337,574
 
If none, please provide a more appropriate estimate in the adjoining box
 
 
 
 
In your opinion, which of the following numerical estimates best indicates the overall cost that has been expended (in present-value terms) on your building for the Initial retrofitting, Maintenance and Utilities (i.e Electricity and Gas) over the last 10-year period of its life?
 
$3,245,509
 
$3,256,117
 
$3,269,117
 
$3,280,084
 
$3,482,457
 
If none, please provide a more appropriate estimate in the adjoining box
 
 
 
 
In your opinion, which of the following numerical estimates best indicates the overall cost that has been expended (in present-value terms) on your building for the Initial retrofitting, Maintenance and Utilities (i.e Electricity and Gas) over the last 15-year period of its life?
 
$3,201,713
 
$3,278,403
 
$3,300,073
 
$3,307,117
 
$3,623,218
 
If none, please provide a more appropriate estimate in the adjoining box
 
 
 
 
In your opinion, which of the following numerical estimates best indicates the overall cost that has been expended (in present-value terms) on your building for the Initial retrofitting, Maintenance and Utilities (i.e Electricity and Gas) over the last 20-year period of its life?
 
$3,190,476
 
$3,263,144
 
$3,283,650
 
$3,286,680
 
$3,868,787
 
If none, please provide a more appropriate estimate in the adjoining box
 
 
 
 
In your opinion, which of the following numerical estimates best indicates the overall cost that has been expended (in present-value terms) on your building for the Initial retrofitting, Maintenance and Utilities (i.e Electricity and Gas) over the last 25-year period of its life?
 
$3,201,975
 
$3,329,600
 
$4,035,865
 
$4,124,463
 
$4,139,627
 
If none, please provide a more appropriate estimate in the adjoining box
 
 
 
 
Given the option selected does the sum of $2,363,886 provide a fair estimate of the capital cost of the retrofitting carried out in your building?
 
Yes
 
If No, please provide a more representative estimate in the adjoining box
 
 
 
 
Given the option selected. does the sum of $5,806 provide a fair estimate of the Annual Maintenance cost of your building?
 
Yes
 
If No, please provide a more representative estimate in the adjoining box
 
 
 
 
Given the option selected, does the sum of $53,484 provide a fair estimate of the annual cost for Electrical and Gas Energy Usage for your building?
 
Yes
 
If No, please provide a more representative estimate in the adjoining box
 
 
 
 
Could you please indicate the number of years since your building has been retrofitted to comply with the selected building configuration permutation to the nearest 5-year period?
Please select the earlier year if in-between ranges
 
5
 
10
 
15
 
20
 
25
 
Other
 
 
 
 
In your opinion, which of the following numerical estimates best indicates the overall cost that has been expended (in present-value terms) on your building for the Initial retrofitting, Maintenance and Utilities (i.e Electricity and Gas) over the last 5-year period of its life?
 
$2,611,121
 
$2,611,777
 
$2,624,204
 
$2,652,965
 
$2,708,862
 
If none, please provide a more appropriate estimate in the adjoining box
 
 
 
 
In your opinion, which of the following numerical estimates best indicates the overall cost that has been expended (in present-value terms) on your building for the Initial retrofitting, Maintenance and Utilities (i.e Electricity and Gas) over the last 10-year period of its life?
 
$2,612,536
 
$2,621,802
 
$2,633,157
 
$2,642,737
 
$2,819,505
 
If none, please provide a more appropriate estimate in the adjoining box
 
 
 
 
In your opinion, which of the following numerical estimates best indicates the overall cost that has been expended (in present-value terms) on your building for the Initial retrofitting, Maintenance and Utilities (i.e Electricity and Gas) over the last 15-year period of its life?
 
$2,567,255
 
$2,632,005
 
$2,650,301
 
$2,656,248
 
$2,923,136
 
If none, please provide a more appropriate estimate in the adjoining box
 
 
 
 
In your opinion, which of the following numerical estimates best indicates the overall cost that has been expended (in present-value terms) on your building for the Initial retrofitting, Maintenance and Utilities (i.e Electricity and Gas) over the last 20-year period of its life?
 
$2,557,767
 
$2,619,122
 
$2,636,436
 
$2,638,993
 
$3,130,473
 
If none, please provide a more appropriate estimate in the adjoining box
 
 
 
 
In your opinion, which of the following numerical estimates best indicates the overall cost that has been expended (in present-value terms) on your building for the Initial retrofitting, Maintenance and Utilities (i.e Electricity and Gas) over the last 25-year period of its life?
 
$2,569,475
 
$2,678,288
 
$3,385,070
 
$3,469,231
 
$3,668,916
 
If none, please provide a more appropriate estimate in the adjoining box
 
 
 
 
Given the option selected does the sum of $2,219,434 provide a fair estimate of the capital cost of the retrofitting carried out in your building?
 
Yes
 
If No, please provide a more representative estimate in the adjoining box
 
 
 
 
Given the option selected, does the sum of $10,360 provide a fair estimate of the Annual Maintenance cost of your building?
 
Yes
 
If No, please provide a more representative estimate in the adjoining box
 
 
 
 
Given the option selected, does the sum of $61,348 provide a fair estimate of the annual cost for Electrical and Gas Energy Usage for your building?
 
Yes
 
If No, please provide a more representative estimate in the adjoining box
 
 
 
 
Could you please indicate the number of years since your building has been retrofitted to comply with the selected building configuration permutation to the nearest 5-year period?
Please select the earlier year if in-between ranges
 
5
 
10
 
15
 
20
 
25
 
Other
 
 
 
 
In your opinion, which of the following numerical estimates best indicates the overall cost that has been expended (in present-value terms) on your building for the Initial retrofitting, Maintenance and Utilities (i.e Electricity and Gas) over the last 5-year period of its life?
 
$2,518,451
 
$2,519,244
 
$2,534,275
 
$2,569,060
 
$2,636,663
 
If none, please provide a more appropriate estimate in the adjoining box
 
 
 
 
In your opinion, which of the following numerical estimates best indicates the overall cost that has been expended (in present-value terms) on your building for the Initial retrofitting, Maintenance and Utilities (i.e Electricity and Gas) over the last 10-year period of its life?
 
$2,544,417
 
$2,556,527
 
$2,571,369
 
$2,583,889
 
$2,814,923
 
If none, please provide a more appropriate estimate in the adjoining box
 
 
 
 
In your opinion, which of the following numerical estimates best indicates the overall cost that has been expended (in present-value terms) on your building for the Initial retrofitting, Maintenance and Utilities (i.e Electricity and Gas) over the last 15-year period of its life?
 
$2,503,532
 
$2,593,986
 
$2,619,545
 
$2,627,852
 
$3,000,684
 
If none, please provide a more appropriate estimate in the adjoining box
 
 
 
 
In your opinion, which of the following numerical estimates best indicates the overall cost that has been expended (in present-value terms) on your building for the Initial retrofitting, Maintenance and Utilities (i.e Electricity and Gas) over the last 20-year period of its life?
 
$2,490,279
 
$2,575,988
 
$2,600,175
 
$2,603,748
 
$3,290,325
 
If none, please provide a more appropriate estimate in the adjoining box
 
 
 
 
In your opinion, which of the following numerical estimates best indicates the overall cost that has been expended (in present-value terms) on your building for the Initial retrofitting, Maintenance and Utilities (i.e Electricity and Gas) over the last 25-year period of its life?
 
$2,499,619
 
$2,647,913
 
$3,373,561
 
$3,468,679
 
$3,589,128
 
If none, please provide a more appropriate estimate in the adjoining box
 
 
 
 
Given the option selected does the sum of $2,219,434 provide a fair estimate of the capital cost of the retrofitting carried out in your building?
 
Yes
 
If No, please provide a more representative estimate in the adjoining box
 
 
 
 
Given the option selected. does the sum of $10,360 provide a fair estimate of the Annual Maintenance cost of your building?
 
Yes
 
If No, please provide a more representative estimate in the adjoining box
 
 
 
 
Given the option selected, does the sum of $63,851 provide a fair estimate of the annual cost for Electrical and Gas Energy Usage for your building?
 
Yes
 
If No, please provide a more representative estimate in the adjoining box
 
 
 
 
Could you please indicate the number of years since your building has been retrofitted to comply with the selected building configuration permutation to the nearest 5-year period?
Please select the earlier year if in-between ranges
 
5
 
10
 
15
 
20
 
25
 
Other
 
 
 
 
In your opinion, which of the following numerical estimates best indicates the overall cost that has been expended (in present-value terms) on your building for the Initial retrofitting, Maintenance and Utilities (i.e Electricity and Gas) over the last 5-year period of its life?
 
$2,528,887
 
$2,529,708
 
$2,545,263
 
$2,581,262
 
$2,651,225
 
If none, please provide a more appropriate estimate in the adjoining box
 
 
 
 
In your opinion, which of the following numerical estimates best indicates the overall cost that has been expended (in present-value terms) on your building for the Initial retrofitting, Maintenance and Utilities (i.e Electricity and Gas) over the last 10-year period of its life?
 
$2,558,913
 
$2,571,563
 
$2,587,067
 
$2,600,146
 
$2,841,485
 
If none, please provide a more appropriate estimate in the adjoining box
 
 
 
 
In your opinion, which of the following numerical estimates best indicates the overall cost that has been expended (in present-value terms) on your building for the Initial retrofitting, Maintenance and Utilities (i.e Electricity and Gas) over the last 15-year period of its life?
 
$2,519,075
 
$2,614,477
 
$2,641,434
 
$2,650,196
 
$3,043,425
 
If none, please provide a more appropriate estimate in the adjoining box
 
 
 
 
In your opinion, which of the following numerical estimates best indicates the overall cost that has been expended (in present-value terms) on your building for the Initial retrofitting, Maintenance and Utilities (i.e Electricity and Gas) over the last 20-year period of its life?
 
$2,505,096
 
$2,595,495
 
$2,621,005
 
$2,624,773
 
$3,348,912
 
If none, please provide a more appropriate estimate in the adjoining box
 
 
 
 
In your opinion, which of the following numerical estimates best indicates the overall cost that has been expended (in present-value terms) on your building for the Initial retrofitting, Maintenance and Utilities (i.e Electricity and Gas) over the last 25-year period of its life?
 
$2,513,660
 
$2,669,386
 
$3,402,004
 
$3,499,466
 
$3,657,769
 
If none, please provide a more appropriate estimate in the adjoining box
 
 
 
 
Given the option selected does the sum of $3,179,434 provide a fair estimate of the capital cost of the retrofitting carried out in your building?
 
Yes
 
If No, please provide a more representative estimate in the adjoining box
 
 
 
 
Given the option selected. does the sum of $10,360 provide a fair estimate of the Annual Maintenance cost of your building?
 
Yes
 
If No, please provide a more representative estimate in the adjoining box
 
 
 
 
Given the option selected, does the sum of $58,429 provide a fair estimate of the annual cost for Electrical and Gas Energy Usage for your building?
 
Yes
 
If No, please provide a more representative estimate in the adjoining box
 
 
 
 
Could you please indicate the number of years since your building has been retrofitted to comply with the selected building configuration permutation to the nearest 5-year period?
Please select the earlier year if in-between ranges
 
5
 
10
 
15
 
20
 
25
 
Other
 
 
 
 
In your opinion, which of the following numerical estimates best indicates the overall cost that has been expended (in present-value terms) on your building for the Initial retrofitting, Maintenance and Utilities (i.e Electricity and Gas) over the last 5-year period of its life?
 
$3,466,278
 
$3,467,039
 
$3,481,458
 
$3,541,827
 
$3,579,678
 
If none, please provide a more appropriate estimate in the adjoining box
 
 
 
 
In your opinion, which of the following numerical estimates best indicates the overall cost that has been expended (in present-value terms) on your building for the Initial retrofitting, Maintenance and Utilities (i.e Electricity and Gas) over the last 10-year period of its life?
 
$3,487,508
 
$3,498,988
 
$3,513,057
 
$3,524,926
 
$3,743,939
 
If none, please provide a more appropriate estimate in the adjoining box
 
 
 
 
In your opinion, which of the following numerical estimates best indicates the overall cost that has been expended (in present-value terms) on your building for the Initial retrofitting, Maintenance and Utilities (i.e Electricity and Gas) over the last 15-year period of its life?
 
$3,445,402
 
$3,530,083
 
$3,554,011
 
$3,561,788
 
$3,910,827
 
If none, please provide a more appropriate estimate in the adjoining box
 
 
 
 
In your opinion, which of the following numerical estimates best indicates the overall cost that has been expended (in present-value terms) on your building for the Initial retrofitting, Maintenance and Utilities (i.e Electricity and Gas) over the last 20-year period of its life?
 
$3,432,994
 
$3,513,234
 
$3,535,877
 
$3,539,222
 
4,181,983
 
If none, please provide a more appropriate estimate in the adjoining box
 
 
 
 
In your opinion, which of the following numerical estimates best indicates the overall cost that has been expended (in present-value terms) on your building for the Initial retrofitting, Maintenance and Utilities (i.e Electricity and Gas) over the last 25-year period of its life?
 
$3,443,240
 
$3,582,865
 
$4,300,384
 
$4,392,767
 
$4,469,058
 
If none, please provide a more appropriate estimate in the adjoining box
 
 
 
 
Given the option selected does the sum of $1,995,007 provide a fair estimate of the capital cost of the retrofitting carried out in your building?
 
Yes
 
If No, please provide a more representative estimate in the adjoining box
 
 
 
 
Given the option selected. does the sum of $8,760 provide a fair estimate of the Annual Maintenance cost of your building?
 
Yes
 
If No, please provide a more representative estimate in the adjoining box
 
 
 
 
Given the option selected, does the sum of $65,599 provide a fair estimate of the annual cost for Electrical and Gas Energy Usage for your building?
 
Yes
 
If No, please provide a more representative estimate in the adjoining box
 
 
 
 
Could you please indicate the number of years since your building has been retrofitted to comply with the selected building configuration permutation to the nearest 5-year period?
Please select the earlier year if in-between ranges
 
5
 
10
 
15
 
20
 
25
 
Other
 
 
 
 
In your opinion, which of the following numerical estimates best indicates the overall cost that has been expended (in present-value terms) on your building for the Initial retrofitting, Maintenance and Utilities (i.e Electricity and Gas) over the last 5-year period of its life?
 
$2,305,077
 
$2,305,899
 
$2,321,485
 
$2,357,556
 
$2,427,658
 
If none, please provide a more appropriate estimate in the adjoining box
 
 
 
 
In your opinion, which of the following numerical estimates best indicates the overall cost that has been expended (in present-value terms) on your building for the Initial retrofitting, Maintenance and Utilities (i.e Electricity and Gas) over the last 10-year period of its life?
 
$2,333,796
 
$2,346,421
 
$2,361,892
 
$2,374,945
 
$2,615,794
 
If none, please provide a more appropriate estimate in the adjoining box
 
 
 
 
In your opinion, which of the following numerical estimates best indicates the overall cost that has been expended (in present-value terms) on your building for the Initial retrofitting, Maintenance and Utilities (i.e Electricity and Gas) over the last 15-year period of its life?
 
$2,294,300
 
$2,389,592
 
$2,416,518
 
$2,425,269
 
$2,818,042
 
If none, please provide a more appropriate estimate in the adjoining box
 
 
 
 
In your opinion, which of the following numerical estimates best indicates the overall cost that has been expended (in present-value terms) on your building for the Initial retrofitting, Maintenance and Utilities (i.e Electricity and Gas) over the last 20-year period of its life?
 
$2,280,338
 
$2,370,631
 
$2,396,112
 
$2,399,876
 
$3,123,174
 
If none, please provide a more appropriate estimate in the adjoining box
 
 
 
 
In your opinion, which of the following numerical estimates best indicates the overall cost that has been expended (in present-value terms) on your building for the Initial retrofitting, Maintenance and Utilities (i.e Electricity and Gas) over the last 25-year period of its life?
 
$2,288,334
 
$2,443,585
 
$3,182,135
 
$3,279,973
 
$3,428,948
 
If none, please provide a more appropriate estimate in the adjoining box
 
 
 
 
Given the option selected does the sum of $3,920,843 provide a fair estimate of the capital cost of the retrofitting carried out in your building?
 
Yes
 
If No, please provide a more representative estimate in the adjoining box
 
 
 
 
Given the option selected. does the sum of $10,360 provide a fair estimate of the Annual Maintenance cost of your building?
 
Yes
 
If No, please provide a more representative estimate in the adjoining box
 
 
 
 
Given the option selected, does the sum of $58,429 provide a fair estimate of the annual cost for Electrical and Gas Energy Usage for your building?
 
Yes
 
If No, please provide a more representative estimate in the adjoining box
 
 
 
 
Could you please indicate the number of years since your building has been retrofitted to comply with the selected building configuration permutation to the nearest 5-year period?
Please select the earlier year if in-between ranges
 
5
 
10
 
15
 
20
 
25
 
Other
 
 
 
 
In your opinion, which of the following numerical estimates best indicates the overall cost that has been expended (in present-value terms) on your building for the Initial retrofitting, Maintenance and Utilities (i.e Electricity and Gas) over the last 5-year period of its life?
 
$4,207,687
 
$4,208,448
 
$4,222,867
 
$4,256,236
 
$4,321,087
 
If none, please provide a more appropriate estimate in the adjoining box
 
 
 
 
In your opinion, which of the following numerical estimates best indicates the overall cost that has been expended (in present-value terms) on your building for the Initial retrofitting, Maintenance and Utilities (i.e Electricity and Gas) over the last 10-year period of its life?
 
$4,228,917
 
$4,240,397
 
$4,254,466
 
$4,266,335
 
$4,485,348
 
If none, please provide a more appropriate estimate in the adjoining box
 
 
 
 
In your opinion, which of the following numerical estimates best indicates the overall cost that has been expended (in present-value terms) on your building for the Initial retrofitting, Maintenance and Utilities (i.e Electricity and Gas) over the last 15-year period of its life?
 
$4,186,811
 
$4,271,492
 
$4,295,420
 
$4.303,197
 
$4,652,236
 
If none, please provide a more appropriate estimate in the adjoining box
 
 
 
 
In your opinion, which of the following numerical estimates best indicates the overall cost that has been expended (in present-value terms) on your building for the Initial retrofitting, Maintenance and Utilities (i.e Electricity and Gas) over the last 20-year period of its life?
 
$4,174,403
 
$4,254,643
 
$4,277,286
 
$4,280,631
 
$4,923,392
 
If none, please provide a more appropriate estimate in the adjoining box
 
 
 
 
In your opinion, which of the following numerical estimates best indicates the overall cost that has been expended (in present-value terms) on your building for the Initial retrofitting, Maintenance and Utilities (i.e Electricity and Gas) over the last 25-year period of its life?
 
$4,184,649
 
$4,324,274
 
$5,041,792
 
$5,134,176
 
$5,210,467
 
If none, please provide a more appropriate estimate in the adjoining box
 
 
 
 
Given the option selected does the sum of $2,554,756 provide a fair estimate of the capital cost of the retrofitting carried out in your building?
 
Yes
 
If No, please provide a more representative estimate in the adjoining box
 
 
 
 
Given the option selected. does the sum of $5,806 provide a fair estimate of the Annual Maintenance cost of your building?
 
Yes
 
If No, please provide a more representative estimate in the adjoining box
 
 
 
 
Given the option selected, does the sum of $63,799 provide a fair estimate of the annual cost for Electrical and Gas Energy Usage for your building?
 
Yes
 
If No, please provide a more representative estimate in the adjoining box
 
 
 
 
Could you please indicate the number of years since your building has been retrofitted to comply with the selected building configuration permutation to the nearest 5-year period?
Please select the earlier year if in-between ranges
 
5
 
10
 
15
 
20
 
25
 
Other
 
 
 
 
In your opinion, which of the following numerical estimates best indicates the overall cost that has been expended (in present-value terms) on your building for the Initial retrofitting, Maintenance and Utilities (i.e Electricity and Gas) over the last 5-year period of its life?
 
$2,845,001
 
$2,845,771
 
$2,860,361
 
$2,894,126
 
$2,959,746
 
If none, please provide a more appropriate estimate in the adjoining box
 
 
 
 
In your opinion, which of the following numerical estimates best indicates the overall cost that has been expended (in present-value terms) on your building for the Initial retrofitting, Maintenance and Utilities (i.e Electricity and Gas) over the last 10-year period of its life?
 
$2,863,152
 
$2,874,644
 
$2,888,727
 
$2,900,609
 
$3,119,850
 
If none, please provide a more appropriate estimate in the adjoining box
 
 
 
 
In your opinion, which of the following numerical estimates best indicates the overall cost that has been expended (in present-value terms) on your building for the Initial retrofitting, Maintenance and Utilities (I.e Electricity and Gas) over the last 15-year period of its life?
 
$2,822,185
 
$2,907,331
 
$2,931,390
 
$2,939,210
 
$3,290,166
 
If none, please provide a more appropriate estimate in the adjoining box
 
 
 
 
In your opinion, which of the following numerical estimates best indicates the overall cost that has been expended (in present-value terms) on your building for the Initial retrofitting, Maintenance and Utilities (i.e Electricity and Gas) over the last 20-year period of its life?
 
$2,809,709
 
$2,890,389
 
$2,913,157
 
$2,916,520
 
$3,562,811
 
If none, please provide a more appropriate estimate in the adjoining box
 
 
 
 
In your opinion, which of the following numerical estimates best indicates the overall cost that has been expended (in present-value terms) on your building for the Initial retrofitting, Maintenance and Utilities (i.e Electricity and Gas) over the last 25-year period of its life?
 
$2,818,217
 
$2,957,660
 
$3,693,166
 
$3,786,988
 
$3,842,695
 
If none, please provide a more appropriate estimate in the adjoining box
 
 
 
 
Given the option selected does the sum of $2,131,887 provide a fair estimate of the capital cost of the retrofitting carried out in your building?
 
Yes
 
If No, please provide a more representative estimate in the adjoining box
 
 
 
 
Given the option selected. does the sum of $10,360 provide a fair estimate of the Annual Maintenance cost of your building?
 
Yes
 
If No, please provide a more representative estimate in the adjoining box
 
 
 
 
Given the option selected, does the sum of $74,165 provide a fair estimate of the annual cost for Electrical and Gas Energy Usage for your building?
 
Yes
 
If No, please provide a more representative estimate in the adjoining box
 
 
 
 
Could you please indicate the number of years since your building has been retrofitted to comply with the selected building configuration permutation to the nearest 5-year period?
Please select the earlier year if in-between ranges
 
5
 
10
 
15
 
20
 
25
 
Other
 
 
 
 
In your opinion, which of the following numerical estimates best indicates the overall cost that has been expended (in present-value terms) on your building for the Initial retrofitting, Maintenance and Utilities (i.e Electricity and Gas) over the last 5-year period of its life?
 
$2,484,350
 
$2,485,285
 
$2,503,003
 
$2,544,005
 
$2,623,692
 
If none, please provide a more appropriate estimate in the adjoining box
 
 
 
 
In your opinion, which of the following numerical estimates best indicates the overall cost that has been expended (in present-value terms) on your building for the Initial retrofitting, Maintenance and Utilities (i.e Electricity and Gas) over the last 10-year period of its life?
 
$2,531,112
 
$2,545,988
 
$2,564,220
 
$2,579,601
 
$2,863,414
 
If none, please provide a more appropriate estimate in the adjoining box
 
 
 
 
In your opinion, which of the following numerical estimates best indicates the overall cost that has been expended (in present-value terms) on your building for the Initial retrofitting, Maintenance and Utilities (i.e Electricity and Gas) over the last 15-year period of its life?
 
$2,495,588
 
$2,611,386
 
$2,644,106
 
$2,654,741
 
$3,132,038
 
If none, please provide a more appropriate estimate in the adjoining box
 
 
 
 
In your opinion, which of the following numerical estimates best indicates the overall cost that has been expended (in present-value terms) on your building for the Initial retrofitting, Maintenance and Utilities (i.e Electricity and Gas) over the last 20-year period of its life?
 
$2,478,620
 
$2,588,345
 
$2,619,309
 
$2,623,883
 
$3,502,833
 
If none, please provide a more appropriate estimate in the adjoining box
 
 
 
 
In your opinion, which of the following numerical estimates best indicates the overall cost that has been expended (in present-value terms) on your building for the Initial retrofitting, Maintenance and Utilities (i.e Electricity and Gas) over the last 25-year period of its life?
 
$2,483,985
 
$2,670,341
 
$3,431,683
 
$3,538,806
 
$3,853,131
 
If none, please provide a more appropriate estimate in the adjoining box
 
 
 
 
Given the option selected does the sum of $2,839,203 provide a fair estimate of the capital cost of the retrofitting carried out in your building?
 
Yes
 
If No, please provide a more representative estimate in the adjoining box
 
 
 
 
Given the option selected. does the sum of $10,360 provide a fair estimate of the Annual Maintenance cost of your building?
 
Yes
 
If No, please provide a more representative estimate in the adjoining box
 
 
 
 
Given the option selected, does the sum of $61,416 provide a fair estimate of the annual cost for Electrical and Gas Energy Usage for your building?
 
Yes
 
If No, please provide a more representative estimate in the adjoining box
 
 
 
 
Could you please indicate the number of years since your building has been retrofitted to comply with the selected building configuration permutation to the nearest 5-year period?
Please select the earlier year if in-between ranges
 
5
 
10
 
15
 
20
 
25
 
Other
 
 
 
 
In your opinion, which of the following numerical estimates best indicates the overall cost that has been expended (in present-value terms) on your building for the Initial retrofitting, Maintenance and Utilities (i.e Electricity and Gas) over the last 5-year period of its life?
 
$3,138,505
 
$3,139,299
 
$3,154,344
 
$3,189,162
 
$3,256,830
 
If none, please provide a more appropriate estimate in the adjoining box
 
 
 
 
In your opinion, which of the following numerical estimates best indicates the overall cost that has been expended (in present-value terms) on your building for the Initial retrofitting, Maintenance and Utilities (i.e Electricity and Gas) over the last 10-year period of its life?
 
$3,164,581
 
$3,176,706
 
$3,191,566
 
$3,204,101
 
$3,435,416
 
If none, please provide a more appropriate estimate in the adjoining box
 
 
 
 
In your opinion, which of the following numerical estimates best indicates the overall cost that has been expended (in present-value terms) on your building for the Initial retrofitting, Maintenance and Utilities (i.e Electricity and Gas) over the last 15-year period of its life?
 
$3,123,725
 
$3,214,314
 
$3,239,910
 
$3,248,230
 
$3,621,617
 
If none, please provide a more appropriate estimate in the adjoining box
 
 
 
 
In your opinion, which of the following numerical estimates best indicates the overall cost that has been expended (in present-value terms) on your building for the Initial retrofitting, Maintenance and Utilities (i.e Electricity and Gas) over the last 20-year period of its life?
 
$3,110,452
 
$3,196,289
 
$3,220,512
 
$3,224,090
 
$3,911,689
 
If none, please provide a more appropriate estimate in the adjoining box
 
 
 
 
In your opinion, which of the following numerical estimates best indicates the overall cost that has been expended (in present-value terms) on your building for the Initial retrofitting, Maintenance and Utilities (i.e Electricity and Gas) over the last 25-year period of its life?
 
$3,119,771
 
$3,268,267
 
$3,994,105
 
$4,089,287
 
$4,210,766
 
If none, please provide a more appropriate estimate in the adjoining box
 
 
 
 
Given the option selected does the sum of $2,715,755 provide a fair estimate of the capital cost of the retrofitting carried out in your building?
 
Yes
 
If No, please provide a more representative estimate in the adjoining box
 
 
 
 
Given the option selected. does the sum of $10,360 provide a fair estimate of the Annual Maintenance cost of your building?
 
Yes
 
If No, please provide a more representative estimate in the adjoining box
 
 
 
 
Given the option selected, does the sum of $56,291 provide a fair estimate of the annual cost for Electrical and Gas Energy Usage for your building?
 
Yes
 
If No, please provide a more representative estimate in the adjoining box
 
 
 
 
Could you please indicate the number of years since your building has been retrofitted to comply with the selected building configuration permutation to the nearest 5-year period?
Please select the earlier year if in-between ranges
 
5
 
10
 
15
 
20
 
25
 
Other
 
 
 
 
In your opinion, which of the following numerical estimates best indicates the overall cost that has been expended (in present-value terms) on your building for the Initial retrofitting, Maintenance and Utilities (i.e Electricity and Gas) over the last 5-year period of its life?
 
$2,993,687
 
$2,994,424
 
$3,008,395
 
$3,040,727
 
$3,103,563
 
If none, please provide a more appropriate estimate in the adjoining box
 
 
 
 
In your opinion, which of the following numerical estimates best indicates the overall cost that has been expended (in present-value terms) on your building for the Initial retrofitting, Maintenance and Utilities (i.e Electricity and Gas) over the last 10-year period of its life?
 
$3,104,592
 
$3,119,082
 
$3,136,839
 
$3,151,820
 
$3,428,248
 
If none, please provide a more appropriate estimate in the adjoining box
 
 
 
 
In your opinion, which of the following numerical estimates best indicates the overall cost that has been expended (in present-value terms) on your building for the Initial retrofitting, Maintenance and Utilities (i.e Electricity and Gas) over the last 15-year period of its life?
 
$3,125,667
 
$3,256,179
 
$3,293,056
 
$3,305,043
 
$3,842,984
 
If none, please provide a more appropriate estimate in the adjoining box
 
 
 
 
In your opinion, which of the following numerical estimates best indicates the overall cost that has been expended (in present-value terms) on your building for the Initial retrofitting, Maintenance and Utilities (i.e Electricity and Gas) over the last 20-year period of its life?
 
$3,106,544
 
$3,230,210
 
$3,265,108
 
$3,270,264
 
$4,260,892
 
If none, please provide a more appropriate estimate in the adjoining box
 
 
 
 
In your opinion, which of the following numerical estimates best indicates the overall cost that has been expended (in present-value terms) on your building for the Initial retrofitting, Maintenance and Utilities (i.e Electricity and Gas) over the last 25-year period of its life?
 
$3,091,284
 
$3,290,042
 
$3,480,473
 
$3,543,498
 
$4,551,541
 
If none, please provide a more appropriate estimate in the adjoining box
 
 
 
 
Given the option selected does the sum of $3,420,014 provide a fair estimate of the capital cost of the retrofitting carried out in your building?
 
Yes
 
If No, please provide a more representative estimate in the adjoining box
 
 
 
 
Given the option selected. does the sum of $10,360 provide a fair estimate of the Annual Maintenance cost of your building?
 
Yes
 
If No, please provide a more representative estimate in the adjoining box
 
 
 
 
Given the option selected, does the sum of $43,097 provide a fair estimate of the annual cost for Electrical and Gas Energy Usage for your building?
 
Yes
 
If No, please provide a more representative estimate in the adjoining box
 
 
 
 
Could you please indicate the number of years since your building has been retrofitted to comply with the selected building configuration permutation to the nearest 5-year period?
Please select the earlier year if in-between ranges
 
5
 
10
 
15
 
20
 
25
 
Other
 
 
 
 
In your opinion, which of the following numerical estimates best indicates the overall cost that has been expended (in present-value terms) on your building for the Initial retrofitting, Maintenance and Utilities (i.e Electricity and Gas) over the last 5-year period of its life?
 
$3,642,925
 
$3,643,516
 
$3,654,721
 
$3,680,653
 
$3,731,049
 
If none, please provide a more appropriate estimate in the adjoining box
 
 
 
 
In your opinion, which of the following numerical estimates best indicates the overall cost that has been expended (in present-value terms) on your building for the Initial retrofitting, Maintenance and Utilities (i.e Electricity and Gas) over the last 10-year period of its life?
 
$3,733,213
 
$3,744,884
 
$3,759,187
 
$3,771,253
 
$3,993,910
 
If none, please provide a more appropriate estimate in the adjoining box
 
 
 
 
In your opinion, which of the following numerical estimates best indicates the overall cost that has been expended (in present-value terms) on your building for the Initial retrofitting, Maintenance and Utilities (i.e Electricity and Gas) over the last 15-year period of its life?
 
$3,749,313
 
$3,854,158
 
$3,883,783
 
$3,893,412
 
$4,325,562
 
If none, please provide a more appropriate estimate in the adjoining box
 
 
 
 
In your opinion, which of the following numerical estimates best indicates the overall cost that has been expended (in present-value terms) on your building for the Initial retrofitting, Maintenance and Utilities (i.e Electricity and Gas) over the last 20-year period of its life?
 
$3,733,950
 
$3,833,296
 
$3,861,331
 
$3,865,473
 
$4,661,284
 
If none, please provide a more appropriate estimate in the adjoining box
 
 
 
 
In your opinion, which of the following numerical estimates best indicates the overall cost that has been expended (in present-value terms) on your building for the Initial retrofitting, Maintenance and Utilities (i.e Electricity and Gas) over the last 25-year period of its life?
 
$3,722,561
 
$3,882,691
 
$4,031,953
 
$4,082,386
 
$4,899,024
 
If none, please provide a more appropriate estimate in the adjoining box
 
 
 
 
Given the option selected does the sum of $2,860,207 provide a fair estimate of the capital cost of the retrofitting carried out in your building?
 
Yes
 
If No, please provide a more representative estimate in the adjoining box
 
 
 
 
Given the option selected. does the sum of $5,806 provide a fair estimate of the Annual Maintenance cost of your building?
 
Yes
 
If No, please provide a more representative estimate in the adjoining box
 
 
 
 
Given the option selected, does the sum of $45,925 provide a fair estimate of the annual cost for Electrical and Gas Energy Usage for your building?
 
Yes
 
If No, please provide a more representative estimate in the adjoining box
 
 
 
 
Could you please indicate the number of years since your building has been retrofitted to comply with the selected building configuration permutation to the nearest 5-year period?
Please select the earlier year if in-between ranges
 
5
 
10
 
15
 
20
 
25
 
Other
 
 
 
 
In your opinion, which of the following numerical estimates best indicates the overall cost that has been expended (in present-value terms) on your building for the Initial retrofitting, Maintenance and Utilities (i.e Electricity and Gas) over the last 5-year period of its life?
 
$3,075,921
 
$3,076,493
 
$3,087,336
 
$3,112,430
 
$3,161,200
 
If none, please provide a more appropriate estimate in the adjoining box
 
 
 
 
In your opinion, which of the following numerical estimates best indicates the overall cost that has been expended (in present-value terms) on your building for the Initial retrofitting, Maintenance and Utilities (i.e Electricity and Gas) over the last 10-year period of its life?
 
$3,158,215
 
$3,169,320
 
$3,182,930
 
$3,194,411
 
$3,406,268
 
If none, please provide a more appropriate estimate in the adjoining box
 
 
 
 
In your opinion, which of the following numerical estimates best indicates the overall cost that has been expended (in present-value terms) on your building for the Initial retrofitting, Maintenance and Utilities (i.e Electricity and Gas) over the last 15-year period of its life?
 
$3,173,847
 
$3,273,707
 
$3,301,923
 
$3,311,095
 
$3,722,695
 
If none, please provide a more appropriate estimate in the adjoining box
 
 
 
 
In your opinion, which of the following numerical estimates best indicates the overall cost that has been expended (in present-value terms) on your building for the Initial retrofitting, Maintenance and Utilities (i.e Electricity and Gas) over the last 20-year period of its life?
 
$3,159,215
 
$3,253,837
 
$3,280,539
 
$3,284,484
 
$4,042,453
 
If none, please provide a more appropriate estimate in the adjoining box
 
 
 
 
In your opinion, which of the following numerical estimates best indicates the overall cost that has been expended (in present-value terms) on your building for the Initial retrofitting, Maintenance and Utilities (i.e Electricity and Gas) over the last 25-year period of its life?
 
$3,147,099
 
$3,298,943
 
$3,463,539
 
$3,513,263
 
$4,262,688
 
If none, please provide a more appropriate estimate in the adjoining box
 
 
 
 
Given the option selected does the sum of $2,719,567 provide a fair estimate of the capital cost of the retrofitting carried out in your building?
 
Yes
 
If No, please provide a more representative estimate in the adjoining box
 
 
 
 
Given the option selected. does the sum of $10,360 provide a fair estimate of the Annual Maintenance cost of your building?
 
Yes
 
If No, please provide a more representative estimate in the adjoining box
 
 
 
 
Given the option selected, does the sum of $47,849 provide a fair estimate of the annual cost for Electrical and Gas Energy Usage for your building?
 
Yes
 
If No, please provide a more representative estimate in the adjoining box
 
 
 
 
Could you please indicate the number of years since your building has been retrofitted to comply with the selected building configuration permutation to the nearest 5-year period?
Please select the earlier year if in-between ranges
 
5
 
10
 
15
 
20
 
25
 
Other
 
 
 
 
In your opinion, which of the following numerical estimates best indicates the overall cost that has been expended (in present-value terms) on your building for the Initial retrofitting, Maintenance and Utilities (i.e Electricity and Gas) over the last 5-year period of its life?
 
$2,962,296
 
$2,962,939
 
$2,975,141
 
$3,003,378
 
$3,058,255
 
If none, please provide a more appropriate estimate in the adjoining box
 
 
 
 
In your opinion, which of the following numerical estimates best indicates the overall cost that has been expended (in present-value terms) on your building for the Initial retrofitting, Maintenance and Utilities (i.e Electricity and Gas) over the last 10-year period of its life?
 
$3,059,283
 
$3,071,943
 
$3,087,457
 
$3,100,545
 
$3,342,053
 
If none, please provide a more appropriate estimate in the adjoining box
 
 
 
 
In your opinion, which of the following numerical estimates best indicates the overall cost that has been expended (in present-value terms) on your building for the Initial retrofitting, Maintenance and Utilities (i.e Electricity and Gas) over the last 15-year period of its life?
 
$3,076,675
 
$3,190,375
 
$3,222,502
 
$3,232,944
 
$3,701,589
 
If none, please provide a more appropriate estimate in the adjoining box
 
 
 
 
In your opinion, which of the following numerical estimates best indicates the overall cost that has been expended (in present-value terms) on your building for the Initial retrofitting, Maintenance and Utilities (i.e Electricity and Gas) over the last 20-year period of its life?
 
$3,060,016
 
$3,167,751
 
$3,198,154
 
$3,202,645
 
$4,065,664
 
If none, please provide a more appropriate estimate in the adjoining box
 
 
 
 
In your opinion, which of the following numerical estimates best indicates the overall cost that has been expended (in present-value terms) on your building for the Initial retrofitting, Maintenance and Utilities (i.e Electricity and Gas) over the last 25-year period of its life?
 
$3,047,436
 
$3,220,969
 
$3,389,126
 
$3,444,308
 
$4,322,367
 
If none, please provide a more appropriate estimate in the adjoining box
 
 
 
 
Given the option selected does the sum of $2,715,755 provide a fair estimate of the capital cost of the retrofitting carried out in your building?
 
Yes
 
If No, please provide a more representative estimate in the adjoining box
 
 
 
 
Given the option selected. does the sum of $10,360 provide a fair estimate of the Annual Maintenance cost of your building?
 
Yes
 
If No, please provide a more representative estimate in the adjoining box
 
 
 
 
Given the option selected, does the sum of $56,291 provide a fair estimate of the annual cost for Electrical and Gas Energy Usage for your building?
 
Yes
 
If No, please provide a more representative estimate in the adjoining box
 
 
 
 
Could you please indicate the number of years since your building has been retrofitted to comply with the selected building configuration permutation to the nearest 5-year period?
Please select the earlier year if in-between ranges
 
5
 
10
 
15
 
20
 
25
 
Other
 
 
 
 
In your opinion, which of the following numerical estimates best indicates the overall cost that has been expended (in present-value terms) on your building for the Initial retrofitted, Maintenance and Utilities (i.e Electricity and Gas) over the last 5-year period of its life?
 
$2,993,687
 
$2,994,424
 
$3,008,395
 
$3,040,727
 
$3,103,563
 
If none, please provide a more appropriate estimate in the adjoining box
 
 
 
 
In your opinion, which of the following numerical estimates best indicates the overall cost that has been expended (in present-value terms) on your building for the Initial retrofitted, Maintenance and Utilities (i.e Electricity and Gas) over the last 10-year period of its life?
 
$3,104,592
 
$3,119,082
 
$3,136,839
 
$3,151,820
 
$3,428,248
 
If none, please provide a more appropriate estimate in the adjoining box
 
 
 
 
In your opinion, which of the following numerical estimates best indicates the overall cost that has been expended (in present-value terms) on your building for the Initial retrofitting, Maintenance and Utilities (i.e Electricity and Gas) over the last 15-year period of its life?
 
$3,125,667
 
$3,256,179
 
$3,293,056
 
$3,305,043
 
$3,842,984
 
If none, please provide a more appropriate estimate in the adjoining box
 
 
 
 
In your opinion, which of the following numerical estimates best indicates the overall cost that has been expended (in present-value terms) on your building for the Initial retrofitting, Maintenance and Utilities (i.e Electricity and Gas) over the last 20-year period of its life?
 
$3,106,544
 
$3,230,210
 
$3,265,108
 
$3,270,264
 
$4,260,892
 
If none, please provide a more appropriate estimate in the adjoining box
 
 
 
 
In your opinion, which of the following numerical estimates best indicates the overall cost that has been expended (in present-value terms) on your building for the Initial retrofitting, Maintenance and Utilities (i.e Electricity and Gas) over the last 25-year period of its life?
 
$3,091,284
 
$3,290,042
 
$3,480,473
 
$3,543,498
 
$4,551,541
 
If none, please provide a more appropriate estimate in the adjoining box
 
 
 
 
Given the option selected does the sum of $3,784,358 provide a fair estimate of the capital cost of the retrofitting carried out in your building?
 
Yes
 
If No, please provide a more representative estimate in the adjoining box
 
 
 
 
Given the option selected. does the sum of $10,360 provide a fair estimate of the Annual Maintenance cost of your building?
 
Yes
 
If No, please provide a more representative estimate in the adjoining box
 
 
 
 
Given the option selected, does the sum of $49,429 provide a fair estimate of the annual cost for Electrical and Gas Energy Usage for your building?
 
Yes
 
If No, please provide a more representative estimate in the adjoining box
 
 
 
 
Could you please indicate the number of years since your building has been retrofitted to comply with the selected building configuration permutation to the nearest 5-year period?
Please select the earlier year if in-between ranges
 
5
 
10
 
15
 
20
 
25
 
Other
 
 
 
 
In your opinion, which of the following numerical estimates best indicates the overall cost that has been expended (in present-value terms) on your building for the Initial retrofitting, Maintenance and Utilities (i.e Electricity and Gas) over the last 5-year period of its life?
 
$4,033,675
 
$4,034,336
 
$4,046,869
 
$4,075,872
 
$4,132,239
 
If none, please provide a more appropriate estimate in the adjoining box
 
 
 
 
In your opinion, which of the following numerical estimates best indicates the overall cost that has been expended (in present-value terms) on your building for the Initial retrofitting, Maintenance and Utilities (i.e Electricity and Gas) over the last 10-year period of its life?
 
$4,134,172
 
$4,147,207
 
$4,163,183
 
$4,176,660
 
$4,425,346
 
If none, please provide a more appropriate estimate in the adjoining box
 
 
 
 
In your opinion, which of the following numerical estimates best indicates the overall cost that has been expended (in present-value terms) on your building for the Initial retrofitting, Maintenance and Utilities (i.e Electricity and Gas) over the last 15-year period of its life?
 
$4,152,876
 
$4,270,207
 
$4,303,361
 
$4,314,137
 
$4,797,755
 
If none, please provide a more appropriate estimate in the adjoining box
 
 
 
 
In your opinion, which of the following numerical estimates best indicates the overall cost that has been expended (in present-value terms) on your building for the Initial retrofitting, Maintenance and Utilities (i.e Electricity and Gas) over the last 20-year period of its life?
 
$4,135,683
 
$4,246,861
 
$4,278,235
 
$4,282,870
 
$5,173,461
 
If none, please provide a more appropriate estimate in the adjoining box
 
 
 
 
In your opinion, which of the following numerical estimates best indicates the overall cost that has been expended (in present-value terms) on your building for the Initial retrofitting, Maintenance and Utilities (i.e Electricity and Gas) over the last 25-year period of its life?
 
$4,122,348
 
$4,301,237
 
$4,468,502
 
$4,524,886
 
$5,436,635
 
If none, please provide a more appropriate estimate in the adjoining box
 
 
 
 
Given the option selected does the sum of $4,525,767 provide a fair estimate of the capital cost of the retrofitting carried out in your building?
 
Yes
 
If No, please provide a more representative estimate in the adjoining box
 
 
 
 
Given the option selected, does the sum of $10,360 provide a fair estimate of the Annual Maintenance cost of your building?
 
Yes
 
If No, please provide a more representative estimate in the adjoining box
 
 
 
 
Given the option selected, does the sum of $49,128 provide a fair estimate of the annual cost for Electrical and Gas Energy Usage for your building?
 
Yes
 
If No, please provide a more representative estimate in the adjoining box
 
 
 
 
Could you please indicate the number of years since your building has been retrofitted to comply with the selected building configuration permutation to the nearest 5-year period?
Please select the earlier year if in-between ranges
 
5
 
10
 
15
 
20
 
25
 
Other
 
 
 
 
In your opinion, which of the following numerical estimates best indicates the overall cost that has been expended (in present-value terms) on your building for the Initial retrofitting, Maintenance and Utilities (i.e Electricity and Gas) over the last 5-year period of its life?
 
$4,773,827
 
$4,774,485
 
$4,786,954
 
$4,815,812
 
$4,871,894
 
If none, please provide a more appropriate estimate in the adjoining box
 
 
 
 
In your opinion, which of the following numerical estimates best indicates the overall cost that has been expended (in present-value terms) on your building for the Initial retrofitting, Maintenance and Utilities (i.e Electricity and Gas) over the last 10-year period of its life?
 
$4,874,370
 
$4,887,360
 
$4,903,280
 
$4,916,710
 
$5,164,536
 
If none, please provide a more appropriate estimate in the adjoining box
 
 
 
 
In your opinion, which of the following numerical estimates best indicates the overall cost that has been expended (in present-value terms) on your building for the Initial retrofitting, Maintenance and Utilities (i.e Electricity and Gas) over the last 15-year period of its life?
 
$4,893,315
 
$5,010,338
 
$5,043,404
 
$5,054,152
 
$5,536,498
 
If none, please provide a more appropriate estimate in the adjoining box
 
 
 
 
In your opinion, which of the following numerical estimates best indicates the overall cost that has been expended (in present-value terms) on your building for the Initial retrofitting, Maintenance and Utilities (i.e Electricity and Gas) over the last 20-year period of its life?
 
$4,876,168
 
$4,987,053
 
$5,018,345
 
$5,022,967
 
$5,911,216
 
If none, please provide a more appropriate estimate in the adjoining box
 
 
 
 
In your opinion, which of the following numerical estimates best indicates the overall cost that has been expended (in present-value terms) on your building for the Initial retrofitting, Maintenance and Utilities (i.e Electricity and Gas) over the last 25-year period of its life?
 
$4,862,776
 
$5,041,146
 
$5,204,582
 
$5,260,527
 
$6,173,249
 
If none, please provide a more appropriate estimate in the adjoining box
 
 
 
 
Given the option selected does the sum of $2,604,506 provide a fair estimate of the capital cost of the retrofitting carried out in your building?
 
Yes
 
If No, please provide a more representative estimate in the adjoining box
 
 
 
 
Given the option selected. does the sum of $8,760 provide a fair estimate of the Annual Maintenance cost of your building?
 
Yes
 
If No, please provide a more representative estimate in the adjoining box
 
 
 
 
Given the option selected, does the sum of $47,717 provide a fair estimate of the annual cost for Electrical and Gas Energy Usage for your building?
 
Yes
 
If No, please provide a more representative estimate in the adjoining box
 
 
 
 
Could you please indicate the number of years since your building has been retrofitted to comply with the selected building configuration permutation to the nearest 5-year period?
Please select the earlier year if in-between ranges
 
5
 
10
 
15
 
20
 
25
 
Other
 
 
 
 
In your opinion, which of the following numerical estimates best indicates the overall cost that has been expended (in present-value terms) on your building for the Initial retrofitting, Maintenance and Utilities (i.e Electricity and Gas) over the last 5-year period of its life?
 
$2,840,012
 
$2,840,637
 
$2,852,475
 
$2,879,872
 
$2,933,116
 
If none, please provide a more appropriate estimate in the adjoining box
 
 
 
 
In your opinion, which of the following numerical estimates best indicates the overall cost that has been expended (in present-value terms) on your building for the Initial retrofitting, Maintenance and Utilities (i.e Electricity and Gas) over the last 10-year period of its life?
 
$2,936,646
 
$2,949,023
 
$2,964,191
 
$2,976,988
 
$3,213,110
 
If none, please provide a more appropriate estimate in the adjoining box
 
 
 
 
In your opinion, which of the following numerical estimates best indicates the overall cost that has been expended (in present-value terms) on your building for the Initial retrofitting, Maintenance and Utilities (i.e Electricity and Gas) over the last 15-year period of its life?
 
$2,956,348
 
$3,068,371
 
$3,100,024
 
$3,110,312
 
$3,572,047
 
If none, please provide a more appropriate estimate in the adjoining box
 
 
 
 
In your opinion, which of the following numerical estimates best indicates the overall cost that has been expended (in present-value terms) on your building for the Initial retrofitting, Maintenance and Utilities (I.e Electricity and Gas) over the last 20-year period of its life?
 
$2,939,934
 
$3,046,081
 
$3,076,035
 
$3,080,460
 
$3,930,752
 
If none, please provide a more appropriate estimate in the adjoining box
 
 
 
 
In your opinion, which of the following numerical estimates best indicates the overall cost that has been expended (in present-value terms) on your building for the Initial retrofitting, Maintenance and Utilities (i.e Electricity and Gas) over the last 25-year period of its life?
 
$2,926,246
 
$3,096,534
 
$3,242,992
 
$3,295,613
 
$4,177,342
 
If none, please provide a more appropriate estimate in the adjoining box
 
 
 
 
Given the option selected does the sum of $3,564,506 provide a fair estimate of the capital cost of the retrofitting carried out in your building?
 
Yes
 
If No, please provide a more representative estimate in the adjoining box
 
 
 
 
Given the option selected, does the sum of $8,760 provide a fair estimate of the Annual Maintenance cost of your building?
 
Yes
 
If No, please provide a more representative estimate in the adjoining box
 
 
 
 
Given the option selected, does the sum of $44,390 provide a fair estimate of the annual cost for Electrical and Gas Energy Usage for your building?
 
Yes
 
If No, please provide a more representative estimate in the adjoining box
 
 
 
 
Could you please indicate the number of years since your building has been retrofitted to comply with the selected building configuration permutation to the nearest 5-year period?
Please select the earlier year if in-between ranges
 
5
 
10
 
15
 
20
 
25
 
Other
 
 
 
 
In your opinion, which of the following numerical estimates best indicates the overall cost that has been expended (in present-value terms) on your building for the Initial retrofitting, Maintenance and Utilities (i.e Electricity and Gas) over the last 5-year period of its life?
 
$3,786,139
 
$3,786,727
 
$3,797,868
 
$3,823,651
 
$3,873,758
 
If none, please provide a more appropriate estimate in the adjoining box
 
 
 
 
In your opinion, which of the following numerical estimates best indicates the overall cost that has been expended (in present-value terms) on your building for the Initial retrofitting, Maintenance and Utilities (i.e Electricity and Gas) over the last 10-year period of its life?
 
$3,877,375
 
$3,889,034
 
$3,903,322
 
$3,915,376
 
$4,137,798
 
If none, please provide a more appropriate estimate in the adjoining box
 
 
 
 
In your opinion, which of the following numerical estimates best indicates the overall cost that has been expended (in present-value terms) on your building for the Initial retrofitting, Maintenance and Utilities (i.e Electricity and Gas) over the last 15-year period of its life?
 
$3,895,685
 
$4,001,129
 
$4,030,923
 
$4,040,608
 
$4,475,225
 
If none, please provide a more appropriate estimate in the adjoining box
 
 
 
 
In your opinion, which of the following numerical estimates best indicates the overall cost that has been expended (in present-value terms) on your building for the Initial retrofitting, Maintenance and Utilities (i.e Electricity and Gas) over the last 20-year period of its life?
 
$3,880,235
 
$3,980,148
 
$4,008,343
 
$4,012,509
 
$4,812,865
 
If none, please provide a more appropriate estimate in the adjoining box
 
 
 
 
In your opinion, which of the following numerical estimates best indicates the overall cost that has been expended (in present-value terms) on your building for the Initial retrofitting, Maintenance and Utilities (i.e Electricity and Gas) over the last 25-year period of its life?
 
$3,867,579
 
$4,027,987
 
$4,165,180
 
$4,214,684
 
$5,046,088
 
If none, please provide a more appropriate estimate in the adjoining box
 
 
 
 
Given the option selected does the sum of $4,340,325 provide a fair estimate of the capital cost of the retrofitting carried out in your building?
 
Yes
 
If No, please provide a more representative estimate in the adjoining box
 
 
 
 
Given the option selected. does the sum of $8,760 provide a fair estimate of the Annual Maintenance cost of your building?
 
Yes
 
If No, please provide a more representative estimate in the adjoining box
 
 
 
 
Given the option selected, does the sum of $50,592 provide a fair estimate of the annual cost for Electrical and Gas Energy Usage for your building?
 
Yes
 
If No, please provide a more representative estimate in the adjoining box
 
 
 
 
Could you please indicate the number of years since your building has been retrofitted to comply with the selected building configuration permutation to the nearest 5-year period?
Please select the earlier year if in-between ranges
 
5
 
10
 
15
 
20
 
25
 
Other
 
 
 
 
In your opinion, which of the following numerical estimates best indicates the overall cost that has been expended (in present-value terms) on your building for the Initial retrofitting, Maintenance and Utilities (i.e Electricity and Gas) over the last 5-year period of its life?
 
$4,587,819
 
$4,588,476
 
$4,600,917
 
$4,629,708
 
$4,685,663
 
If none, please provide a more appropriate estimate in the adjoining box
 
 
 
 
In your opinion, which of the following numerical estimates best indicates the overall cost that has been expended (in present-value terms) on your building for the Initial retrofitting, Maintenance and Utilities (i.e Electricity and Gas) over the last 10-year period of its life?
 
$4,689,680
 
$4,702,699
 
$4,718,653
 
$4,732,112
 
$4,980,473
 
If none, please provide a more appropriate estimate in the adjoining box
 
 
 
 
In your opinion, which of the following numerical estimates best indicates the overall cost that has been expended (in present-value terms) on your building for the Initial retrofitting, Maintenance and Utilities (i.e Electricity and Gas) over the last 15-year period of its life?
 
$4,710,971
 
$4,828,981
 
$4,862,326
 
$4,873,164
 
$5,359,575
 
If none, please provide a more appropriate estimate in the adjoining box
 
 
 
 
In your opinion, which of the following numerical estimates best indicates the overall cost that has been expended (in present-value terms) on your building for the Initial retrofitting, Maintenance and Utilities (i.e Electricity and Gas) over the last 20-year period of its life?
 
$4,693,680
 
$4,805,500
 
$4,837,055
 
$4,841,716
 
$5,737,452
 
If none, please provide a more appropriate estimate in the adjoining box
 
 
 
 
In your opinion, which of the following numerical estimates best indicates the overall cost that has been expended (in present-value terms) on your building for the Initial retrofitting, Maintenance and Utilities (i.e Electricity and Gas) over the last 25-year period of its life?
 
$4,678,942
 
$4,858,162
 
$5,009,482
 
$5,064,631
 
$5,995,665
 
If none, please provide a more appropriate estimate in the adjoining box
 
 
 
 
Given the option selected does the sum of $4,484,777 provide a fair estimate of the capital cost of the retrofitting carried out in your building?
 
Yes
 
If No, please provide a more representative estimate in the adjoining box
 
 
 
 
Given the option selected does the sum of $4,206 provide a fair estimate of the Annual Maintenance cost of your building?
 
Yes
 
If No, please provide a more representative estimate in the adjoining box
 
 
 
 
Given the option selected, does the sum of $40,226 provide a fair estimate of the annual cost for Electrical and Gas Energy Usage for your building?
 
Yes
 
If No, please provide a more representative estimate in the adjoining box
 
 
 
 
Could you please indicate the number of years since your building has been retrofitted to comply with the selected building configuration permutation to the nearest 5-year period?
Please select the earlier year if in-between ranges
 
5
 
10
 
15
 
20
 
25
 
Other
 
 
 
 
In your opinion, which of the following numerical estimates best indicates the overall cost that has been expended (in present-value terms) on your building for the Initial retrofitting, Maintenance and Utilities (i.e Electricity and Gas) over the last 5-year period of its life?
 
$4,670,053
 
$4,670,545
 
$4,679,858
 
$4,701,412
 
$4,743,300
 
If none, please provide a more appropriate estimate in the adjoining box
 
 
 
 
In your opinion, which of the following numerical estimates best indicates the overall cost that has been expended (in present-value terms) on your building for the Initial retrofitting, Maintenance and Utilities (i.e Electricity and Gas) over the last 10-year period of its life?
 
$4,743,303
 
$4,752,937
 
$4,764,743
 
$4,774,703
 
$4,958,492
 
If none, please provide a more appropriate estimate in the adjoining box
 
 
 
 
In your opinion, which of the following numerical estimates best indicates the overall cost that has been expended (in present-value terms) on your building for the Initial retrofitting, Maintenance and Utilities (i.e Electricity and Gas) over the last 15-year period of its life?
 
$4,759,151
 
$4,848,509
 
$4,871,192
 
$4,879,216
 
$5,239,286
 
If none, please provide a more appropriate estimate in the adjoining box
 
 
 
 
In your opinion, which of the following numerical estimates best indicates the overall cost that has been expended (in present-value terms) on your building for the Initial retrofitting, Maintenance and Utilities (i.e Electricity and Gas) over the last 20-year period of its life?
 
$4,746,351
 
$4,829,127
 
$4,852,486
 
$4,855,936
 
$5,519,013
 
If none, please provide a more appropriate estimate in the adjoining box
 
 
 
 
In your opinion, which of the following numerical estimates best indicates the overall cost that has been expended (in present-value terms) on your building for the Initial retrofitting, Maintenance and Utilities (i.e Electricity and Gas) over the last 25-year period of its life?
 
$4,734,757
 
$4,867,064
 
$4,992,548
 
$5,034,396
 
$5,706,812
 
If none, please provide a more appropriate estimate in the adjoining box
 
 
 
 
Given the option selected does the sum of $4,484,777 provide a fair estimate of the capital cost of the retrofitting carried out in your building?
 
Yes
 
Unsure
 
If No, please provide a more representative estimate in the adjoining box
 
 
 
 
Invalid
 
Yes
 
Unsure
 
If No, please provide a more representative estimate in the adjoining box
 
 
 
 
Invalid
 
Yes
 
Unsure
 
If No, please provide a more representative estimate in the adjoining box
 
 
 
 
Invalid
 
5
 
10
 
15
 
20
 
25
 
Other
 
 
 
 
Invalid
 
$4,670,053
 
$4,670,545
 
$4,679,858
 
$4,701,412
 
$4,743,300
 
If none, please provide a more appropriate estimate in the adjoining box
 
 
 
 
Invalid
 
$4,743,303
 
$4,752,937
 
$4,764,743
 
$4,774,703
 
$4,958,492
 
If none, please provide a more appropriate estimate in the adjoining box
 
 
 
 
Invalid
 
$4,759,151
 
$4,846,509
 
$4,871,192
 
$4,879,216
 
$5,239,286
 
If none, please provide a more appropriate estimate in the adjoining box
 
 
 
 
Invalid
 
$4,746,351
 
$4,829,127
 
$4,852,486
 
$4,855,936
 
$5,519,013
 
If none, please provide a more appropriate estimate in the adjoining box
 
 
 
 
Invalid
 
$4,734,757
 
$4,867,064
 
$4,992,548
 
$5,034,396
 
$5,706,812
 
If none, please provide a more appropriate estimate in the adjoining box
 
 
 
 
What will you consider the most uncertain factor in estimating the whole-life cost of your building?
 
Discount Rate
 
Durability of the building components
 
Energy Costs
 
Maintenance Costs
 
Repair Cost
 
Aesthetic and functional appeal
 
Other
 

 
 
 
Did you consider the long-term running cost (Energy Cost, Maintenance Cost, Utility Cost etc) of the building prior to making an investment decision on the respective components that are present in the built facility?
 
Strongly Agree
 
Agree
 
Unsure
 
Disagree
 
strongly disagree
 
Not Applicable
 

 
 
 
In the occasion of a major refurbishment, which of the following options may be most appropriate for your building?
 
Demolishing the building and erect a more energy-efficient and sustainable one
 
retrofitting the building with new technologies
 
Changing the building fabric including windows, doors and possibly roof.
 
Maintaining the status quo and carrying out minor repairs, whenever breakdown occurs
 
Other
 

 
 
 
Given a decision for a new-build which building permutation will appeal to you as the most cost-saving, among the following options? where "x" means feature is available.
A
B
C
 
 
 
If you will like to be kept updated with developments on the research, please provide an email address here:
   
 
 
 
To what extent is whole-life costing or (life-cycle costing) considered in any of the retrofit investment decisions that has been made byyour firm?
 
Extremely Important
 
Slightly Important
 
Unsure
 
Not Really Important
 
Very Unimportant
 
Other
 
 
Share This Survey:          Survey Software Powered by QuestionPro Survey Software