|
|
|
Please indicate the predominant material of which your office building is made |
| |
|
|
|
|
Which of the following job-descriptions best matches your role in relation to the building? |
| |
|
|
|
|
|
Which of the following most closely matches the ownership-organisation of your building |
| |
|
|
|
|
|
Is your office building considered a commisioned building or not, in compliance with the legal classification of the Philadelphia Region? |
| |
|
|
|
|
Which of the following best describes the predominant feature in your uncommissioned building? |
| |
|
|
|
|
Do you have a Temperature Reset strategy feature on your building? |
| |
|
|
|
|
Which of the permutations best describes the energy conservation features in your office building? |
| |
|
|
|
|
Does your office building have a "Smart Grid" feature as an energy conservation measure? |
| |
|
|
|
|
Which of the permutations best describes the energy conservation features in your office building? |
| |
|
|
|
|
Which of the permutations best describes the energy conservation features in your office building? |
| |
|
|
|
|
In addition to an appropriate VAV upgrade, which of the following best describes the additional features in your commissioned building |
| |
|
|
|
|
Does your current building posses a "Temperature Reset Strategy" feature? |
| |
|
|
|
|
Which of the following best represents the additional energy conservation features in your building? |
| |
|
|
|
|
Which of the following additional features are present in your office building with a Temperature Reset Strategy + High Efficiency Elevator + Double Pane Windows? |
| |
|
|
|
|
Given the option selected does the sum of $577,137 provide a fair estimate of the capital cost of your building? |
| |
|
|
|
|
Given the option selected. does the sum of $16,142 provide a fair estimate of the Annual Maintenance cost of your building? |
| |
|
|
|
|
Given the option selected, does the sum of $99,549 provide a fair estimation of the annual cost for Electrical and Gas Energy Usage for your building |
| |
|
|
|
|
Could you please indicate the number of years since your building has been erected or underwent a major refurbishment (i.e. up to 50% of the cost required for a new-build) to the nearest 5-year period. Please select the earlier year if in-between ranges |
| |
|
|
|
|
In your opinion, which of the following numerical estimates best indicates the overall cost that has been expended (in present-value terms) on your building for the Initial Build, Maintenance and Utilities over the first 5-year period of its life. |
| |
|
|
|
|
In your opinion, which of the following numerical estimates best indicates the overall cost that has been expended (in present-value terms) on your building for the Initial Build, Maintenance and Utilities over the first 10-year period of its life. |
| |
|
|
|
|
In your opinion, which of the following numerical estimates best indicates the overall cost that has been expended (in present-value terms) on your building for the Initial Build, Maintenance and Utilities over the first 15-year period of its life. |
| |
|
|
|
|
In your opinion, which of the following numerical estimates best indicates the overall cost that has been expended (in present-value terms) on your building for the Initial Build, Maintenance and Utilities over the first 20-year period of its life. |
| |
|
|
|
|
In your opinion, which of the following numerical estimates best indicates the overall cost that has been expended (in present-value terms) on your building for the Initial Build, Maintenance and Utilities over the first 25-year period of its life. |
| |
|
|
|
|
Given the option selected does the sum of $611,939 provide a fair estimate of the capital cost of your building? |
| |
|
|
|
|
Given the option selected. does the sum of $8,760 provide a fair estimate of the Annual Maintenance cost of your building? |
| |
|
|
|
|
Given the option selected, does the sum of $88,288 provide a fair estimation of the annual cost for Electrical and Gas Energy Usage for your building |
| |
|
|
|
|
Could you please indicate the number of years since your building has been erected or underwent a major refurbishment (i.e. up to 50% of the cost required for a new-build) to the nearest 5-year period. Please select the earlier year if in-between ranges |
| |
|
|
|
In your opinion, which of the following numerical estimates best indicates the overall cost that has been expended (in present-value terms) on your building for the Initial Build, Maintenance and Utilities over the first 5-year period of its life. |
| |
|
|
|
|
In your opinion, which of the following numerical estimates best indicates the overall cost that has been expended (in present-value terms) on your building for the Initial Build, Maintenance and Utilities over the first 10-year period of its life. |
| |
|
|
|
|
In your opinion, which of the following numerical estimates best indicates the overall cost that has been expended (in present-value terms) on your building for the Initial Build, Maintenance and Utilities over the first 15-year period of its life. |
| |
|
|
|
|
In your opinion, which of the following numerical estimates best indicates the overall cost that has been expended (in present-value terms) on your building for the Initial Build, Maintenance and Utilities over the first 20-year period of its life. |
| |
|
|
|
|
In your opinion, which of the following numerical estimates best indicates the overall cost that has been expended (in present-value terms) on your building for the Initial Build, Maintenance and Utilities over the first 25-year period of its life. |
| |
|
|
|
|
Given the option selected does the sum of $795,236 provide a fair estimate of the capital cost of your building? |
| |
|
|
|
|
Given the option selected. does the sum of $4,206 provide a fair estimate of the Annual Maintenance cost of your building? |
| |
|
|
|
|
Given the option selected, does the sum of $88,288 provide a fair estimation of the annual cost for Electrical and Gas Energy Usage for your building |
| |
|
|
|
|
Could you please indicate the number of years since your building has been erected or underwent a major refurbishment (i.e. up to 50% of the cost required for a new-build) to the nearest 5-year period. Please select the earlier year if in-between ranges |
| |
|
|
|
|
In your opinion, which of the following numerical estimates best indicates the overall cost that has been expended (in present-value terms) on your building for the Initial Build, Maintenance and Utilities over the first 5-year period of its life. |
| |
|
|
|
|
In your opinion, which of the following numerical estimates best indicates the overall cost that has been expended (in present-value terms) on your building for the Initial Build, Maintenance and Utilities over the first 10-year period of its life. |
| |
|
|
|
|
In your opinion, which of the following numerical estimates best indicates the overall cost that has been expended (in present-value terms) on your building for the Initial Build, Maintenance and Utilities over the first 15-year period of its life. |
| |
|
|
|
|
In your opinion, which of the following numerical estimates best indicates the overall cost that has been expended (in present-value terms) on your building for the Initial Build, Maintenance and Utilities over the first 20-year period of its life. |
| |
|
|
|
|
In your opinion, which of the following numerical estimates best indicates the overall cost that has been expended (in present-value terms) on your building for the Initial Build, Maintenance and Utilities over the first 25-year period of its life. |
| |
|
|
|
|
Given the option selected does the sum of $763,036 provide a fair estimate of the capital cost of your building? |
| |
|
|
|
|
Given the option selected. does the sum of $4,206 provide a fair estimate of the Annual Maintenance cost of your building? |
| |
|
|
|
|
Given the option selected, does the sum of $88,288 provide a fair estimation of the annual cost for Electrical and Gas Energy Usage for your building |
| |
|
|
|
|
Could you please indicate the number of years since your building has been erected or underwent a major refurbishment (i.e. up to 50% of the cost required for a new-build) to the nearest 5-year period. Please select the earlier year if in-between ranges |
| |
|
|
|
|
In your opinion, which of the following numerical estimates best indicates the overall cost that has been expended (in present-value terms) on your building for the Initial Build, Maintenance and Utilities over the first 5-year period of its life. |
| |
|
|
|
|
In your opinion, which of the following numerical estimates best indicates the overall cost that has been expended (in present-value terms) on your building for the Initial Build, Maintenance and Utilities over the first 10-year period of its life. |
| |
|
|
|
|
In your opinion, which of the following numerical estimates best indicates the overall cost that has been expended (in present-value terms) on your building for the Initial Build, Maintenance and Utilities over the first 15-year period of its life. |
| |
|
|
|
|
In your opinion, which of the following numerical estimates best indicates the overall cost that has been expended (in present-value terms) on your building for the Initial Build, Maintenance and Utilities over the first 20-year period of its life. |
| |
|
|
|
|
In your opinion, which of the following numerical estimates best indicates the overall cost that has been expended (in present-value terms) on your building for the Initial Build, Maintenance and Utilities over the first 25-year period of its life. |
| |
|
|
|
|
Given the option selected does the sum of $577,137 provide a fair estimate of the capital cost of your building? |
| |
|
|
|
|
Given the option selected. does the sum of $16,142 provide a fair estimate of the Annual Maintenance cost of your building? |
| |
|
|
|
|
Given the option selected, does the sum of $92,875 provide a fair estimation of the annual cost for Electrical and Gas Energy Usage for your building |
| |
|
|
|
|
Could you please indicate the number of years since your building has been erected or underwent a major refurbishment (i.e. up to 50% of the cost required for a new-build) to the nearest 5-year period. Please select the earlier year if in-between ranges |
| |
|
|
|
|
In your opinion, which of the following numerical estimates best indicates the overall cost that has been expended (in present-value terms) on your building for the Initial Build, Maintenance and Utilities over the first 5-year period of its life. |
| |
|
|
|
|
In your opinion, which of the following numerical estimates best indicates the overall cost that has been expended (in present-value terms) on your building for the Initial Build, Maintenance and Utilities over the first 10-year period of its life. |
| |
|
|
|
|
In your opinion, which of the following numerical estimates best indicates the overall cost that has been expended (in present-value terms) on your building for the Initial Build, Maintenance and Utilities over the first 15-year period of its life. |
| |
|
|
|
|
In your opinion, which of the following numerical estimates best indicates the overall cost that has been expended (in present-value terms) on your building for the Initial Build, Maintenance and Utilities over the first 20-year period of its life. |
| |
|
|
|
|
In your opinion, which of the following numerical estimates best indicates the overall cost that has been expended (in present-value terms) on your building for the Initial Build, Maintenance and Utilities over the first 25-year period of its life. |
| |
|
|
|
|
Given the option selected does the sum of $1,100,638 provide a fair estimate of the capital cost of your building? |
| |
|
|
|
|
Given the option selected. does the sum of $16,142 provide a fair estimate of the Annual Maintenance cost of your building? |
| |
|
|
|
|
Given the option selected, does the sum of $92,882 provide a fair estimation of the annual cost for Electrical and Gas Energy Usage for your building |
| |
|
|
|
|
Could you please indicate the number of years since your building has been erected or underwent a major refurbishment (i.e. up to 50% of the cost required for a new-build) to the nearest 5-year period. Please select the earlier year if in-between ranges |
| |
|
|
|
|
In your opinion, which of the following numerical estimates best indicates the overall cost that has been expended (in present-value terms) on your building for the Initial Build, Maintenance and Utilities over the first 5-year period of its life. |
| |
|
|
|
|
In your opinion, which of the following numerical estimates best indicates the overall cost that has been expended (in present-value terms) on your building for the Initial Build, Maintenance and Utilities over the first 10-year period of its life. |
| |
|
|
|
|
In your opinion, which of the following numerical estimates best indicates the overall cost that has been expended (in present-value terms) on your building for the Initial Build, Maintenance and Utilities over the first 15-year period of its life. |
| |
|
|
|
|
In your opinion, which of the following numerical estimates best indicates the overall cost that has been expended (in present-value terms) on your building for the Initial Build, Maintenance and Utilities over the first 20-year period of its life. |
| |
|
|
|
|
In your opinion, which of the following numerical estimates best indicates the overall cost that has been expended (in present-value terms) on your building for the Initial Build, Maintenance and Utilities over the first 25-year period of its life. |
| |
|
|
|
|
Given the option selected does the sum of $1,101,444 provide a fair estimate of the capital cost of your building? |
| |
|
|
|
|
Given the option selected. does the sum of $16,142 provide a fair estimate of the Annual Maintenance cost of your building? |
| |
|
|
|
|
Given the option selected, does the sum of $92,882 provide a fair estimation of the annual cost for Electrical and Gas Energy Usage for your building |
| |
|
|
|
|
Could you please indicate the number of years since your building has been erected or underwent a major refurbishment (i.e. up to 50% of the cost required for a new-build) to the nearest 5-year period. Please select the earlier year if in-between ranges |
| |
|
|
|
|
In your opinion, which of the following numerical estimates best indicates the overall cost that has been expended (in present-value terms) on your building for the Initial Build, Maintenance and Utilities over the first 5-year period of its life. |
| |
|
|
|
|
In your opinion, which of the following numerical estimates best indicates the overall cost that has been expended (in present-value terms) on your building for the Initial Build, Maintenance and Utilities over the first 10-year period of its life. |
| |
|
|
|
|
In your opinion, which of the following numerical estimates best indicates the overall cost that has been expended (in present-value terms) on your building for the Initial Build, Maintenance and Utilities over the first 15-year period of its life. |
| |
|
|
|
|
In your opinion, which of the following numerical estimates best indicates the overall cost that has been expended (in present-value terms) on your building for the Initial Build, Maintenance and Utilities over the first 20-year period of its life. |
| |
|
|
|
|
In your opinion, which of the following numerical estimates best indicates the overall cost that has been expended (in present-value terms) on your building for the Initial Build, Maintenance and Utilities over the first 25-year period of its life. |
| |
|
|
|
|
Given the option selected does the sum of $1,284,741 provide a fair estimate of the capital cost of your building? |
| |
|
|
|
|
Given the option selected. does the sum of $4,206 provide a fair estimate of the Annual Maintenance cost of your building? |
| |
|
|
|
|
Given the option selected, does the sum of $65,672 provide a fair estimation of the annual cost for Electrical and Gas Energy Usage for your building |
| |
|
|
|
|
Could you please indicate the number of years since your building has been erected or underwent a major refurbishment (i.e. up to 50% of the cost required for a new-build) to the nearest 5-year period. Please select the earlier year if in-between ranges |
| |
|
|
|
|
In your opinion, which of the following numerical estimates best indicates the overall cost that has been expended (in present-value terms) on your building for the Initial Build, Maintenance and Utilities over the first 5-year period of its life. |
| |
|
|
|
|
In your opinion, which of the following numerical estimates best indicates the overall cost that has been expended (in present-value terms) on your building for the Initial Build, Maintenance and Utilities over the first 10-year period of its life. |
| |
|
|
|
|
In your opinion, which of the following numerical estimates best indicates the overall cost that has been expended (in present-value terms) on your building for the Initial Build, Maintenance and Utilities over the first 15-year period of its life. |
| |
|
|
|
|
In your opinion, which of the following numerical estimates best indicates the overall cost that has been expended (in present-value terms) on your building for the Initial Build, Maintenance and Utilities over the first 20-year period of its life. |
| |
|
|
|
|
In your opinion, which of the following numerical estimates best indicates the overall cost that has been expended (in present-value terms) on your building for the Initial Build, Maintenance and Utilities over the first 25-year period of its life. |
| |
|
|
|
|
Given the option selected does the sum of $1,291,717 provide a fair estimate of the capital cost of your building? |
| |
|
|
|
|
Given the option selected. does the sum of $16,142 provide a fair estimate of the Annual Maintenance cost of your building? |
| |
|
|
|
|
Given the option selected, does the sum of $89,708 provide a fair estimation of the annual cost for Electrical and Gas Energy Usage for your building |
| |
|
|
|
|
Could you please indicate the number of years since your building has been erected or underwent a major refurbishment (i.e. up to 50% of the cost required for a new-build) to the nearest 5-year period. Please select the earlier year if in-between ranges |
| |
|
|
|
|
In your opinion, which of the following numerical estimates best indicates the overall cost that has been expended (in present-value terms) on your building for the Initial Build, Maintenance and Utilities over the first 5-year period of its life. |
| |
|
|
|
|
In your opinion, which of the following numerical estimates best indicates the overall cost that has been expended (in present-value terms) on your building for the Initial Build, Maintenance and Utilities over the first 10-year period of its life. |
| |
|
|
|
|
In your opinion, which of the following numerical estimates best indicates the overall cost that has been expended (in present-value terms) on your building for the Initial Build, Maintenance and Utilities over the first 15-year period of its life. |
| |
|
|
|
|
In your opinion, which of the following numerical estimates best indicates the overall cost that has been expended (in present-value terms) on your building for the Initial Build, Maintenance and Utilities over the first 20-year period of its life. |
| |
|
|
|
|
In your opinion, which of the following numerical estimates best indicates the overall cost that has been expended (in present-value terms) on your building for the Initial Build, Maintenance and Utilities over the first 25-year period of its life. |
| |
|
|
|
|
Given the option selected does the sum of $1,123,708 provide a fair estimate of the capital cost of your building? |
| |
|
|
|
|
Given the option selected. does the sum of $16,142 provide a fair estimate of the Annual Maintenance cost of your building? |
| |
|
|
|
|
Given the option selected, does the sum of $91,428 provide a fair estimation of the annual cost for Electrical and Gas Energy Usage for your building |
| |
|
|
|
|
Could you please indicate the number of years since your building has been erected or underwent a major refurbishment (i.e. up to 50% of the cost required for a new-build) to the nearest 5-year period. Please select the earlier year if in-between ranges |
| |
|
|
|
|
In your opinion, which of the following numerical estimates best indicates the overall cost that has been expended (in present-value terms) on your building for the Initial Build, Maintenance and Utilities over the first 5-year period of its life. |
| |
|
|
|
|
In your opinion, which of the following numerical estimates best indicates the overall cost that has been expended (in present-value terms) on your building for the Initial Build, Maintenance and Utilities over the first 10-year period of its life. |
| |
|
|
|
|
In your opinion, which of the following numerical estimates best indicates the overall cost that has been expended (in present-value terms) on your building for the Initial Build, Maintenance and Utilities over the first 15-year period of its life. |
| |
|
|
|
|
In your opinion, which of the following numerical estimates best indicates the overall cost that has been expended (in present-value terms) on your building for the Initial Build, Maintenance and Utilities over the first 20-year period of its life. |
| |
|
|
|
|
In your opinion, which of the following numerical estimates best indicates the overall cost that has been expended (in present-value terms) on your building for the Initial Build, Maintenance and Utilities over the first 25-year period of its life. |
| |
|
|
|
|
Given the option selected does the sum of $1,104,654 provide a fair estimate of the capital cost of your building? |
| |
|
|
|
|
Given the option selected. does the sum of $16,142 provide a fair estimate of the Annual Maintenance cost of your building? |
| |
|
|
|
|
Given the option selected, does the sum of $87,678 provide a fair estimation of the annual cost for Electrical and Gas Energy Usage for your building |
| |
|
|
|
|
Could you please indicate the number of years since your building has been erected or underwent a major refurbishment (i.e. up to 50% of the cost required for a new-build) to the nearest 5-year period. Please select the earlier year if in-between ranges |
| |
|
|
|
|
In your opinion, which of the following numerical estimates best indicates the overall cost that has been expended (in present-value terms) on your building for the Initial Build, Maintenance and Utilities over the first 5-year period of its life. |
| |
|
|
|
|
In your opinion, which of the following numerical estimates best indicates the overall cost that has been expended (in present-value terms) on your building for the Initial Build, Maintenance and Utilities over the first 10-year period of its life. |
| |
|
|
|
|
In your opinion, which of the following numerical estimates best indicates the overall cost that has been expended (in present-value terms) on your building for the Initial Build, Maintenance and Utilities over the first 15-year period of its life. |
| |
|
|
|
|
In your opinion, which of the following numerical estimates best indicates the overall cost that has been expended (in present-value terms) on your building for the Initial Build, Maintenance and Utilities over the first 20-year period of its life. |
| |
|
|
|
|
In your opinion, which of the following numerical estimates best indicates the overall cost that has been expended (in present-value terms) on your building for the Initial Build, Maintenance and Utilities over the first 25-year period of its life. |
| |
|
|
|
|
Given the option selected does the sum of $1,141,306 provide a fair estimate of the capital cost of your building? |
| |
|
|
|
|
Given the option selected. does the sum of $16,142 provide a fair estimate of the Annual Maintenance cost of your building? |
| |
|
|
|
|
Given the option selected, does the sum of $86,064 provide a fair estimation of the annual cost for Electrical and Gas Energy Usage for your building |
| |
|
|
|
|
Could you please indicate the number of years since your building has been erected or underwent a major refurbishment (i.e. up to 50% of the cost required for a new-build) to the nearest 5-year period. Please select the earlier year if in-between ranges |
| |
|
|
|
|
In your opinion, which of the following numerical estimates best indicates the overall cost that has been expended (in present-value terms) on your building for the Initial Build, Maintenance and Utilities over the first 5-year period of its life. |
| |
|
|
|
|
In your opinion, which of the following numerical estimates best indicates the overall cost that has been expended (in present-value terms) on your building for the Initial Build, Maintenance and Utilities over the first 10-year period of its life. |
| |
|
|
|
|
In your opinion, which of the following numerical estimates best indicates the overall cost that has been expended (in present-value terms) on your building for the Initial Build, Maintenance and Utilities over the first 15-year period of its life. |
| |
|
|
|
|
In your opinion, which of the following numerical estimates best indicates the overall cost that has been expended (in present-value terms) on your building for the Initial Build, Maintenance and Utilities over the first 20-year period of its life. |
| |
|
|
|
|
In your opinion, which of the following numerical estimates best indicates the overall cost that has been expended (in present-value terms) on your building for the Initial Build, Maintenance and Utilities over the first 25-year period of its life. |
| |
|
|
|
|
Given the option selected does the sum of $1,287,721 provide a fair estimate of the capital cost of your building? |
| |
|
|
|
|
Given the option selected. does the sum of $16,142 provide a fair estimate of the Annual Maintenance cost of your building? |
| |
|
|
|
|
Given the option selected, does the sum of $86,064 provide a fair estimation of the annual cost for Electrical and Gas Energy Usage for your building |
| |
|
|
|
|
Could you please indicate the number of years since your building has been erected or underwent a major refurbishment (i.e. up to 50% of the cost required for a new-build) to the nearest 5-year period. Please select the earlier year if in-between ranges |
| |
|
|
|
|
In your opinion, which of the following numerical estimates best indicates the overall cost that has been expended (in present-value terms) on your building for the Initial Build, Maintenance and Utilities over the first 5-year period of its life. |
| |
|
|
|
|
In your opinion, which of the following numerical estimates best indicates the overall cost that has been expended (in present-value terms) on your building for the Initial Build, Maintenance and Utilities over the first 10-year period of its life. |
| |
|
|
|
|
In your opinion, which of the following numerical estimates best indicates the overall cost that has been expended (in present-value terms) on your building for the Initial Build, Maintenance and Utilities over the first 15-year period of its life. |
| |
|
|
|
|
In your opinion, which of the following numerical estimates best indicates the overall cost that has been expended (in present-value terms) on your building for the Initial Build, Maintenance and Utilities over the first 20-year period of its life. |
| |
|
|
|
|
In your opinion, which of the following numerical estimates best indicates the overall cost that has been expended (in present-value terms) on your building for the Initial Build, Maintenance and Utilities over the first 25-year period of its life. |
| |
|
|
|
|
Given the option selected does the sum of $1,468,032 provide a fair estimate of the capital cost of your building? |
| |
|
|
|
|
Given the option selected. does the sum of $4,206 provide a fair estimate of the Annual Maintenance cost of your building? |
| |
|
|
|
|
Given the option selected, does the sum of $56,875 provide a fair estimation of the annual cost for Electrical and Gas Energy Usage for your building |
| |
|
|
|
|
Could you please indicate the number of years since your building has been erected or underwent a major refurbishment (i.e. up to 50% of the cost required for a new-build) to the nearest 5-year period. Please select the earlier year if in-between ranges |
| |
|
|
|
|
In your opinion, which of the following numerical estimates best indicates the overall cost that has been expended (in present-value terms) on your building for the Initial Build, Maintenance and Utilities over the first 5-year period of its life. |
| |
|
|
|
|
In your opinion, which of the following numerical estimates best indicates the overall cost that has been expended (in present-value terms) on your building for the Initial Build, Maintenance and Utilities over the first 10-year period of its life. |
| |
|
|
|
|
In your opinion, which of the following numerical estimates best indicates the overall cost that has been expended (in present-value terms) on your building for the Initial Build, Maintenance and Utilities over the first 15-year period of its life. |
| |
|
|
|
|
In your opinion, which of the following numerical estimates best indicates the overall cost that has been expended (in present-value terms) on your building for the Initial Build, Maintenance and Utilities over the first 20-year period of its life. |
| |
|
|
|
|
In your opinion, which of the following numerical estimates best indicates the overall cost that has been expended (in present-value terms) on your building for the Initial Build, Maintenance and Utilities over the first 25-year period of its life. |
| |
|
|
|
|
Given the option selected does the sum of $1,149,032 provide a fair estimate of the capital cost of your building? |
| |
|
|
|
|
Given the option selected. does the sum of $8,760 provide a fair estimate of the Annual Maintenance cost of your building? |
| |
|
|
|
|
Given the option selected, does the sum of $74,803 provide a fair estimation of the annual cost for Electrical and Gas Energy Usage for your building |
| |
|
|
|
|
Could you please indicate the number of years since your building has been erected or underwent a major refurbishment (i.e. up to 50% of the cost required for a new-build) to the nearest 5-year period. Please select the earlier year if in-between ranges |
| |
|
|
|
|
In your opinion, which of the following numerical estimates best indicates the overall cost that has been expended (in present-value terms) on your building for the Initial Build, Maintenance and Utilities over the first 5-year period of its life. |
| |
|
|
|
|
In your opinion, which of the following numerical estimates best indicates the overall cost that has been expended (in present-value terms) on your building for the Initial Build, Maintenance and Utilities over the first 10-year period of its life. |
| |
|
|
|
|
In your opinion, which of the following numerical estimates best indicates the overall cost that has been expended (in present-value terms) on your building for the Initial Build, Maintenance and Utilities over the first 15-year period of its life. |
| |
|
|
|
|
In your opinion, which of the following numerical estimates best indicates the overall cost that has been expended (in present-value terms) on your building for the Initial Build, Maintenance and Utilities over the first 20-year period of its life. |
| |
|
|
|
|
In your opinion, which of the following numerical estimates best indicates the overall cost that has been expended (in present-value terms) on your building for the Initial Build, Maintenance and Utilities over the first 25-year period of its life. |
| |
|
|
|
|
Given the option selected does the sum of $1,333,220 provide a fair estimate of the capital cost of your building? |
| |
|
|
|
|
Given the option selected. does the sum of $4,206 provide a fair estimate of the Annual Maintenance cost of your building? |
| |
|
|
|
|
Given the option selected, does the sum of $66,970 provide a fair estimation of the annual cost for Electrical and Gas Energy Usage for your building |
| |
|
|
|
|
Could you please indicate the number of years since your building has been erected or underwent a major refurbishment (i.e. up to 50% of the cost required for a new-build) to the nearest 5-year period. Please select the earlier year if in-between ranges |
| |
|
|
|
|
In your opinion, which of the following numerical estimates best indicates the overall cost that has been expended (in present-value terms) on your building for the Initial Build, Maintenance and Utilities over the first 5-year period of its life. |
| |
|
|
|
|
In your opinion, which of the following numerical estimates best indicates the overall cost that has been expended (in present-value terms) on your building for the Initial Build, Maintenance and Utilities over the first 10-year period of its life. |
| |
|
|
|
|
In your opinion, which of the following numerical estimates best indicates the overall cost that has been expended (in present-value terms) on your building for the Initial Build, Maintenance and Utilities over the first 15-year period of its life. |
| |
|
|
|
|
In your opinion, which of the following numerical estimates best indicates the overall cost that has been expended (in present-value terms) on your building for the Initial Build, Maintenance and Utilities over the first 20-year period of its life. |
| |
|
|
|
|
In your opinion, which of the following numerical estimates best indicates the overall cost that has been expended (in present-value terms) on your building for the Initial Build, Maintenance and Utilities over the first 25-year period of its life. |
| |
|
|
|
|
Given the option selected does the sum of $1,328,639 provide a fair estimate of the capital cost of your building? |
| |
|
|
|
|
Given the option selected. does the sum of $16,142 provide a fair estimate of the Annual Maintenance cost of your building? |
| |
|
|
|
|
Given the option selected, does the sum of $84,876 provide a fair estimation of the annual cost for Electrical and Gas Energy Usage for your building |
| |
|
|
|
|
Could you please indicate the number of years since your building has been erected or underwent a major refurbishment (i.e. up to 50% of the cost required for a new-build) to the nearest 5-year period. Please select the earlier year if in-between ranges |
| |
|
|
|
|
In your opinion, which of the following numerical estimates best indicates the overall cost that has been expended (in present-value terms) on your building for the Initial Build, Maintenance and Utilities over the first 5-year period of its life. |
| |
|
|
|
|
In your opinion, which of the following numerical estimates best indicates the overall cost that has been expended (in present-value terms) on your building for the Initial Build, Maintenance and Utilities over the first 10-year period of its life. |
| |
|
|
|
|
In your opinion, which of the following numerical estimates best indicates the overall cost that has been expended (in present-value terms) on your building for the Initial Build, Maintenance and Utilities over the first 15-year period of its life. |
| |
|
|
|
|
In your opinion, which of the following numerical estimates best indicates the overall cost that has been expended (in present-value terms) on your building for the Initial Build, Maintenance and Utilities over the first 20-year period of its life. |
| |
|
|
|
|
In your opinion, which of the following numerical estimates best indicates the overall cost that has been expended (in present-value terms) on your building for the Initial Build, Maintenance and Utilities over the first 25-year period of its life. |
| |
|
|
|
|
Given the option selected does the sum of $1,334,976 provide a fair estimate of the capital cost of your building? |
| |
|
|
|
|
Given the option selected. does the sum of $8,760 provide a fair estimate of the Annual Maintenance cost of your building? |
| |
|
|
|
|
Given the option selected, does the sum of $65,461 provide a fair estimation of the annual cost for Electrical and Gas Energy Usage for your building |
| |
|
|
|
|
Could you please indicate the number of years since your building has been erected or underwent a major refurbishment (i.e. up to 50% of the cost required for a new-build) to the nearest 5-year period. Please select the earlier year if in-between ranges |
| |
|
|
|
|
In your opinion, which of the following numerical estimates best indicates the overall cost that has been expended (in present-value terms) on your building for the Initial Build, Maintenance and Utilities over the first 5-year period of its life. |
| |
|
|
|
|
In your opinion, which of the following numerical estimates best indicates the overall cost that has been expended (in present-value terms) on your building for the Initial Build, Maintenance and Utilities over the first 10-year period of its life. |
| |
|
|
|
|
In your opinion, which of the following numerical estimates best indicates the overall cost that has been expended (in present-value terms) on your building for the Initial Build, Maintenance and Utilities over the first 15-year period of its life. |
| |
|
|
|
|
In your opinion, which of the following numerical estimates best indicates the overall cost that has been expended (in present-value terms) on your building for the Initial Build, Maintenance and Utilities over the first 20-year period of its life. |
| |
|
|
|
|
In your opinion, which of the following numerical estimates best indicates the overall cost that has been expended (in present-value terms) on your building for the Initial Build, Maintenance and Utilities over the first 25-year period of its life. |
| |
|
|
|
|
Given the option selected does the sum of $1,518,272 provide a fair estimate of the capital cost of your building? |
| |
|
|
|
|
Given the option selected. does the sum of $4,206 provide a fair estimate of the Annual Maintenance cost of your building? |
| |
|
|
|
|
Given the option selected, does the sum of $55,094 provide a fair estimation of the annual cost for Electrical and Gas Energy Usage for your building |
| |
|
|
|
|
Could you please indicate the number of years since your building has been erected or underwent a major refurbishment (i.e. up to 50% of the cost required for a new-build) to the nearest 5-year period. Please select the earlier year if in-between ranges |
| |
|
|
|
|
In your opinion, which of the following numerical estimates best indicates the overall cost that has been expended (in present-value terms) on your building for the Initial Build, Maintenance and Utilities over the first 5-year period of its life. |
| |
|
|
|
|
In your opinion, which of the following numerical estimates best indicates the overall cost that has been expended (in present-value terms) on your building for the Initial Build, Maintenance and Utilities over the first 10-year period of its life. |
| |
|
|
|
|
In your opinion, which of the following numerical estimates best indicates the overall cost that has been expended (in present-value terms) on your building for the Initial Build, Maintenance and Utilities over the first 15-year period of its life. |
| |
|
|
|
|
In your opinion, which of the following numerical estimates best indicates the overall cost that has been expended (in present-value terms) on your building for the Initial Build, Maintenance and Utilities over the first 20-year period of its life. |
| |
|
|
|
|
In your opinion, which of the following numerical estimates best indicates the overall cost that has been expended (in present-value terms) on your building for the Initial Build, Maintenance and Utilities over the first 25-year period of its life. |
| |
|
|
|
|
Given the option selected does the sum of $1,170,356 provide a fair estimate of the capital cost of your building? |
| |
|
|
|
|
Given the option selected. does the sum of $16,142 provide a fair estimate of the Annual Maintenance cost of your building? |
| |
|
|
|
|
Given the option selected, does the sum of $79,755 provide a fair estimation of the annual cost for Electrical and Gas Energy Usage for your building |
| |
|
|
|
|
Could you please indicate the number of years since your building has been erected or underwent a major refurbishment (i.e. up to 50% of the cost required for a new-build) to the nearest 5-year period. Please select the earlier year if in-between ranges |
| |
|
|
|
|
In your opinion, which of the following numerical estimates best indicates the overall cost that has been expended (in present-value terms) on your building for the Initial Build, Maintenance and Utilities over the first 5-year period of its life. |
| |
|
|
|
|
In your opinion, which of the following numerical estimates best indicates the overall cost that has been expended (in present-value terms) on your building for the Initial Build, Maintenance and Utilities over the first 10-year period of its life. |
| |
|
|
|
|
In your opinion, which of the following numerical estimates best indicates the overall cost that has been expended (in present-value terms) on your building for the Initial Build, Maintenance and Utilities over the first 15-year period of its life. |
| |
|
|
|
|
In your opinion, which of the following numerical estimates best indicates the overall cost that has been expended (in present-value terms) on your building for the Initial Build, Maintenance and Utilities over the first 20-year period of its life. |
| |
|
|
|
|
In your opinion, which of the following numerical estimates best indicates the overall cost that has been expended (in present-value terms) on your building for the Initial Build, Maintenance and Utilities over the first 25-year period of its life. |
| |
|
|
|
|
Given the option selected does the sum of $1,170,356 provide a fair estimate of the capital cost of your building? |
| |
|
|
|
|
Given the option selected. does the sum of $16,142 provide a fair estimate of the Annual Maintenance cost of your building? |
| |
|
|
|
|
Given the option selected, does the sum of $78,587 provide a fair estimation of the annual cost for Electrical and Gas Energy Usage for your building |
| |
|
|
|
|
Could you please indicate the number of years since your building has been erected or underwent a major refurbishment (i.e. up to 50% of the cost required for a new-build) to the nearest 5-year period. Please select the earlier year if in-between ranges |
| |
|
|
|
|
In your opinion, which of the following numerical estimates best indicates the overall cost that has been expended (in present-value terms) on your building for the Initial Build, Maintenance and Utilities over the first 5-year period of its life. |
| |
|
|
|
|
In your opinion, which of the following numerical estimates best indicates the overall cost that has been expended (in present-value terms) on your building for the Initial Build, Maintenance and Utilities over the first 10-year period of its life. |
| |
|
|
|
|
In your opinion, which of the following numerical estimates best indicates the overall cost that has been expended (in present-value terms) on your building for the Initial Build, Maintenance and Utilities over the first 15-year period of its life. |
| |
|
|
|
|
In your opinion, which of the following numerical estimates best indicates the overall cost that has been expended (in present-value terms) on your building for the Initial Build, Maintenance and Utilities over the first 20-year period of its life. |
| |
|
|
|
|
In your opinion, which of the following numerical estimates best indicates the overall cost that has been expended (in present-value terms) on your building for the Initial Build, Maintenance and Utilities over the first 25-year period of its life. |
| |
|
|
|
|
Given the option selected does the sum of $1,178,974 provide a fair estimate of the capital cost of your building? |
| |
|
|
|
|
Given the option selected. does the sum of $8,760 provide a fair estimate of the Annual Maintenance cost of your building? |
| |
|
|
|
|
Given the option selected, does the sum of $67,327 provide a fair estimation of the annual cost for Electrical and Gas Energy Usage for your building |
| |
|
|
|
|
Could you please indicate the number of years since your building has been erected or underwent a major refurbishment (i.e. up to 50% of the cost required for a new-build) to the nearest 5-year period. Please select the earlier year if in-between ranges |
| |
|
|
|
|
In your opinion, which of the following numerical estimates best indicates the overall cost that has been expended (in present-value terms) on your building for the Initial Build, Maintenance and Utilities over the first 5-year period of its life. |
| |
|
|
|
|
In your opinion, which of the following numerical estimates best indicates the overall cost that has been expended (in present-value terms) on your building for the Initial Build, Maintenance and Utilities over the first 10-year period of its life. |
| |
|
|
|
|
In your opinion, which of the following numerical estimates best indicates the overall cost that has been expended (in present-value terms) on your building for the Initial Build, Maintenance and Utilities over the first 15-year period of its life. |
| |
|
|
|
|
In your opinion, which of the following numerical estimates best indicates the overall cost that has been expended (in present-value terms) on your building for the Initial Build, Maintenance and Utilities over the first 20-year period of its life. |
| |
|
|
|
|
In your opinion, which of the following numerical estimates best indicates the overall cost that has been expended (in present-value terms) on your building for the Initial Build, Maintenance and Utilities over the first 25-year period of its life. |
| |
|
|
|
|
Given the option selected does the sum of $1, 362, 270 provide a fair estimate of the capital cost of your building? |
| |
|
|
|
|
Given the option selected. does the sum of $4,206 provide a fair estimate of the Annual Maintenance cost of your building? |
| |
|
|
|
|
Given the option selected, does the sum of $59,493 provide a fair estimation of the annual cost for Electrical and Gas Energy Usage for your building |
| |
|
|
|
|
Could you please indicate the number of years since your building has been erected or underwent a major refurbishment (i.e. up to 50% of the cost required for a new-build) to the nearest 5-year period. Please select the earlier year if in-between ranges |
| |
|
|
|
|
In your opinion, which of the following numerical estimates best indicates the overall cost that has been expended (in present-value terms) on your building for the Initial Build, Maintenance and Utilities over the first 5-year period of its life. |
| |
|
|
|
|
In your opinion, which of the following numerical estimates best indicates the overall cost that has been expended (in present-value terms) on your building for the Initial Build, Maintenance and Utilities over the first 10-year period of its life. |
| |
|
|
|
|
In your opinion, which of the following numerical estimates best indicates the overall cost that has been expended (in present-value terms) on your building for the Initial Build, Maintenance and Utilities over the first 15-year period of its life. |
| |
|
|
|
|
In your opinion, which of the following numerical estimates best indicates the overall cost that has been expended (in present-value terms) on your building for the Initial Build, Maintenance and Utilities over the first 20-year period of its life. |
| |
|
|
|
|
In your opinion, which of the following numerical estimates best indicates the overall cost that has been expended (in present-value terms) on your building for the Initial Build, Maintenance and Utilities over the first 25-year period of its life. |
| |
|
|
|
|
Given the option selected does the sum of $1, 361, 283 provide a fair estimate of the capital cost of your building? |
| |
|
|
|
|
Given the option selected. does the sum of $16,142 provide a fair estimate of the Annual Maintenance cost of your building? |
| |
|
|
|
|
Given the option selected, does the sum of $77,509 provide a fair estimation of the annual cost for Electrical and Gas Energy Usage for your building |
| |
|
|
|
|
Could you please indicate the number of years since your building has been erected or underwent a major refurbishment (i.e. up to 50% of the cost required for a new-build) to the nearest 5-year period. Please select the earlier year if in-between ranges |
| |
|
|
|
|
In your opinion, which of the following numerical estimates best indicates the overall cost that has been expended (in present-value terms) on your building for the Initial Build, Maintenance and Utilities over the first 5-year period of its life. |
| |
|
|
|
|
In your opinion, which of the following numerical estimates best indicates the overall cost that has been expended (in present-value terms) on your building for the Initial Build, Maintenance and Utilities over the first 10-year period of its life. |
| |
|
|
|
|
In your opinion, which of the following numerical estimates best indicates the overall cost that has been expended (in present-value terms) on your building for the Initial Build, Maintenance and Utilities over the first 15-year period of its life. |
| |
|
|
|
|
In your opinion, which of the following numerical estimates best indicates the overall cost that has been expended (in present-value terms) on your building for the Initial Build, Maintenance and Utilities over the first 20-year period of its life. |
| |
|
|
|
|
In your opinion, which of the following numerical estimates best indicates the overall cost that has been expended (in present-value terms) on your building for the Initial Build, Maintenance and Utilities over the first 25-year period of its life. |
| |
|
|
|
|
Given the option selected does the sum of $1, 365, 696 provide a fair estimate of the capital cost of your building? |
| |
|
|
|
|
Given the option selected. does the sum of $8,760 provide a fair estimate of the Annual Maintenance cost of your building? |
| |
|
|
|
|
Given the option selected, does the sum of $57,419 provide a fair estimation of the annual cost for Electrical and Gas Energy Usage for your building |
| |
|
|
|
|
Could you please indicate the number of years since your building has been erected or underwent a major refurbishment (i.e. up to 50% of the cost required for a new-build) to the nearest 5-year period. Please select the earlier year if in-between ranges |
| |
|
|
|
|
In your opinion, which of the following numerical estimates best indicates the overall cost that has been expended (in present-value terms) on your building for the Initial Build, Maintenance and Utilities over the first 5-year period of its life. |
| |
|
|
|
|
In your opinion, which of the following numerical estimates best indicates the overall cost that has been expended (in present-value terms) on your building for the Initial Build, Maintenance and Utilities over the first 10-year period of its life. |
| |
|
|
|
|
In your opinion, which of the following numerical estimates best indicates the overall cost that has been expended (in present-value terms) on your building for the Initial Build, Maintenance and Utilities over the first 15-year period of its life. |
| |
|
|
|
|
In your opinion, which of the following numerical estimates best indicates the overall cost that has been expended (in present-value terms) on your building for the Initial Build, Maintenance and Utilities over the first 20-year period of its life. |
| |
|
|
|
|
In your opinion, which of the following numerical estimates best indicates the overall cost that has been expended (in present-value terms) on your building for the Initial Build, Maintenance and Utilities over the first 25-year period of its life. |
| |
|
|
|
|
Given the option selected does the sum of $1, 548, 992 provide a fair estimate of the capital cost of your building? |
| |
|
|
|
|
Given the option selected. does the sum of $4,206 provide a fair estimate of the Annual Maintenance cost of your building? |
| |
|
|
|
|
Given the option selected, does the sum of $49,543 provide a fair estimation of the annual cost for Electrical and Gas Energy Usage for your building |
| |
|
|
|
|
Could you please indicate the number of years since your building has been erected or underwent a major refurbishment (i.e. up to 50% of the cost required for a new-build) to the nearest 5-year period. Please select the earlier year if in-between ranges |
| |
|
|
|
|
In your opinion, which of the following numerical estimates best indicates the overall cost that has been expended (in present-value terms) on your building for the Initial Build, Maintenance and Utilities over the first 5-year period of its life. |
| |
|
|
|
|
In your opinion, which of the following numerical estimates best indicates the overall cost that has been expended (in present-value terms) on your building for the Initial Build, Maintenance and Utilities over the first 10-year period of its life. |
| |
|
|
|
|
In your opinion, which of the following numerical estimates best indicates the overall cost that has been expended (in present-value terms) on your building for the Initial Build, Maintenance and Utilities over the first 15-year period of its life. |
| |
|
|
|
|
In your opinion, which of the following numerical estimates best indicates the overall cost that has been expended (in present-value terms) on your building for the Initial Build, Maintenance and Utilities over the first 20-year period of its life. |
| |
|
|
|
|
In your opinion, which of the following numerical estimates best indicates the overall cost that has been expended (in present-value terms) on your building for the Initial Build, Maintenance and Utilities over the first 25-year period of its life. |
| |
|
|
|
|
Given the option selected does the sum of $1, 211 359 provide a fair estimate of the capital cost of your building? |
| |
|
|
|
|
Given the option selected. does the sum of $16,142 provide a fair estimate of the Annual Maintenance cost of your building? |
| |
|
|
|
|
Given the option selected, does the sum of $95,162 provide a fair estimation of the annual cost for Electrical and Gas Energy Usage for your building |
| |
|
|
|
|
Could you please indicate the number of years since your building has been erected or underwent a major refurbishment (i.e. up to 50% of the cost required for a new-build) to the nearest 5-year period. Please select the earlier year if in-between ranges |
| |
|
|
|
|
In your opinion, which of the following numerical estimates best indicates the overall cost that has been expended (in present-value terms) on your building for the Initial Build, Maintenance and Utilities over the first 5-year period of its life. |
| |
|
|
|
|
In your opinion, which of the following numerical estimates best indicates the overall cost that has been expended (in present-value terms) on your building for the Initial Build, Maintenance and Utilities over the first 10-year period of its life. |
| |
|
|
|
|
In your opinion, which of the following numerical estimates best indicates the overall cost that has been expended (in present-value terms) on your building for the Initial Build, Maintenance and Utilities over the first 15-year period of its life. |
| |
|
|
|
|
In your opinion, which of the following numerical estimates best indicates the overall cost that has been expended (in present-value terms) on your building for the Initial Build, Maintenance and Utilities over the first 20-year period of its life. |
| |
|
|
|
|
In your opinion, which of the following numerical estimates best indicates the overall cost that has been expended (in present-value terms) on your building for the Initial Build, Maintenance and Utilities over the first 25-year period of its life. |
| |
|
|
|
|
Given the option selected does the sum of $1, 219,977 provide a fair estimate of the capital cost of your building? |
| |
|
|
|
|
Given the option selected. does the sum of $8,760 provide a fair estimate of the Annual Maintenance cost of your building? |
| |
|
|
|
|
Given the option selected, does the sum of $83, 901 provide a fair estimation of the annual cost for Electrical and Gas Energy Usage for your building |
| |
|
|
|
|
Could you please indicate the number of years since your building has been erected or underwent a major refurbishment (i.e. up to 50% of the cost required for a new-build) to the nearest 5-year period. Please select the earlier year if in-between ranges |
| |
|
|
|
|
In your opinion, which of the following numerical estimates best indicates the overall cost that has been expended (in present-value terms) on your building for the Initial Build, Maintenance and Utilities over the first 5-year period of its life. |
| |
|
|
|
|
In your opinion, which of the following numerical estimates best indicates the overall cost that has been expended (in present-value terms) on your building for the Initial Build, Maintenance and Utilities over the first 10-year period of its life. |
| |
|
|
|
|
In your opinion, which of the following numerical estimates best indicates the overall cost that has been expended (in present-value terms) on your building for the Initial Build, Maintenance and Utilities over the first 15-year period of its life. |
| |
|
|
|
|
In your opinion, which of the following numerical estimates best indicates the overall cost that has been expended (in present-value terms) on your building for the Initial Build, Maintenance and Utilities over the first 20-year period of its life. |
| |
|
|
|
|
In your opinion, which of the following numerical estimates best indicates the overall cost that has been expended (in present-value terms) on your building for the Initial Build, Maintenance and Utilities over the first 25-year period of its life. |
| |
|
|
|
|
Given the option selected does the sum of $1, 403, 273 provide a fair estimate of the capital cost of your building? |
| |
|
|
|
|
Given the option selected. does the sum of $4,206 provide a fair estimate of the Annual Maintenance cost of your building? |
| |
|
|
|
|
Given the option selected, does the sum of $83, 901 provide a fair estimation of the annual cost for Electrical and Gas Energy Usage for your building |
| |
|
|
|
|
Could you please indicate the number of years since your building has been erected or underwent a major refurbishment (i.e. up to 50% of the cost required for a new-build) to the nearest 5-year period. Please select the earlier year if in-between ranges |
| |
|
|
|
|
In your opinion, which of the following numerical estimates best indicates the overall cost that has been expended (in present-value terms) on your building for the Initial Build, Maintenance and Utilities over the first 5-year period of its life. |
| |
|
|
|
|
In your opinion, which of the following numerical estimates best indicates the overall cost that has been expended (in present-value terms) on your building for the Initial Build, Maintenance and Utilities over the first 10-year period of its life. |
| |
|
|
|
|
In your opinion, which of the following numerical estimates best indicates the overall cost that has been expended (in present-value terms) on your building for the Initial Build, Maintenance and Utilities over the first 15-year period of its life. |
| |
|
|
|
|
In your opinion, which of the following numerical estimates best indicates the overall cost that has been expended (in present-value terms) on your building for the Initial Build, Maintenance and Utilities over the first 20-year period of its life. |
| |
|
|
|
|
In your opinion, which of the following numerical estimates best indicates the overall cost that has been expended (in present-value terms) on your building for the Initial Build, Maintenance and Utilities over the first 25-year period of its life. |
| |
|
|
|
|
Given the option selected does the sum of $1, 398, 186 provide a fair estimate of the capital cost of your building? |
| |
|
|
|
|
Given the option selected. does the sum of $16,142 provide a fair estimate of the Annual Maintenance cost of your building? |
| |
|
|
|
|
Given the option selected, does the sum of $92, 396 provide a fair estimation of the annual cost for Electrical and Gas Energy Usage for your building |
| |
|
|
|
|
Could you please indicate the number of years since your building has been erected or underwent a major refurbishment (i.e. up to 50% of the cost required for a new-build) to the nearest 5-year period. Please select the earlier year if in-between ranges |
| |
|
|
|
|
In your opinion, which of the following numerical estimates best indicates the overall cost that has been expended (in present-value terms) on your building for the Initial Build, Maintenance and Utilities over the first 5-year period of its life. |
| |
|
|
|
|
In your opinion, which of the following numerical estimates best indicates the overall cost that has been expended (in present-value terms) on your building for the Initial Build, Maintenance and Utilities over the first 10-year period of its life. |
| |
|
|
|
|
In your opinion, which of the following numerical estimates best indicates the overall cost that has been expended (in present-value terms) on your building for the Initial Build, Maintenance and Utilities over the first 15-year period of its life. |
| |
|
|
|
|
In your opinion, which of the following numerical estimates best indicates the overall cost that has been expended (in present-value terms) on your building for the Initial Build, Maintenance and Utilities over the first 20-year period of its life. |
| |
|
|
|
|
In your opinion, which of the following numerical estimates best indicates the overall cost that has been expended (in present-value terms) on your building for the Initial Build, Maintenance and Utilities over the first 25-year period of its life. |
| |
|
|
|
|
Given the option selected does the sum of $1, 387, 798 provide a fair estimate of the capital cost of your building? |
| |
|
|
|
|
Given the option selected. does the sum of $8,760 provide a fair estimate of the Annual Maintenance cost of your building? |
| |
|
|
|
|
Given the option selected, does the sum of $69, 380 provide a fair estimation of the annual cost for Electrical and Gas Energy Usage for your building |
| |
|
|
|
|
Could you please indicate the number of years since your building has been erected or underwent a major refurbishment (i.e. up to 50% of the cost required for a new-build) to the nearest 5-year period. Please select the earlier year if in-between ranges |
| |
|
|
|
|
In your opinion, which of the following numerical estimates best indicates the overall cost that has been expended (in present-value terms) on your building for the Initial Build, Maintenance and Utilities over the first 5-year period of its life. |
| |
|
|
|
|
In your opinion, which of the following numerical estimates best indicates the overall cost that has been expended (in present-value terms) on your building for the Initial Build, Maintenance and Utilities over the first 10-year period of its life. |
| |
|
|
|
|
In your opinion, which of the following numerical estimates best indicates the overall cost that has been expended (in present-value terms) on your building for the Initial Build, Maintenance and Utilities over the first 15-year period of its life. |
| |
|
|
|
|
In your opinion, which of the following numerical estimates best indicates the overall cost that has been expended (in present-value terms) on your building for the Initial Build, Maintenance and Utilities over the first 20-year period of its life. |
| |
|
|
|
|
In your opinion, which of the following numerical estimates best indicates the overall cost that has been expended (in present-value terms) on your building for the Initial Build, Maintenance and Utilities over the first 25-year period of its life. |
| |
|
|
|
|
Given the option selected does the sum of $1, 571, 094 provide a fair estimate of the capital cost of your building? |
| |
|
|
|
|
Given the option selected. does the sum of $4,206 provide a fair estimate of the Annual Maintenance cost of your building? |
| |
|
|
|
|
Given the option selected, does the sum of $61, 504 provide a fair estimation of the annual cost for Electrical and Gas Energy Usage for your building |
| |
|
|
|
|
Could you please indicate the number of years since your building has been erected or underwent a major refurbishment (i.e. up to 50% of the cost required for a new-build) to the nearest 5-year period. Please select the earlier year if in-between ranges |
| |
|
|
|
|
In your opinion, which of the following numerical estimates best indicates the overall cost that has been expended (in present-value terms) on your building for the Initial Build, Maintenance and Utilities over the first 5-year period of its life. |
| |
|
|
|
|
In your opinion, which of the following numerical estimates best indicates the overall cost that has been expended (in present-value terms) on your building for the Initial Build, Maintenance and Utilities over the first 10-year period of its life. |
| |
|
|
|
|
In your opinion, which of the following numerical estimates best indicates the overall cost that has been expended (in present-value terms) on your building for the Initial Build, Maintenance and Utilities over the first 15-year period of its life. |
| |
|
|
|
|
In your opinion, which of the following numerical estimates best indicates the overall cost that has been expended (in present-value terms) on your building for the Initial Build, Maintenance and Utilities over the first 20-year period of its life. |
| |
|
|
|
|
In your opinion, which of the following numerical estimates best indicates the overall cost that has been expended (in present-value terms) on your building for the Initial Build, Maintenance and Utilities over the first 25-year period of its life. |
| |
|
|
|
|
Given the option selected does the sum of $1, 276, 156 provide a fair estimate of the capital cost of your building? |
| |
|
|
|
|
Given the option selected. does the sum of $17,742 provide a fair estimate of the Annual Maintenance cost of your building? |
| |
|
|
|
|
Given the option selected, does the sum of $76, 760 provide a fair estimation of the annual cost for Electrical and Gas Energy Usage for your building |
| |
|
|
|
|
Could you please indicate the number of years since your building has been erected or underwent a major refurbishment (i.e. up to 50% of the cost required for a new-build) to the nearest 5-year period. Please select the earlier year if in-between ranges |
| |
|
|
|
|
In your opinion, which of the following numerical estimates best indicates the overall cost that has been expended (in present-value terms) on your building for the Initial Build, Maintenance and Utilities over the first 5-year period of its life. |
| |
|
|
|
|
In your opinion, which of the following numerical estimates best indicates the overall cost that has been expended (in present-value terms) on your building for the Initial Build, Maintenance and Utilities over the first 10-year period of its life. |
| |
|
|
|
|
In your opinion, which of the following numerical estimates best indicates the overall cost that has been expended (in present-value terms) on your building for the Initial Build, Maintenance and Utilities over the first 15-year period of its life. |
| |
|
|
|
|
In your opinion, which of the following numerical estimates best indicates the overall cost that has been expended (in present-value terms) on your building for the Initial Build, Maintenance and Utilities over the first 20-year period of its life. |
| |
|
|
|
|
In your opinion, which of the following numerical estimates best indicates the overall cost that has been expended (in present-value terms) on your building for the Initial Build, Maintenance and Utilities over the first 25-year period of its life. |
| |
|
|
|
|
Given the option selected does the sum of $1, 284, 775 provide a fair estimate of the capital cost of your building? |
| |
|
|
|
|
Given the option selected. does the sum of $10,360 provide a fair estimate of the Annual Maintenance cost of your building? |
| |
|
|
|
|
Given the option selected, does the sum of $65, 499 provide a fair estimation of the annual cost for Electrical and Gas Energy Usage for your building |
| |
|
|
|
|
Could you please indicate the number of years since your building has been erected or underwent a major refurbishment (i.e. up to 50% of the cost required for a new-build) to the nearest 5-year period. Please select the earlier year if in-between ranges |
| |
|
|
|
|
In your opinion, which of the following numerical estimates best indicates the overall cost that has been expended (in present-value terms) on your building for the Initial Build, Maintenance and Utilities over the first 5-year period of its life. |
| |
|
|
|
|
In your opinion, which of the following numerical estimates best indicates the overall cost that has been expended (in present-value terms) on your building for the Initial Build, Maintenance and Utilities over the first 10-year period of its life. |
| |
|
|
|
|
In your opinion, which of the following numerical estimates best indicates the overall cost that has been expended (in present-value terms) on your building for the Initial Build, Maintenance and Utilities over the first 15-year period of its life. |
| |
|
|
|
|
In your opinion, which of the following numerical estimates best indicates the overall cost that has been expended (in present-value terms) on your building for the Initial Build, Maintenance and Utilities over the first 20-year period of its life. |
| |
|
|
|
|
In your opinion, which of the following numerical estimates best indicates the overall cost that has been expended (in present-value terms) on your building for the Initial Build, Maintenance and Utilities over the first 25-year period of its life. |
| |
|
|
|
|
Given the option selected does the sum of $1,468, 071 provide a fair estimate of the capital cost of your building? |
| |
|
|
|
|
Given the option selected. does the sum of $5,806 provide a fair estimate of the Annual Maintenance cost of your building? |
| |
|
|
|
|
Given the option selected, does the sum of $57, 666 provide a fair estimation of the annual cost for Electrical and Gas Energy Usage for your building |
| |
|
|
|
|
Could you please indicate the number of years since your building has been erected or underwent a major refurbishment (i.e. up to 50% of the cost required for a new-build) to the nearest 5-year period. Please select the earlier year if in-between ranges |
| |
|
|
|
|
In your opinion, which of the following numerical estimates best indicates the overall cost that has been expended (in present-value terms) on your building for the Initial Build, Maintenance and Utilities over the first 5-year period of its life. |
| |
|
|
|
|
In your opinion, which of the following numerical estimates best indicates the overall cost that has been expended (in present-value terms) on your building for the Initial Build, Maintenance and Utilities over the first 10-year period of its life. |
| |
|
|
|
|
In your opinion, which of the following numerical estimates best indicates the overall cost that has been expended (in present-value terms) on your building for the Initial Build, Maintenance and Utilities over the first 15-year period of its life. |
| |
|
|
|
|
In your opinion, which of the following numerical estimates best indicates the overall cost that has been expended (in present-value terms) on your building for the Initial Build, Maintenance and Utilities over the first 20-year period of its life. |
| |
|
|
|
|
In your opinion, which of the following numerical estimates best indicates the overall cost that has been expended (in present-value terms) on your building for the Initial Build, Maintenance and Utilities over the first 25-year period of its life. |
| |
|
|
|
|
Given the option selected does the sum of $1,463, 016 provide a fair estimate of the capital cost of your building? |
| |
|
|
|
|
Given the option selected. does the sum of $17,742 provide a fair estimate of the Annual Maintenance cost of your building? |
| |
|
|
|
|
Given the option selected, does the sum of $75, 864 provide a fair estimation of the annual cost for Electrical and Gas Energy Usage for your building |
| |
|
|
|
|
Could you please indicate the number of years since your building has been erected or underwent a major refurbishment (i.e. up to 50% of the cost required for a new-build) to the nearest 5-year period. Please select the earlier year if in-between ranges |
| |
|
|
|
|
In your opinion, which of the following numerical estimates best indicates the overall cost that has been expended (in present-value terms) on your building for the Initial Build, Maintenance and Utilities over the first 5-year period of its life. |
| |
|
|
|
|
In your opinion, which of the following numerical estimates best indicates the overall cost that has been expended (in present-value terms) on your building for the Initial Build, Maintenance and Utilities over the first 10-year period of its life. |
| |
|
|
|
|
In your opinion, which of the following numerical estimates best indicates the overall cost that has been expended (in present-value terms) on your building for the Initial Build, Maintenance and Utilities over the first 15-year period of its life. |
| |
|
|
|
|
In your opinion, which of the following numerical estimates best indicates the overall cost that has been expended (in present-value terms) on your building for the Initial Build, Maintenance and Utilities over the first 20-year period of its life. |
| |
|
|
|
|
In your opinion, which of the following numerical estimates best indicates the overall cost that has been expended (in present-value terms) on your building for the Initial Build, Maintenance and Utilities over the first 25-year period of its life. |
| |
|
|
|
|
Given the option selected does the sum of $1,509, 635 provide a fair estimate of the capital cost of your building? |
| |
|
|
|
|
Given the option selected. does the sum of $10,360 provide a fair estimate of the Annual Maintenance cost of your building? |
| |
|
|
|
|
Given the option selected, does the sum of $57, 126 provide a fair estimation of the annual cost for Electrical and Gas Energy Usage for your building |
| |
|
|
|
|
Could you please indicate the number of years since your building has been erected or underwent a major refurbishment (i.e. up to 50% of the cost required for a new-build) to the nearest 5-year period. Please select the earlier year if in-between ranges |
| |
|
|
|
|
In your opinion, which of the following numerical estimates best indicates the overall cost that has been expended (in present-value terms) on your building for the Initial Build, Maintenance and Utilities over the first 5-year period of its life. |
| |
|
|
|
|
In your opinion, which of the following numerical estimates best indicates the overall cost that has been expended (in present-value terms) on your building for the Initial Build, Maintenance and Utilities over the first 10-year period of its life. |
| |
|
|
|
|
In your opinion, which of the following numerical estimates best indicates the overall cost that has been expended (in present-value terms) on your building for the Initial Build, Maintenance and Utilities over the first 15-year period of its life. |
| |
|
|
|
|
In your opinion, which of the following numerical estimates best indicates the overall cost that has been expended (in present-value terms) on your building for the Initial Build, Maintenance and Utilities over the first 20-year period of its life. |
| |
|
|
|
|
In your opinion, which of the following numerical estimates best indicates the overall cost that has been expended (in present-value terms) on your building for the Initial Build, Maintenance and Utilities over the first 25-year period of its life. |
| |
|
|
|
|
Given the option selected does the sum of $1,692, 931 provide a fair estimate of the capital cost of your building? |
| |
|
|
|
|
Given the option selected. does the sum of $5,806 provide a fair estimate of the Annual Maintenance cost of your building? |
| |
|
|
|
|
Given the option selected, does the sum of $52,873 provide a fair estimation of the annual cost for Electrical and Gas Energy Usage for your building |
| |
|
|
|
|
Could you please indicate the number of years since your building has been erected or underwent a major refurbishment (i.e. up to 50% of the cost required for a new-build) to the nearest 5-year period. Please select the earlier year if in-between ranges |
| |
|
|
|
|
In your opinion, which of the following numerical estimates best indicates the overall cost that has been expended (in present-value terms) on your building for the Initial Build, Maintenance and Utilities over the first 5-year period of its life. |
| |
|
|
|
|
In your opinion, which of the following numerical estimates best indicates the overall cost that has been expended (in present-value terms) on your building for the Initial Build, Maintenance and Utilities over the first 10-year period of its life. |
| |
|
|
|
|
In your opinion, which of the following numerical estimates best indicates the overall cost that has been expended (in present-value terms) on your building for the Initial Build, Maintenance and Utilities over the first 15-year period of its life. |
| |
|
|
|
|
In your opinion, which of the following numerical estimates best indicates the overall cost that has been expended (in present-value terms) on your building for the Initial Build, Maintenance and Utilities over the first 20-year period of its life. |
| |
|
|
|
|
In your opinion, which of the following numerical estimates best indicates the overall cost that has been expended (in present-value terms) on your building for the Initial Build, Maintenance and Utilities over the first 25-year period of its life. |
| |
|
|
|
|
Given the option selected does the sum of $1,218, 549 provide a fair estimate of the capital cost of your building? |
| |
|
|
|
|
Given the option selected. does the sum of $16,142 provide a fair estimate of the Annual Maintenance cost of your building? |
| |
|
|
|
|
Given the option selected, does the sum of $92,472 provide a fair estimation of the annual cost for Electrical and Gas Energy Usage for your building |
| |
|
|
|
|
Could you please indicate the number of years since your building has been erected or underwent a major refurbishment (i.e. up to 50% of the cost required for a new-build) to the nearest 5-year period. Please select the earlier year if in-between ranges |
| |
|
|
|
|
In your opinion, which of the following numerical estimates best indicates the overall cost that has been expended (in present-value terms) on your building for the Initial Build, Maintenance and Utilities over the first 5-year period of its life. |
| |
|
|
|
|
In your opinion, which of the following numerical estimates best indicates the overall cost that has been expended (in present-value terms) on your building for the Initial Build, Maintenance and Utilities over the first 10-year period of its life. |
| |
|
|
|
|
In your opinion, which of the following numerical estimates best indicates the overall cost that has been expended (in present-value terms) on your building for the Initial Build, Maintenance and Utilities over the first 15-year period of its life. |
| |
|
|
|
|
In your opinion, which of the following numerical estimates best indicates the overall cost that has been expended (in present-value terms) on your building for the Initial Build, Maintenance and Utilities over the first 20-year period of its life. |
| |
|
|
|
|
In your opinion, which of the following numerical estimates best indicates the overall cost that has been expended (in present-value terms) on your building for the Initial Build, Maintenance and Utilities over the first 25-year period of its life. |
| |
|
|
|
|
Given the option selected does the sum of $1,279, 633 provide a fair estimate of the capital cost of your building? |
| |
|
|
|
|
Given the option selected. does the sum of $16,142 provide a fair estimate of the Annual Maintenance cost of your building? |
| |
|
|
|
|
Given the option selected, does the sum of $92,370 provide a fair estimation of the annual cost for Electrical and Gas Energy Usage for your building |
| |
|
|
|
|
Could you please indicate the number of years since your building has been erected or underwent a major refurbishment (i.e. up to 50% of the cost required for a new-build) to the nearest 5-year period. Please select the earlier year if in-between ranges |
| |
|
|
|
|
In your opinion, which of the following numerical estimates best indicates the overall cost that has been expended (in present-value terms) on your building for the Initial Build, Maintenance and Utilities over the first 5-year period of its life. |
| |
|
|
|
|
In your opinion, which of the following numerical estimates best indicates the overall cost that has been expended (in present-value terms) on your building for the Initial Build, Maintenance and Utilities over the first 10-year period of its life. |
| |
|
|
|
|
In your opinion, which of the following numerical estimates best indicates the overall cost that has been expended (in present-value terms) on your building for the Initial Build, Maintenance and Utilities over the first 15-year period of its life. |
| |
|
|
|
|
In your opinion, which of the following numerical estimates best indicates the overall cost that has been expended (in present-value terms) on your building for the Initial Build, Maintenance and Utilities over the first 20-year period of its life. |
| |
|
|
|
|
In your opinion, which of the following numerical estimates best indicates the overall cost that has been expended (in present-value terms) on your building for the Initial Build, Maintenance and Utilities over the first 25-year period of its life. |
| |
|
|
|
|
Given the option selected does the sum of $1,485, 799 provide a fair estimate of the capital cost of your building? |
| |
|
|
|
|
Given the option selected. does the sum of $8,760 provide a fair estimate of the Annual Maintenance cost of your building? |
| |
|
|
|
|
Given the option selected, does the sum of $56,965 provide a fair estimation of the annual cost for Electrical and Gas Energy Usage for your building |
| |
|
|
|
|
Could you please indicate the number of years since your building has been erected or underwent a major refurbishment (i.e. up to 50% of the cost required for a new-build) to the nearest 5-year period. Please select the earlier year if in-between ranges |
| |
|
|
|
|
In your opinion, which of the following numerical estimates best indicates the overall cost that has been expended (in present-value terms) on your building for the Initial Build, Maintenance and Utilities over the first 5-year period of its life. |
| |
|
|
|
|
In your opinion, which of the following numerical estimates best indicates the overall cost that has been expended (in present-value terms) on your building for the Initial Build, Maintenance and Utilities over the first 10-year period of its life. |
| |
|
|
|
|
In your opinion, which of the following numerical estimates best indicates the overall cost that has been expended (in present-value terms) on your building for the Initial Build, Maintenance and Utilities over the first 15-year period of its life. |
| |
|
|
|
|
In your opinion, which of the following numerical estimates best indicates the overall cost that has been expended (in present-value terms) on your building for the Initial Build, Maintenance and Utilities over the first 20-year period of its life. |
| |
|
|
|
|
In your opinion, which of the following numerical estimates best indicates the overall cost that has been expended (in present-value terms) on your building for the Initial Build, Maintenance and Utilities over the first 25-year period of its life. |
| |
|
|
|
|
Given the option selected does the sum of $1,507, 660 provide a fair estimate of the capital cost of your building? |
| |
|
|
|
|
Given the option selected. does the sum of $8,760 provide a fair estimate of the Annual Maintenance cost of your building? |
| |
|
|
|
|
Given the option selected, does the sum of $69,185 provide a fair estimation of the annual cost for Electrical and Gas Energy Usage for your building |
| |
|
|
|
|
Could you please indicate the number of years since your building has been erected or underwent a major refurbishment (i.e. up to 50% of the cost required for a new-build) to the nearest 5-year period. Please select the earlier year if in-between ranges |
| |
|
|
|
|
In your opinion, which of the following numerical estimates best indicates the overall cost that has been expended (in present-value terms) on your building for the Initial Build, Maintenance and Utilities over the first 5-year period of its life. |
| |
|
|
|
|
In your opinion, which of the following numerical estimates best indicates the overall cost that has been expended (in present-value terms) on your building for the Initial Build, Maintenance and Utilities over the first 10-year period of its life. |
| |
|
|
|
|
In your opinion, which of the following numerical estimates best indicates the overall cost that has been expended (in present-value terms) on your building for the Initial Build, Maintenance and Utilities over the first 15-year period of its life. |
| |
|
|
|
|
In your opinion, which of the following numerical estimates best indicates the overall cost that has been expended (in present-value terms) on your building for the Initial Build, Maintenance and Utilities over the first 20-year period of its life. |
| |
|
|
|
|
In your opinion, which of the following numerical estimates best indicates the overall cost that has been expended (in present-value terms) on your building for the Initial Build, Maintenance and Utilities over the first 25-year period of its life. |
| |
|
|
|
|
Given the option selected does the sum of $1,690,956 provide a fair estimate of the capital cost of your building? |
| |
|
|
|
|
Given the option selected. does the sum of $4,206 provide a fair estimate of the Annual Maintenance cost of your building? |
| |
|
|
|
|
Given the option selected, does the sum of $61,309 provide a fair estimation of the annual cost for Electrical and Gas Energy Usage for your building |
| |
|
|
|
|
Could you please indicate the number of years since your building has been erected or underwent a major refurbishment (i.e. up to 50% of the cost required for a new-build) to the nearest 5-year period. Please select the earlier year if in-between ranges |
| |
|
|
|
|
In your opinion, which of the following numerical estimates best indicates the overall cost that has been expended (in present-value terms) on your building for the Initial Build, Maintenance and Utilities over the first 5-year period of its life. |
| |
|
|
|
|
In your opinion, which of the following numerical estimates best indicates the overall cost that has been expended (in present-value terms) on your building for the Initial Build, Maintenance and Utilities over the first 10-year period of its life. |
| |
|
|
|
|
In your opinion, which of the following numerical estimates best indicates the overall cost that has been expended (in present-value terms) on your building for the Initial Build, Maintenance and Utilities over the first 15-year period of its life. |
| |
|
|
|
|
In your opinion, which of the following numerical estimates best indicates the overall cost that has been expended (in present-value terms) on your building for the Initial Build, Maintenance and Utilities over the first 20-year period of its life. |
| |
|
|
|
|
In your opinion, which of the following numerical estimates best indicates the overall cost that has been expended (in present-value terms) on your building for the Initial Build, Maintenance and Utilities over the first 25-year period of its life. |
| |
|
|
|
|
Given the option selected does the sum of $1,621,235 provide a fair estimate of the capital cost of your building? |
| |
|
|
|
|
Given the option selected. does the sum of $10,360 provide a fair estimate of the Annual Maintenance cost of your building? |
| |
|
|
|
|
Given the option selected, does the sum of $65,861 provide a fair estimation of the annual cost for Electrical and Gas Energy Usage for your building |
| |
|
|
|
|
Could you please indicate the number of years since your building has been erected or underwent a major refurbishment (i.e. up to 50% of the cost required for a new-build) to the nearest 5-year period. Please select the earlier year if in-between ranges |
| |
|
|
|
|
In your opinion, which of the following numerical estimates best indicates the overall cost that has been expended (in present-value terms) on your building for the Initial Build, Maintenance and Utilities over the first 5-year period of its life. |
| |
|
|
|
|
In your opinion, which of the following numerical estimates best indicates the overall cost that has been expended (in present-value terms) on your building for the Initial Build, Maintenance and Utilities over the first 10-year period of its life. |
| |
|
|
|
|
In your opinion, which of the following numerical estimates best indicates the overall cost that has been expended (in present-value terms) on your building for the Initial Build, Maintenance and Utilities over the first 15-year period of its life. |
| |
|
|
|
|
In your opinion, which of the following numerical estimates best indicates the overall cost that has been expended (in present-value terms) on your building for the Initial Build, Maintenance and Utilities over the first 20-year period of its life. |
| |
|
|
|
|
In your opinion, which of the following numerical estimates best indicates the overall cost that has been expended (in present-value terms) on your building for the Initial Build, Maintenance and Utilities over the first 25-year period of its life. |
| |
|
|
|
|
Given the option selected does the sum of $1,804,531 provide a fair estimate of the capital cost of your building? |
| |
|
|
|
|
Given the option selected. does the sum of $5,806 provide a fair estimate of the Annual Maintenance cost of your building? |
| |
|
|
|
|
Given the option selected, does the sum of $55,494 provide a fair estimation of the annual cost for Electrical and Gas Energy Usage for your building |
| |
|
|
|
|
Could you please indicate the number of years since your building has been erected or underwent a major refurbishment (i.e. up to 50% of the cost required for a new-build) to the nearest 5-year period. Please select the earlier year if in-between ranges |
| |
|
|
|
|
In your opinion, which of the following numerical estimates best indicates the overall cost that has been expended (in present-value terms) on your building for the Initial Build, Maintenance and Utilities over the first 5-year period of its life. |
| |
|
|
|
|
In your opinion, which of the following numerical estimates best indicates the overall cost that has been expended (in present-value terms) on your building for the Initial Build, Maintenance and Utilities over the first 10-year period of its life. |
| |
|
|
|
|
In your opinion, which of the following numerical estimates best indicates the overall cost that has been expended (in present-value terms) on your building for the Initial Build, Maintenance and Utilities over the first 15-year period of its life. |
| |
|
|
|
|
In your opinion, which of the following numerical estimates best indicates the overall cost that has been expended (in present-value terms) on your building for the Initial Build, Maintenance and Utilities over the first 20-year period of its life. |
| |
|
|
|
|
In your opinion, which of the following numerical estimates best indicates the overall cost that has been expended (in present-value terms) on your building for the Initial Build, Maintenance and Utilities over the first 25-year period of its life. |
| |
|
|
|
|
Given the option selected does the sum of $2,024,721 provide a fair estimate of the capital cost of your building? |
| |
|
|
|
|
Given the option selected. does the sum of $8,760 provide a fair estimate of the Annual Maintenance cost of your building? |
| |
|
|
|
|
Given the option selected, does the sum of $55,015 provide a fair estimation of the annual cost for Electrical and Gas Energy Usage for your building |
| |
|
|
|
|
Could you please indicate the number of years since your building has been erected or underwent a major refurbishment (i.e. up to 50% of the cost required for a new-build) to the nearest 5-year period. Please select the earlier year if in-between ranges |
| |
|
|
|
|
In your opinion, which of the following numerical estimates best indicates the overall cost that has been expended (in present-value terms) on your building for the Initial Build, Maintenance and Utilities over the first 5-year period of its life. |
| |
|
|
|
|
In your opinion, which of the following numerical estimates best indicates the overall cost that has been expended (in present-value terms) on your building for the Initial Build, Maintenance and Utilities over the first 10-year period of its life. |
| |
|
|
|
|
In your opinion, which of the following numerical estimates best indicates the overall cost that has been expended (in present-value terms) on your building for the Initial Build, Maintenance and Utilities over the first 15-year period of its life. |
| |
|
|
|
|
In your opinion, which of the following numerical estimates best indicates the overall cost that has been expended (in present-value terms) on your building for the Initial Build, Maintenance and Utilities over the first 20-year period of its life. |
| |
|
|
|
|
In your opinion, which of the following numerical estimates best indicates the overall cost that has been expended (in present-value terms) on your building for the Initial Build, Maintenance and Utilities over the first 25-year period of its life. |
| |
|
|
|
|
Given the option selected does the sum of $2,221,501 provide a fair estimate of the capital cost of your building? |
| |
|
|
|
|
Given the option selected. does the sum of $8,760 provide a fair estimate of the Annual Maintenance cost of your building? |
| |
|
|
|
|
Given the option selected, does the sum of $63,298 provide a fair estimation of the annual cost for Electrical and Gas Energy Usage for your building |
| |
|
|
|
|
Could you please indicate the number of years since your building has been erected or underwent a major refurbishment (i.e. up to 50% of the cost required for a new-build) to the nearest 5-year period. Please select the earlier year if in-between ranges |
| |
|
|
|
|
In your opinion, which of the following numerical estimates best indicates the overall cost that has been expended (in present-value terms) on your building for the Initial Build, Maintenance and Utilities over the first 5-year period of its life. |
| |
|
|
|
|
In your opinion, which of the following numerical estimates best indicates the overall cost that has been expended (in present-value terms) on your building for the Initial Build, Maintenance and Utilities over the first 10-year period of its life. |
| |
|
|
|
|
In your opinion, which of the following numerical estimates best indicates the overall cost that has been expended (in present-value terms) on your building for the Initial Build, Maintenance and Utilities over the first 15-year period of its life. |
| |
|
|
|
|
In your opinion, which of the following numerical estimates best indicates the overall cost that has been expended (in present-value terms) on your building for the Initial Build, Maintenance and Utilities over the first 20-year period of its life. |
| |
|
|
|
|
In your opinion, which of the following numerical estimates best indicates the overall cost that has been expended (in present-value terms) on your building for the Initial Build, Maintenance and Utilities over the first 25-year period of its life. |
| |
|
|
|
|
Given the option selected does the sum of $2,404,797 provide a fair estimate of the capital cost of your building? |
| |
|
|
|
|
Given the option selected. does the sum of $4,206 provide a fair estimate of the Annual Maintenance cost of your building? |
| |
|
|
|
|
Given the option selected, does the sum of $55,422 provide a fair estimation of the annual cost for Electrical and Gas Energy Usage for your building |
| |
|
|
|
|
Could you please indicate the number of years since your building has been erected or underwent a major refurbishment (i.e. up to 50% of the cost required for a new-build) to the nearest 5-year period. Please select the earlier year if in-between ranges |
| |
|
|
|
|
In your opinion, which of the following numerical estimates best indicates the overall cost that has been expended (in present-value terms) on your building for the Initial Build, Maintenance and Utilities over the first 5-year period of its life. |
| |
|
|
|
|
In your opinion, which of the following numerical estimates best indicates the overall cost that has been expended (in present-value terms) on your building for the Initial Build, Maintenance and Utilities over the first 10-year period of its life. |
| |
|
|
|
|
In your opinion, which of the following numerical estimates best indicates the overall cost that has been expended (in present-value terms) on your building for the Initial Build, Maintenance and Utilities over the first 15-year period of its life. |
| |
|
|
|
|
In your opinion, which of the following numerical estimates best indicates the overall cost that has been expended (in present-value terms) on your building for the Initial Build, Maintenance and Utilities over the first 20-year period of its life. |
| |
|
|
|
|
In your opinion, which of the following numerical estimates best indicates the overall cost that has been expended (in present-value terms) on your building for the Initial Build, Maintenance and Utilities over the first 25-year period of its life. |
| |
|
|
|
|
Given the option selected does the sum of $2,325,494 provide a fair estimate of the capital cost of your building? |
| |
|
|
|
|
Given the option selected. does the sum of $10,360 provide a fair estimate of the Annual Maintenance cost of your building? |
| |
|
|
|
|
Given the option selected, does the sum of $52,666 provide a fair estimation of the annual cost for Electrical and Gas Energy Usage for your building |
| |
|
|
|
|
Could you please indicate the number of years since your building has been erected or underwent a major refurbishment (i.e. up to 50% of the cost required for a new-build) to the nearest 5-year period. Please select the earlier year if in-between ranges |
| |
|
|
|
|
In your opinion, which of the following numerical estimates best indicates the overall cost that has been expended (in present-value terms) on your building for the Initial Build, Maintenance and Utilities over the first 5-year period of its life. |
| |
|
|
|
|
In your opinion, which of the following numerical estimates best indicates the overall cost that has been expended (in present-value terms) on your building for the Initial Build, Maintenance and Utilities over the first 10-year period of its life. |
| |
|
|
|
|
In your opinion, which of the following numerical estimates best indicates the overall cost that has been expended (in present-value terms) on your building for the Initial Build, Maintenance and Utilities over the first 15-year period of its life. |
| |
|
|
|
|
In your opinion, which of the following numerical estimates best indicates the overall cost that has been expended (in present-value terms) on your building for the Initial Build, Maintenance and Utilities over the first 20-year period of its life. |
| |
|
|
|
|
In your opinion, which of the following numerical estimates best indicates the overall cost that has been expended (in present-value terms) on your building for the Initial Build, Maintenance and Utilities over the first 25-year period of its life. |
| |
|
|
|
|
Given the option selected does the sum of $2,508,790 provide a fair estimate of the capital cost of your building? |
| |
|
|
|
|
Given the option selected. does the sum of $5,806 provide a fair estimate of the Annual Maintenance cost of your building? |
| |
|
|
|
|
Given the option selected, does the sum of $48,413 provide a fair estimation of the annual cost for Electrical and Gas Energy Usage for your building |
| |
|
|
|
|
Could you please indicate the number of years since your building has been erected or underwent a major refurbishment (i.e. up to 50% of the cost required for a new-build) to the nearest 5-year period. Please select the earlier year if in-between ranges |
| |
|
|
|
|
In your opinion, which of the following numerical estimates best indicates the overall cost that has been expended (in present-value terms) on your building for the Initial Build, Maintenance and Utilities over the first 5-year period of its life. |
| |
|
|
|
|
In your opinion, which of the following numerical estimates best indicates the overall cost that has been expended (in present-value terms) on your building for the Initial Build, Maintenance and Utilities over the first 10-year period of its life. |
| |
|
|
|
|
In your opinion, which of the following numerical estimates best indicates the overall cost that has been expended (in present-value terms) on your building for the Initial Build, Maintenance and Utilities over the first 15-year period of its life. |
| |
|
|
|
|
In your opinion, which of the following numerical estimates best indicates the overall cost that has been expended (in present-value terms) on your building for the Initial Build, Maintenance and Utilities over the first 20-year period of its life. |
| |
|
|
|
|
In your opinion, which of the following numerical estimates best indicates the overall cost that has been expended (in present-value terms) on your building for the Initial Build, Maintenance and Utilities over the first 25-year period of its life. |
| |
|
|
|
|
Given the option selected does the sum of $1,383,207 provide a fair estimate of the capital cost of your building? |
| |
|
|
|
|
Given the option selected. does the sum of $8,760 provide a fair estimate of the Annual Maintenance cost of your building? |
| |
|
|
|
|
Given the option selected, does the sum of $76,609 provide a fair estimation of the annual cost for Electrical and Gas Energy Usage for your building |
| |
|
|
|
|
Could you please indicate the number of years since your building has been erected or underwent a major refurbishment (i.e. up to 50% of the cost required for a new-build) to the nearest 5-year period. Please select the earlier year if in-between ranges |
| |
|
|
|
|
In your opinion, which of the following numerical estimates best indicates the overall cost that has been expended (in present-value terms) on your building for the Initial Build, Maintenance and Utilities over the first 5-year period of its life. |
| |
|
|
|
|
In your opinion, which of the following numerical estimates best indicates the overall cost that has been expended (in present-value terms) on your building for the Initial Build, Maintenance and Utilities over the first 10-year period of its life. |
| |
|
|
|
|
In your opinion, which of the following numerical estimates best indicates the overall cost that has been expended (in present-value terms) on your building for the Initial Build, Maintenance and Utilities over the first 15-year period of its life. |
| |
|
|
|
|
In your opinion, which of the following numerical estimates best indicates the overall cost that has been expended (in present-value terms) on your building for the Initial Build, Maintenance and Utilities over the first 20-year period of its life. |
| |
|
|
|
|
In your opinion, which of the following numerical estimates best indicates the overall cost that has been expended (in present-value terms) on your building for the Initial Build, Maintenance and Utilities over the first 25-year period of its life. |
| |
|
|
|
|
Given the option selected does the sum of $1,515,868 provide a fair estimate of the capital cost of your building? |
| |
|
|
|
|
Given the option selected. does the sum of $8,760 provide a fair estimate of the Annual Maintenance cost of your building? |
| |
|
|
|
|
Given the option selected, does the sum of $85,297 provide a fair estimation of the annual cost for Electrical and Gas Energy Usage for your building |
| |
|
|
|
|
Could you please indicate the number of years since your building has been erected or underwent a major refurbishment (i.e. up to 50% of the cost required for a new-build) to the nearest 5-year period. Please select the earlier year if in-between ranges |
| |
|
|
|
|
In your opinion, which of the following numerical estimates best indicates the overall cost that has been expended (in present-value terms) on your building for the Initial Build, Maintenance and Utilities over the first 5-year period of its life. |
| |
|
|
|
|
In your opinion, which of the following numerical estimates best indicates the overall cost that has been expended (in present-value terms) on your building for the Initial Build, Maintenance and Utilities over the first 10-year period of its life. |
| |
|
|
|
|
In your opinion, which of the following numerical estimates best indicates the overall cost that has been expended (in present-value terms) on your building for the Initial Build, Maintenance and Utilities over the first 15-year period of its life. |
| |
|
|
|
|
In your opinion, which of the following numerical estimates best indicates the overall cost that has been expended (in present-value terms) on your building for the Initial Build, Maintenance and Utilities over the first 20-year period of its life. |
| |
|
|
|
|
In your opinion, which of the following numerical estimates best indicates the overall cost that has been expended (in present-value terms) on your building for the Initial Build, Maintenance and Utilities over the first 25-year period of its life. |
| |
|
|
|
|
Given the option selected does the sum of $1,699,164 provide a fair estimate of the capital cost of your building? |
| |
|
|
|
|
Given the option selected. does the sum of $4,206 provide a fair estimate of the Annual Maintenance cost of your building? |
| |
|
|
|
|
Given the option selected, does the sum of $74,930 provide a fair estimation of the annual cost for Electrical and Gas Energy Usage for your building |
| |
|
|
|
|
Could you please indicate the number of years since your building has been erected or underwent a major refurbishment (i.e. up to 50% of the cost required for a new-build) to the nearest 5-year period. Please select the earlier year if in-between ranges |
| |
|
|
|
|
In your opinion, which of the following numerical estimates best indicates the overall cost that has been expended (in present-value terms) on your building for the Initial Build, Maintenance and Utilities over the first 5-year period of its life. |
| |
|
|
|
|
In your opinion, which of the following numerical estimates best indicates the overall cost that has been expended (in present-value terms) on your building for the Initial Build, Maintenance and Utilities over the first 10-year period of its life. |
| |
|
|
|
|
In your opinion, which of the following numerical estimates best indicates the overall cost that has been expended (in present-value terms) on your building for the Initial Build, Maintenance and Utilities over the first 15-year period of its life. |
| |
|
|
|
|
In your opinion, which of the following numerical estimates best indicates the overall cost that has been expended (in present-value terms) on your building for the Initial Build, Maintenance and Utilities over the first 20-year period of its life. |
| |
|
|
|
|
In your opinion, which of the following numerical estimates best indicates the overall cost that has been expended (in present-value terms) on your building for the Initial Build, Maintenance and Utilities over the first 25-year period of its life. |
| |
|
|
|
|
Given the option selected does the sum of $2,370,163 provide a fair estimate of the capital cost of your building? |
| |
|
|
|
|
Given the option selected. does the sum of $4,206 provide a fair estimate of the Annual Maintenance cost of your building? |
| |
|
|
|
|
Given the option selected, does the sum of $64,914 provide a fair estimation of the annual cost for Electrical and Gas Energy Usage for your building |
| |
|
|
|
|
Could you please indicate the number of years since your building has been erected or underwent a major refurbishment (i.e. up to 50% of the cost required for a new-build) to the nearest 5-year period. Please select the earlier year if in-between ranges |
| |
|
|
|
|
In your opinion, which of the following numerical estimates best indicates the overall cost that has been expended (in present-value terms) on your building for the Initial Build, Maintenance and Utilities over the first 5-year period of its life. |
| |
|
|
|
|
In your opinion, which of the following numerical estimates best indicates the overall cost that has been expended (in present-value terms) on your building for the Initial Build, Maintenance and Utilities over the first 10-year period of its life. |
| |
|
|
|
|
In your opinion, which of the following numerical estimates best indicates the overall cost that has been expended (in present-value terms) on your building for the Initial Build, Maintenance and Utilities over the first 15-year period of its life. |
| |
|
|
|
|
In your opinion, which of the following numerical estimates best indicates the overall cost that has been expended (in present-value terms) on your building for the Initial Build, Maintenance and Utilities over the first 20-year period of its life. |
| |
|
|
|
|
In your opinion, which of the following numerical estimates best indicates the overall cost that has been expended (in present-value terms) on your building for the Initial Build, Maintenance and Utilities over the first 25-year period of its life. |
| |
|
|
|
|
Given the option selected does the sum of $2,539,190 provide a fair estimate of the capital cost of your building? |
| |
|
|
|
|
Given the option selected. does the sum of $4,206 provide a fair estimate of the Annual Maintenance cost of your building? |
| |
|
|
|
|
Given the option selected, does the sum of $93,764 provide a fair estimation of the annual cost for Electrical and Gas Energy Usage for your building |
| |
|
|
|
|
Could you please indicate the number of years since your building has been erected or underwent a major refurbishment (i.e. up to 50% of the cost required for a new-build) to the nearest 5-year period. Please select the earlier year if in-between ranges |
| |
|
|
|
|
In your opinion, which of the following numerical estimates best indicates the overall cost that has been expended (in present-value terms) on your building for the Initial Build, Maintenance and Utilities over the first 5-year period of its life. |
| |
|
|
|
|
In your opinion, which of the following numerical estimates best indicates the overall cost that has been expended (in present-value terms) on your building for the Initial Build, Maintenance and Utilities over the first 10-year period of its life. |
| |
|
|
|
|
In your opinion, which of the following numerical estimates best indicates the overall cost that has been expended (in present-value terms) on your building for the Initial Build, Maintenance and Utilities over the first 15-year period of its life. |
| |
|
|
|
|
In your opinion, which of the following numerical estimates best indicates the overall cost that has been expended (in present-value terms) on your building for the Initial Build, Maintenance and Utilities over the first 20-year period of its life. |
| |
|
|
|
|
In your opinion, which of the following numerical estimates best indicates the overall cost that has been expended (in present-value terms) on your building for the Initial Build, Maintenance and Utilities over the first 25-year period of its life. |
| |
|
|
|
|
Given the option selected does the sum of $2,539,190 provide a fair estimate of the capital cost of your building? |
| |
|
|
|
|
Given the option selected. does the sum of $4,206 provide a fair estimate of the Annual Maintenance cost of your building? |
| |
|
|
|
|
Given the option selected, does the sum of $93,764 provide a fair estimation of the annual cost for Electrical and Gas Energy Usage for your building |
| |
|
|
|
|
Could you please indicate the number of years since your building has been erected or underwent a major refurbishment (i.e. up to 50% of the cost required for a new-build) to the nearest 5-year period. Please select the earlier year if in-between ranges |
| |
|
|
|
|
In your opinion, which of the following numerical estimates best indicates the overall cost that has been expended (in present-value terms) on your building for the Initial Build, Maintenance and Utilities over the first 5-year period of its life. |
| |
|
|
|
|
In your opinion, which of the following numerical estimates best indicates the overall cost that has been expended (in present-value terms) on your building for the Initial Build, Maintenance and Utilities over the first 10-year period of its life. |
| |
|
|
|
|
In your opinion, which of the following numerical estimates best indicates the overall cost that has been expended (in present-value terms) on your building for the Initial Build, Maintenance and Utilities over the first 15-year period of its life. |
| |
|
|
|
|
In your opinion, which of the following numerical estimates best indicates the overall cost that has been expended (in present-value terms) on your building for the Initial Build, Maintenance and Utilities over the first 20-year period of its life. |
| |
|
|
|
|
In your opinion, which of the following numerical estimates best indicates the overall cost that has been expended (in present-value terms) on your building for the Initial Build, Maintenance and Utilities over the first 25-year period of its life. |
| |
|
|
|
|
Given the option selected does the sum of $1,621,235 provide a fair estimate of the capital cost of your building? |
| |
|
|
|
|
Given the option selected. does the sum of $10,360 provide a fair estimate of the Annual Maintenance cost of your building? |
| |
|
|
|
|
Given the option selected, does the sum of $65,861 provide a fair estimation of the annual cost for Electrical and Gas Energy Usage for your building |
| |
|
|
|
|
Could you please indicate the number of years since your building has been erected or underwent a major refurbishment (i.e. up to 50% of the cost required for a new-build) to the nearest 5-year period. Please select the earlier year if in-between ranges |
| |
|
|
|
|
In your opinion, which of the following numerical estimates best indicates the overall cost that has been expended (in present-value terms) on your building for the Initial Build, Maintenance and Utilities over the first 5-year period of its life. |
| |
|
|
|
|
In your opinion, which of the following numerical estimates best indicates the overall cost that has been expended (in present-value terms) on your building for the Initial Build, Maintenance and Utilities over the first 10-year period of its life. |
| |
|
|
|
|
In your opinion, which of the following numerical estimates best indicates the overall cost that has been expended (in present-value terms) on your building for the Initial Build, Maintenance and Utilities over the first 15-year period of its life. |
| |
|
|
|
|
In your opinion, which of the following numerical estimates best indicates the overall cost that has been expended (in present-value terms) on your building for the Initial Build, Maintenance and Utilities over the first 20-year period of its life. |
| |
|
|
|
|
In your opinion, which of the following numerical estimates best indicates the overall cost that has been expended (in present-value terms) on your building for the Initial Build, Maintenance and Utilities over the first 25-year period of its life. |
| |
|
|
|
|
Given the option selected does the sum of 1,804,531 provide a fair estimate of the capital cost of your building? |
| |
|
|
|
|
Given the option selected. does the sum of $5,806 provide a fair estimate of the Annual Maintenance cost of your building? |
| |
|
|
|
|
Given the option selected, does the sum of $55,494 provide a fair estimation of the annual cost for Electrical and Gas Energy Usage for your building |
| |
|
|
|
|
Could you please indicate the number of years since your building has been erected or underwent a major refurbishment (i.e. up to 50% of the cost required for a new-build) to the nearest 5-year period. Please select the earlier year if in-between ranges |
| |
|
|
|
|
In your opinion, which of the following numerical estimates best indicates the overall cost that has been expended (in present-value terms) on your building for the Initial Build, Maintenance and Utilities over the first 5-year period of its life. |
| |
|
|
|
|
In your opinion, which of the following numerical estimates best indicates the overall cost that has been expended (in present-value terms) on your building for the Initial Build, Maintenance and Utilities over the first 10-year period of its life. |
| |
|
|
|
|
In your opinion, which of the following numerical estimates best indicates the overall cost that has been expended (in present-value terms) on your building for the Initial Build, Maintenance and Utilities over the first 15-year period of its life. |
| |
|
|
|
|
In your opinion, which of the following numerical estimates best indicates the overall cost that has been expended (in present-value terms) on your building for the Initial Build, Maintenance and Utilities over the first 20-year period of its life. |
| |
|
|
|
|
In your opinion, which of the following numerical estimates best indicates the overall cost that has been expended (in present-value terms) on your building for the Initial Build, Maintenance and Utilities over the first 25-year period of its life. |
| |
|
|
|
|
Given the option selected does the sum of $2,689,837 provide a fair estimate of the capital cost of your building? |
| |
|
|
|
|
Given the option selected. does the sum of $10,360 provide a fair estimate of the Annual Maintenance cost of your building? |
| |
|
|
|
|
Given the option selected, does the sum of $58,999 provide a fair estimation of the annual cost for Electrical and Gas Energy Usage for your building |
| |
|
|
|
|
Could you please indicate the number of years since your building has been erected or underwent a major refurbishment (i.e. up to 50% of the cost required for a new-build) to the nearest 5-year period. Please select the earlier year if in-between ranges |
| |
|
|
|
|
In your opinion, which of the following numerical estimates best indicates the overall cost that has been expended (in present-value terms) on your building for the Initial Build, Maintenance and Utilities over the first 5-year period of its life. |
| |
|
|
|
|
In your opinion, which of the following numerical estimates best indicates the overall cost that has been expended (in present-value terms) on your building for the Initial Build, Maintenance and Utilities over the first 10-year period of its life. |
| |
|
|
|
|
In your opinion, which of the following numerical estimates best indicates the overall cost that has been expended (in present-value terms) on your building for the Initial Build, Maintenance and Utilities over the first 15-year period of its life. |
| |
|
|
|
|
In your opinion, which of the following numerical estimates best indicates the overall cost that has been expended (in present-value terms) on your building for the Initial Build, Maintenance and Utilities over the first 20-year period of its life. |
| |
|
|
|
|
In your opinion, which of the following numerical estimates best indicates the overall cost that has been expended (in present-value terms) on your building for the Initial Build, Maintenance and Utilities over the first 25-year period of its life. |
| |
|
|
|
|
Given the option selected does the sum of $2,606,203 provide a fair estimate of the capital cost of your building? |
| |
|
|
|
|
Given the option selected. does the sum of $8,760 provide a fair estimate of the Annual Maintenance cost of your building? |
| |
|
|
|
|
Given the option selected, does the sum of $80,522 provide a fair estimation of the annual cost for Electrical and Gas Energy Usage for your building |
| |
|
|
|
|
Could you please indicate the number of years since your building has been erected or underwent a major refurbishment (i.e. up to 50% of the cost required for a new-build) to the nearest 5-year period. Please select the earlier year if in-between ranges |
| |
|
|
|
|
In your opinion, which of the following numerical estimates best indicates the overall cost that has been expended (in present-value terms) on your building for the Initial Build, Maintenance and Utilities over the first 5-year period of its life. |
| |
|
|
|
|
In your opinion, which of the following numerical estimates best indicates the overall cost that has been expended (in present-value terms) on your building for the Initial Build, Maintenance and Utilities over the first 10-year period of its life. |
| |
|
|
|
|
In your opinion, which of the following numerical estimates best indicates the overall cost that has been expended (in present-value terms) on your building for the Initial Build, Maintenance and Utilities over the first 15-year period of its life. |
| |
|
|
|
|
In your opinion, which of the following numerical estimates best indicates the overall cost that has been expended (in present-value terms) on your building for the Initial Build, Maintenance and Utilities over the first 20-year period of its life. |
| |
|
|
|
|
In your opinion, which of the following numerical estimates best indicates the overall cost that has been expended (in present-value terms) on your building for the Initial Build, Maintenance and Utilities over the first 25-year period of its life. |
| |
|
|
|
|
Given the option selected does the sum of $3,614,542 provide a fair estimate of the capital cost of your building? |
| |
|
|
|
|
Given the option selected. does the sum of $5,806 provide a fair estimate of the Annual Maintenance cost of your building? |
| |
|
|
|
|
Given the option selected, does the sum of $48,331 provide a fair estimation of the annual cost for Electrical and Gas Energy Usage for your building |
| |
|
|
|
|
Could you please indicate the number of years since your building has been erected or underwent a major refurbishment (i.e. up to 50% of the cost required for a new-build) to the nearest 5-year period. Please select the earlier year if in-between ranges |
| |
|
|
|
|
In your opinion, which of the following numerical estimates best indicates the overall cost that has been expended (in present-value terms) on your building for the Initial Build, Maintenance and Utilities over the first 5-year period of its life. |
| |
|
|
|
|
In your opinion, which of the following numerical estimates best indicates the overall cost that has been expended (in present-value terms) on your building for the Initial Build, Maintenance and Utilities over the first 10-year period of its life. |
| |
|
|
|
|
In your opinion, which of the following numerical estimates best indicates the overall cost that has been expended (in present-value terms) on your building for the Initial Build, Maintenance and Utilities over the first 15-year period of its life. |
| |
|
|
|
|
In your opinion, which of the following numerical estimates best indicates the overall cost that has been expended (in present-value terms) on your building for the Initial Build, Maintenance and Utilities over the first 20-year period of its life. |
| |
|
|
|
|
In your opinion, which of the following numerical estimates best indicates the overall cost that has been expended (in present-value terms) on your building for the Initial Build, Maintenance and Utilities over the first 25-year period of its life. |
| |
|
|
|
|
Given the option selected does the sum of $2,561,919 provide a fair estimate of the capital cost of your building? |
| |
|
|
|
|
Given the option selected. does the sum of $8,760 provide a fair estimate of the Annual Maintenance cost of your building? |
| |
|
|
|
|
Given the option selected, does the sum of $77,279 provide a fair estimation of the annual cost for Electrical and Gas Energy Usage for your building |
| |
|
|
|
|
Could you please indicate the number of years since your building has been erected or underwent a major refurbishment (i.e. up to 50% of the cost required for a new-build) to the nearest 5-year period. Please select the earlier year if in-between ranges |
| |
|
|
|
|
In your opinion, which of the following numerical estimates best indicates the overall cost that has been expended (in present-value terms) on your building for the Initial Build, Maintenance and Utilities over the first 5-year period of its life. |
| |
|
|
|
|
In your opinion, which of the following numerical estimates best indicates the overall cost that has been expended (in present-value terms) on your building for the Initial Build, Maintenance and Utilities over the first 10-year period of its life. |
| |
|
|
|
|
In your opinion, which of the following numerical estimates best indicates the overall cost that has been expended (in present-value terms) on your building for the Initial Build, Maintenance and Utilities over the first 15-year period of its life. |
| |
|
|
|
|
In your opinion, which of the following numerical estimates best indicates the overall cost that has been expended (in present-value terms) on your building for the Initial Build, Maintenance and Utilities over the first 20-year period of its life. |
| |
|
|
|
|
In your opinion, which of the following numerical estimates best indicates the overall cost that has been expended (in present-value terms) on your building for the Initial Build, Maintenance and Utilities over the first 25-year period of its life. |
| |
|
|
|
|
Given the option selected does the sum of $3,486,624 provide a fair estimate of the capital cost of your building? |
| |
|
|
|
|
Given the option selected. does the sum of $4,206 provide a fair estimate of the Annual Maintenance cost of your building? |
| |
|
|
|
|
Given the option selected, does the sum of $66,912 provide a fair estimation of the annual cost for Electrical and Gas Energy Usage for your building |
| |
|
|
|
|
Could you please indicate the number of years since your building has been erected or underwent a major refurbishment (i.e. up to 50% of the cost required for a new-build) to the nearest 5-year period. Please select the earlier year if in-between ranges |
| |
|
|
|
|
In your opinion, which of the following numerical estimates best indicates the overall cost that has been expended (in present-value terms) on your building for the Initial Build, Maintenance and Utilities over the first 5-year period of its life. |
| |
|
|
|
|
In your opinion, which of the following numerical estimates best indicates the overall cost that has been expended (in present-value terms) on your building for the Initial Build, Maintenance and Utilities over the first 10-year period of its life. |
| |
|
|
|
|
In your opinion, which of the following numerical estimates best indicates the overall cost that has been expended (in present-value terms) on your building for the Initial Build, Maintenance and Utilities over the first 15-year period of its life. |
| |
|
|
|
|
In your opinion, which of the following numerical estimates best indicates the overall cost that has been expended (in present-value terms) on your building for the Initial Build, Maintenance and Utilities over the first 20-year period of its life. |
| |
|
|
|
|
In your opinion, which of the following numerical estimates best indicates the overall cost that has been expended (in present-value terms) on your building for the Initial Build, Maintenance and Utilities over the first 25-year period of its life. |
| |
|
|
|
|
Given the option selected does the sum of $3,486,624 provide a fair estimate of the capital cost of your building? |
| |
|
|
|
|
Given the option selected. does the sum of $4,206 provide a fair estimate of the Annual Maintenance cost of your building? |
| |
|
|
|
|
Given the option selected, does the sum of $66,912 provide a fair estimation of the annual cost for Electrical and Gas Energy Usage for your building |
| |
|
|
|
|
Could you please indicate the number of years since your building has been erected or underwent a major refurbishment (i.e. up to 50% of the cost required for a new-build) to the nearest 5-year period. Please select the earlier year if in-between ranges |
| |
|
|
|
|
In your opinion, which of the following numerical estimates best indicates the overall cost that has been expended (in present-value terms) on your building for the Initial Build, Maintenance and Utilities over the first 5-year period of its life. |
| |
|
|
|
|
In your opinion, which of the following numerical estimates best indicates the overall cost that has been expended (in present-value terms) on your building for the Initial Build, Maintenance and Utilities over the first 10-year period of its life. |
| |
|
|
|
|
In your opinion, which of the following numerical estimates best indicates the overall cost that has been expended (in present-value terms) on your building for the Initial Build, Maintenance and Utilities over the first 15-year period of its life. |
| |
|
|
|
|
In your opinion, which of the following numerical estimates best indicates the overall cost that has been expended (in present-value terms) on your building for the Initial Build, Maintenance and Utilities over the first 20-year period of its life. |
| |
|
|
|
|
In your opinion, which of the following numerical estimates best indicates the overall cost that has been expended (in present-value terms) on your building for the Initial Build, Maintenance and Utilities over the first 25-year period of its life. |
| |
|
|
|
|
Given the option selected does the sum of $1,601,495 provide a fair estimate of the capital cost of your building? |
| |
|
|
|
|
Given the option selected. does the sum of $8,760 provide a fair estimate of the Annual Maintenance cost of your building? |
| |
|
|
|
|
Given the option selected, does the sum of $67,327 provide a fair estimation of the annual cost for Electrical and Gas Energy Usage for your building |
| |
|
|
|
|
Could you please indicate the number of years since your building has been erected or underwent a major refurbishment (i.e. up to 50% of the cost required for a new-build) to the nearest 5-year period. Please select the earlier year if in-between ranges |
| |
|
|
|
|
In your opinion, which of the following numerical estimates best indicates the overall cost that has been expended (in present-value terms) on your building for the Initial Build, Maintenance and Utilities over the first 5-year period of its life. |
| |
|
|
|
|
In your opinion, which of the following numerical estimates best indicates the overall cost that has been expended (in present-value terms) on your building for the Initial Build, Maintenance and Utilities over the first 10-year period of its life. |
| |
|
|
|
|
In your opinion, which of the following numerical estimates best indicates the overall cost that has been expended (in present-value terms) on your building for the Initial Build, Maintenance and Utilities over the first 15-year period of its life. |
| |
|
|
|
|
In your opinion, which of the following numerical estimates best indicates the overall cost that has been expended (in present-value terms) on your building for the Initial Build, Maintenance and Utilities over the first 20-year period of its life. |
| |
|
|
|
|
In your opinion, which of the following numerical estimates best indicates the overall cost that has been expended (in present-value terms) on your building for the Initial Build, Maintenance and Utilities over the first 25-year period of its life. |
| |
|
|
|
|
Given the option selected does the sum of $1,932,668 provide a fair estimate of the capital cost of your building? |
| |
|
|
|
|
Given the option selected. does the sum of $4,206 provide a fair estimate of the Annual Maintenance cost of your building? |
| |
|
|
|
|
Given the option selected, does the sum of $57,419 provide a fair estimation of the annual cost for Electrical and Gas Energy Usage for your building |
| |
|
|
|
|
Could you please indicate the number of years since your building has been erected or underwent a major refurbishment (i.e. up to 50% of the cost required for a new-build) to the nearest 5-year period. Please select the earlier year if in-between ranges |
| |
|
|
|
|
In your opinion, which of the following numerical estimates best indicates the overall cost that has been expended (in present-value terms) on your building for the Initial Build, Maintenance and Utilities over the first 5-year period of its life. |
| |
|
|
|
|
In your opinion, which of the following numerical estimates best indicates the overall cost that has been expended (in present-value terms) on your building for the Initial Build, Maintenance and Utilities over the first 10-year period of its life. |
| |
|
|
|
|
In your opinion, which of the following numerical estimates best indicates the overall cost that has been expended (in present-value terms) on your building for the Initial Build, Maintenance and Utilities over the first 15-year period of its life. |
| |
|
|
|
|
In your opinion, which of the following numerical estimates best indicates the overall cost that has been expended (in present-value terms) on your building for the Initial Build, Maintenance and Utilities over the first 20-year period of its life. |
| |
|
|
|
|
In your opinion, which of the following numerical estimates best indicates the overall cost that has been expended (in present-value terms) on your building for the Initial Build, Maintenance and Utilities over the first 25-year period of its life. |
| |
|
|
|
|
Given the option selected does the sum of $1,810,318 provide a fair estimate of the capital cost of your building? |
| |
|
|
|
|
Given the option selected. does the sum of $8,760 provide a fair estimate of the Annual Maintenance cost of your building? |
| |
|
|
|
|
Given the option selected, does the sum of $69,380 provide a fair estimation of the annual cost for Electrical and Gas Energy Usage for your building |
| |
|
|
|
|
Could you please indicate the number of years since your building has been erected or underwent a major refurbishment (i.e. up to 50% of the cost required for a new-build) to the nearest 5-year period. Please select the earlier year if in-between ranges |
| |
|
|
|
|
In your opinion, which of the following numerical estimates best indicates the overall cost that has been expended (in present-value terms) on your building for the Initial Build, Maintenance and Utilities over the first 5-year period of its life. |
| |
|
|
|
|
In your opinion, which of the following numerical estimates best indicates the overall cost that has been expended (in present-value terms) on your building for the Initial Build, Maintenance and Utilities over the first 10-year period of its life. |
| |
|
|
|
|
In your opinion, which of the following numerical estimates best indicates the overall cost that has been expended (in present-value terms) on your building for the Initial Build, Maintenance and Utilities over the first 15-year period of its life. |
| |
|
|
|
|
In your opinion, which of the following numerical estimates best indicates the overall cost that has been expended (in present-value terms) on your building for the Initial Build, Maintenance and Utilities over the first 20-year period of its life. |
| |
|
|
|
|
In your opinion, which of the following numerical estimates best indicates the overall cost that has been expended (in present-value terms) on your building for the Initial Build, Maintenance and Utilities over the first 25-year period of its life. |
| |
|
|
|
|
Given the option selected does the sum of $2,188,207 provide a fair estimate of the capital cost of your building? |
| |
|
|
|
|
Given the option selected. does the sum of $5,806 provide a fair estimate of the Annual Maintenance cost of your building? |
| |
|
|
|
|
Given the option selected, does the sum of $65,861 provide a fair estimation of the annual cost for Electrical and Gas Energy Usage for your building |
| |
|
|
|
|
Could you please indicate the number of years since your building has been erected or underwent a major refurbishment (i.e. up to 50% of the cost required for a new-build) to the nearest 5-year period. Please select the earlier year if in-between ranges |
| |
|
|
|
|
In your opinion, which of the following numerical estimates best indicates the overall cost that has been expended (in present-value terms) on your building for the Initial Build, Maintenance and Utilities over the first 5-year period of its life. |
| |
|
|
|
|
In your opinion, which of the following numerical estimates best indicates the overall cost that has been expended (in present-value terms) on your building for the Initial Build, Maintenance and Utilities over the first 10-year period of its life. |
| |
|
|
|
|
In your opinion, which of the following numerical estimates best indicates the overall cost that has been expended (in present-value terms) on your building for the Initial Build, Maintenance and Utilities over the first 15-year period of its life. |
| |
|
|
|
|
In your opinion, which of the following numerical estimates best indicates the overall cost that has been expended (in present-value terms) on your building for the Initial Build, Maintenance and Utilities over the first 20-year period of its life. |
| |
|
|
|
|
In your opinion, which of the following numerical estimates best indicates the overall cost that has been expended (in present-value terms) on your building for the Initial Build, Maintenance and Utilities over the first 25-year period of its life. |
| |
|
|
|
|
Given the option selected does the sum of $2,788,473 provide a fair estimate of the capital cost of your building? |
| |
|
|
|
|
Given the option selected. does the sum of $4,206 provide a fair estimate of the Annual Maintenance cost of your building? |
| |
|
|
|
|
Given the option selected, does the sum of $63,298 provide a fair estimation of the annual cost for Electrical and Gas Energy Usage for your building |
| |
|
|
|
|
Could you please indicate the number of years since your building has been erected or underwent a major refurbishment (i.e. up to 50% of the cost required for a new-build) to the nearest 5-year period. Please select the earlier year if in-between ranges |
| |
|
|
|
|
In your opinion, which of the following numerical estimates best indicates the overall cost that has been expended (in present-value terms) on your building for the Initial Build, Maintenance and Utilities over the first 5-year period of its life. |
| |
|
|
|
|
In your opinion, which of the following numerical estimates best indicates the overall cost that has been expended (in present-value terms) on your building for the Initial Build, Maintenance and Utilities over the first 10-year period of its life. |
| |
|
|
|
|
In your opinion, which of the following numerical estimates best indicates the overall cost that has been expended (in present-value terms) on your building for the Initial Build, Maintenance and Utilities over the first 15-year period of its life. |
| |
|
|
|
|
In your opinion, which of the following numerical estimates best indicates the overall cost that has been expended (in present-value terms) on your building for the Initial Build, Maintenance and Utilities over the first 20-year period of its life. |
| |
|
|
|
|
In your opinion, which of the following numerical estimates best indicates the overall cost that has been expended (in present-value terms) on your building for the Initial Build, Maintenance and Utilities over the first 25-year period of its life. |
| |
|
|
|
|
Given the option selected does the sum of $2,082,840 provide a fair estimate of the capital cost of your building? |
| |
|
|
|
|
Given the option selected. does the sum of $4,206 provide a fair estimate of the Annual Maintenance cost of your building? |
| |
|
|
|
|
Given the option selected, does the sum of $74,930 provide a fair estimation of the annual cost for Electrical and Gas Energy Usage for your building |
| |
|
|
|
|
Could you please indicate the number of years since your building has been erected or underwent a major refurbishment (i.e. up to 50% of the cost required for a new-build) to the nearest 5-year period. Please select the earlier year if in-between ranges |
| |
|
|
|
|
In your opinion, which of the following numerical estimates best indicates the overall cost that has been expended (in present-value terms) on your building for the Initial Build, Maintenance and Utilities over the first 5-year period of its life. |
| |
|
|
|
|
In your opinion, which of the following numerical estimates best indicates the overall cost that has been expended (in present-value terms) on your building for the Initial Build, Maintenance and Utilities over the first 10-year period of its life. |
| |
|
|
|
|
In your opinion, which of the following numerical estimates best indicates the overall cost that has been expended (in present-value terms) on your building for the Initial Build, Maintenance and Utilities over the first 15-year period of its life. |
| |
|
|
|
|
In your opinion, which of the following numerical estimates best indicates the overall cost that has been expended (in present-value terms) on your building for the Initial Build, Maintenance and Utilities over the first 20-year period of its life. |
| |
|
|
|
|
In your opinion, which of the following numerical estimates best indicates the overall cost that has been expended (in present-value terms) on your building for the Initial Build, Maintenance and Utilities over the first 25-year period of its life. |
| |
|
|
|
|
Given the option selected does the sum of $2,815,712 provide a fair estimate of the capital cost of your building? |
| |
|
|
|
|
Given the option selected. does the sum of $4,206 provide a fair estimate of the Annual Maintenance cost of your building? |
| |
|
|
|
|
Given the option selected, does the sum of $64,914 provide a fair estimation of the annual cost for Electrical and Gas Energy Usage for your building |
| |
|
|
|
|
Could you please indicate the number of years since your building has been erected or underwent a major refurbishment (i.e. up to 50% of the cost required for a new-build) to the nearest 5-year period. Please select the earlier year if in-between ranges |
| |
|
|
|
|
In your opinion, which of the following numerical estimates best indicates the overall cost that has been expended (in present-value terms) on your building for the Initial Build, Maintenance and Utilities over the first 5-year period of its life. |
| |
|
|
|
|
In your opinion, which of the following numerical estimates best indicates the overall cost that has been expended (in present-value terms) on your building for the Initial Build, Maintenance and Utilities over the first 10-year period of its life. |
| |
|
|
|
|
In your opinion, which of the following numerical estimates best indicates the overall cost that has been expended (in present-value terms) on your building for the Initial Build, Maintenance and Utilities over the first 15-year period of its life. |
| |
|
|
|
|
In your opinion, which of the following numerical estimates best indicates the overall cost that has been expended (in present-value terms) on your building for the Initial Build, Maintenance and Utilities over the first 20-year period of its life. |
| |
|
|
|
|
In your opinion, which of the following numerical estimates best indicates the overall cost that has been expended (in present-value terms) on your building for the Initial Build, Maintenance and Utilities over the first 25-year period of its life. |
| |
|
|
|
|
Given the option selected does the sum of $2,043,755 provide a fair estimate of the capital cost of your building? |
| |
|
|
|
|
Given the option selected. does the sum of $10,360 provide a fair estimate of the Annual Maintenance cost of your building? |
| |
|
|
|
|
Given the option selected, does the sum of $65,861 provide a fair estimation of the annual cost for Electrical and Gas Energy Usage for your building |
| |
|
|
|
|
Could you please indicate the number of years since your building has been erected or underwent a major refurbishment (i.e. up to 50% of the cost required for a new-build) to the nearest 5-year period. Please select the earlier year if in-between ranges |
| |
|
|
|
|
In your opinion, which of the following numerical estimates best indicates the overall cost that has been expended (in present-value terms) on your building for the Initial Build, Maintenance and Utilities over the first 5-year period of its life. |
| |
|
|
|
|
In your opinion, which of the following numerical estimates best indicates the overall cost that has been expended (in present-value terms) on your building for the Initial Build, Maintenance and Utilities over the first 10-year period of its life. |
| |
|
|
|
|
In your opinion, which of the following numerical estimates best indicates the overall cost that has been expended (in present-value terms) on your building for the Initial Build, Maintenance and Utilities over the first 15-year period of its life. |
| |
|
|
|
|
In your opinion, which of the following numerical estimates best indicates the overall cost that has been expended (in present-value terms) on your building for the Initial Build, Maintenance and Utilities over the first 20-year period of its life. |
| |
|
|
|
|
In your opinion, which of the following numerical estimates best indicates the overall cost that has been expended (in present-value terms) on your building for the Initial Build, Maintenance and Utilities over the first 25-year period of its life. |
| |
|
|
|
|
Given the option selected does the sum of $3,112,358 provide a fair estimate of the capital cost of your building? |
| |
|
|
|
|
Given the option selected. does the sum of $10,360 provide a fair estimate of the Annual Maintenance cost of your building? |
| |
|
|
|
|
Given the option selected, does the sum of $58,999 provide a fair estimation of the annual cost for Electrical and Gas Energy Usage for your building |
| |
|
|
|
|
Could you please indicate the number of years since your building has been erected or underwent a major refurbishment (i.e. up to 50% of the cost required for a new-build) to the nearest 5-year period. Please select the earlier year if in-between ranges |
| |
|
|
|
|
In your opinion, which of the following numerical estimates best indicates the overall cost that has been expended (in present-value terms) on your building for the Initial Build, Maintenance and Utilities over the first 5-year period of its life. |
| |
|
|
|
|
In your opinion, which of the following numerical estimates best indicates the overall cost that has been expended (in present-value terms) on your building for the Initial Build, Maintenance and Utilities over the first 10-year period of its life. |
| |
|
|
|
|
In your opinion, which of the following numerical estimates best indicates the overall cost that has been expended (in present-value terms) on your building for the Initial Build, Maintenance and Utilities over the first 15-year period of its life. |
| |
|
|
|
|
In your opinion, which of the following numerical estimates best indicates the overall cost that has been expended (in present-value terms) on your building for the Initial Build, Maintenance and Utilities over the first 20-year period of its life. |
| |
|
|
|
|
In your opinion, which of the following numerical estimates best indicates the overall cost that has been expended (in present-value terms) on your building for the Initial Build, Maintenance and Utilities over the first 25-year period of its life. |
| |
|
|
|
|
Given the option selected does the sum of $3,028,724 provide a fair estimate of the capital cost of your building? |
| |
|
|
|
|
Given the option selected. does the sum of $8,760 provide a fair estimate of the Annual Maintenance cost of your building? |
| |
|
|
|
|
Given the option selected, does the sum of $80,522 provide a fair estimation of the annual cost for Electrical and Gas Energy Usage for your building |
| |
|
|
|
|
Could you please indicate the number of years since your building has been erected or underwent a major refurbishment (i.e. up to 50% of the cost required for a new-build) to the nearest 5-year period. Please select the earlier year if in-between ranges |
| |
|
|
|
|
In your opinion, which of the following numerical estimates best indicates the overall cost that has been expended (in present-value terms) on your building for the Initial Build, Maintenance and Utilities over the first 5-year period of its life. |
| |
|
|
|
|
In your opinion, which of the following numerical estimates best indicates the overall cost that has been expended (in present-value terms) on your building for the Initial Build, Maintenance and Utilities over the first 10-year period of its life. |
| |
|
|
|
|
In your opinion, which of the following numerical estimates best indicates the overall cost that has been expended (in present-value terms) on your building for the Initial Build, Maintenance and Utilities over the first 15-year period of its life. |
| |
|
|
|
|
In your opinion, which of the following numerical estimates best indicates the overall cost that has been expended (in present-value terms) on your building for the Initial Build, Maintenance and Utilities over the first 20-year period of its life. |
| |
|
|
|
|
In your opinion, which of the following numerical estimates best indicates the overall cost that has been expended (in present-value terms) on your building for the Initial Build, Maintenance and Utilities over the first 25-year period of its life. |
| |
|
|
|
|
Given the option selected does the sum of $3,998,219 provide a fair estimate of the capital cost of your building? |
| |
|
|
|
|
Given the option selected. does the sum of $5,806 provide a fair estimate of the Annual Maintenance cost of your building? |
| |
|
|
|
|
Given the option selected, does the sum of $48,331 provide a fair estimation of the annual cost for Electrical and Gas Energy Usage for your building |
| |
|
|
|
|
Could you please indicate the number of years since your building has been erected or underwent a major refurbishment (i.e. up to 50% of the cost required for a new-build) to the nearest 5-year period. Please select the earlier year if in-between ranges |
| |
|
|
|
|
In your opinion, which of the following numerical estimates best indicates the overall cost that has been expended (in present-value terms) on your building for the Initial Build, Maintenance and Utilities over the first 5-year period of its life. |
| |
|
|
|
|
In your opinion, which of the following numerical estimates best indicates the overall cost that has been expended (in present-value terms) on your building for the Initial Build, Maintenance and Utilities over the first 10-year period of its life. |
| |
|
|
|
|
In your opinion, which of the following numerical estimates best indicates the overall cost that has been expended (in present-value terms) on your building for the Initial Build, Maintenance and Utilities over the first 15-year period of its life. |
| |
|
|
|
|
In your opinion, which of the following numerical estimates best indicates the overall cost that has been expended (in present-value terms) on your building for the Initial Build, Maintenance and Utilities over the first 20-year period of its life. |
| |
|
|
|
|
In your opinion, which of the following numerical estimates best indicates the overall cost that has been expended (in present-value terms) on your building for the Initial Build, Maintenance and Utilities over the first 25-year period of its life. |
| |
|
|
|
|
Given the option selected does the sum of $3,211,849 provide a fair estimate of the capital cost of your building? |
| |
|
|
|
|
Given the option selected. does the sum of $8,760 provide a fair estimate of the Annual Maintenance cost of your building? |
| |
|
|
|
|
Given the option selected, does the sum of $84,021 provide a fair estimation of the annual cost for Electrical and Gas Energy Usage for your building |
| |
|
|
|
|
Could you please indicate the number of years since your building has been erected or underwent a major refurbishment (i.e. up to 50% of the cost required for a new-build) to the nearest 5-year period. Please select the earlier year if in-between ranges |
| |
|
|
|
|
In your opinion, which of the following numerical estimates best indicates the overall cost that has been expended (in present-value terms) on your building for the Initial Build, Maintenance and Utilities over the first 5-year period of its life. |
| |
|
|
|
|
In your opinion, which of the following numerical estimates best indicates the overall cost that has been expended (in present-value terms) on your building for the Initial Build, Maintenance and Utilities over the first 10-year period of its life. |
| |
|
|
|
|
In your opinion, which of the following numerical estimates best indicates the overall cost that has been expended (in present-value terms) on your building for the Initial Build, Maintenance and Utilities over the first 15-year period of its life. |
| |
|
|
|
|
In your opinion, which of the following numerical estimates best indicates the overall cost that has been expended (in present-value terms) on your building for the Initial Build, Maintenance and Utilities over the first 20-year period of its life. |
| |
|
|
|
|
In your opinion, which of the following numerical estimates best indicates the overall cost that has been expended (in present-value terms) on your building for the Initial Build, Maintenance and Utilities over the first 25-year period of its life. |
| |
|
|
|
|
Given the option selected does the sum of $3,870,300 provide a fair estimate of the capital cost of your building? |
| |
|
|
|
|
Given the option selected. does the sum of $8,760 provide a fair estimate of the Annual Maintenance cost of your building? |
| |
|
|
|
|
Given the option selected, does the sum of $84,021 provide a fair estimation of the annual cost for Electrical and Gas Energy Usage for your building |
| |
|
|
|
|
Could you please indicate the number of years since your building has been erected or underwent a major refurbishment (i.e. up to 50% of the cost required for a new-build) to the nearest 5-year period. Please select the earlier year if in-between ranges |
| |
|
|
|
|
In your opinion, which of the following numerical estimates best indicates the overall cost that has been expended (in present-value terms) on your building for the Initial Build, Maintenance and Utilities over the first 5-year period of its life. |
| |
|
|
|
|
In your opinion, which of the following numerical estimates best indicates the overall cost that has been expended (in present-value terms) on your building for the Initial Build, Maintenance and Utilities over the first 10-year period of its life. |
| |
|
|
|
|
In your opinion, which of the following numerical estimates best indicates the overall cost that has been expended (in present-value terms) on your building for the Initial Build, Maintenance and Utilities over the first 15-year period of its life. |
| |
|
|
|
|
In your opinion, which of the following numerical estimates best indicates the overall cost that has been expended (in present-value terms) on your building for the Initial Build, Maintenance and Utilities over the first 20-year period of its life. |
| |
|
|
|
|
In your opinion, which of the following numerical estimates best indicates the overall cost that has been expended (in present-value terms) on your building for the Initial Build, Maintenance and Utilities over the first 25-year period of its life. |
| |
|
|
|
|
Given the option selected does the sum of $3,870,300 provide a fair estimate of the capital cost of your building? |
| |
|
|
|
|
Given the option selected. does the sum of $8,760 provide a fair estimate of the Annual Maintenance cost of your building? |
| |
|
|
|
|
Given the option selected, does the sum of $84,021 provide a fair estimation of the annual cost for Electrical and Gas Energy Usage for your building |
| |
|
|
|
|
Could you please indicate the number of years since your building has been erected or underwent a major refurbishment (i.e. up to 50% of the cost required for a new-build) to the nearest 5-year period. Please select the earlier year if in-between ranges |
| |
|
|
|
|
In your opinion, which of the following numerical estimates best indicates the overall cost that has been expended (in present-value terms) on your building for the Initial Build, Maintenance and Utilities over the first 5-year period of its life. |
| |
|
|
|
|
In your opinion, which of the following numerical estimates best indicates the overall cost that has been expended (in present-value terms) on your building for the Initial Build, Maintenance and Utilities over the first 10-year period of its life. |
| |
|
|
|
|
In your opinion, which of the following numerical estimates best indicates the overall cost that has been expended (in present-value terms) on your building for the Initial Build, Maintenance and Utilities over the first 15-year period of its life. |
| |
|
|
|
|
In your opinion, which of the following numerical estimates best indicates the overall cost that has been expended (in present-value terms) on your building for the Initial Build, Maintenance and Utilities over the first 20-year period of its life. |
| |
|
|
|
|
In your opinion, which of the following numerical estimates best indicates the overall cost that has been expended (in present-value terms) on your building for the Initial Build, Maintenance and Utilities over the first 25-year period of its life. |
| |
|
|
|
|
Given the option selected does the sum of $2,219,434 provide a fair estimate of the capital cost of your building? |
| |
|
|
|
|
Given the option selected. does the sum of $10,360 provide a fair estimate of the Annual Maintenance cost of your building? |
| |
|
|
|
|
Given the option selected, does the sum of $63,851 provide a fair estimation of the annual cost for Electrical and Gas Energy Usage for your building |
| |
|
|
|
|
Could you please indicate the number of years since your building has been erected or underwent a major refurbishment (i.e. up to 50% of the cost required for a new-build) to the nearest 5-year period. Please select the earlier year if in-between ranges |
| |
|
|
|
|
In your opinion, which of the following numerical estimates best indicates the overall cost that has been expended (in present-value terms) on your building for the Initial Build, Maintenance and Utilities over the first 5-year period of its life. |
| |
|
|
|
|
In your opinion, which of the following numerical estimates best indicates the overall cost that has been expended (in present-value terms) on your building for the Initial Build, Maintenance and Utilities over the first 10-year period of its life. |
| |
|
|
|
|
In your opinion, which of the following numerical estimates best indicates the overall cost that has been expended (in present-value terms) on your building for the Initial Build, Maintenance and Utilities over the first 15-year period of its life. |
| |
|
|
|
|
In your opinion, which of the following numerical estimates best indicates the overall cost that has been expended (in present-value terms) on your building for the Initial Build, Maintenance and Utilities over the first 20-year period of its life. |
| |
|
|
|
|
In your opinion, which of the following numerical estimates best indicates the overall cost that has been expended (in present-value terms) on your building for the Initial Build, Maintenance and Utilities over the first 25-year period of its life. |
| |
|
|
|
|
Given the option selected does the sum of $2,960,843 provide a fair estimate of the capital cost of your building? |
| |
|
|
|
|
Given the option selected. does the sum of $10,360 provide a fair estimate of the Annual Maintenance cost of your building? |
| |
|
|
|
|
Given the option selected, does the sum of $54,388 provide a fair estimation of the annual cost for Electrical and Gas Energy Usage for your building |
| |
|
|
|
|
Could you please indicate the number of years since your building has been erected or underwent a major refurbishment (i.e. up to 50% of the cost required for a new-build) to the nearest 5-year period. Please select the earlier year if in-between ranges |
| |
|
|
|
|
In your opinion, which of the following numerical estimates best indicates the overall cost that has been expended (in present-value terms) on your building for the Initial Build, Maintenance and Utilities over the first 5-year period of its life. |
| |
|
|
|
|
In your opinion, which of the following numerical estimates best indicates the overall cost that has been expended (in present-value terms) on your building for the Initial Build, Maintenance and Utilities over the first 10-year period of its life. |
| |
|
|
|
|
In your opinion, which of the following numerical estimates best indicates the overall cost that has been expended (in present-value terms) on your building for the Initial Build, Maintenance and Utilities over the first 15-year period of its life. |
| |
|
|
|
|
In your opinion, which of the following numerical estimates best indicates the overall cost that has been expended (in present-value terms) on your building for the Initial Build, Maintenance and Utilities over the first 20-year period of its life. |
| |
|
|
|
|
In your opinion, which of the following numerical estimates best indicates the overall cost that has been expended (in present-value terms) on your building for the Initial Build, Maintenance and Utilities over the first 25-year period of its life. |
| |
|
|
|
|
Given the option selected does the sum of $2,363,886 provide a fair estimate of the capital cost of your building? |
| |
|
|
|
|
Given the option selected. does the sum of $5,806 provide a fair estimate of the Annual Maintenance cost of your building? |
| |
|
|
|
|
Given the option selected, does the sum of $53,484 provide a fair estimation of the annual cost for Electrical and Gas Energy Usage for your building |
| |
|
|
|
|
Could you please indicate the number of years since your building has been erected or underwent a major refurbishment (i.e. up to 50% of the cost required for a new-build) to the nearest 5-year period. Please select the earlier year if in-between ranges |
| |
|
|
|
|
In your opinion, which of the following numerical estimates best indicates the overall cost that has been expended (in present-value terms) on your building for the Initial Build, Maintenance and Utilities over the first 5-year period of its life. |
| |
|
|
|
|
In your opinion, which of the following numerical estimates best indicates the overall cost that has been expended (in present-value terms) on your building for the Initial Build, Maintenance and Utilities over the first 10-year period of its life. |
| |
|
|
|
|
In your opinion, which of the following numerical estimates best indicates the overall cost that has been expended (in present-value terms) on your building for the Initial Build, Maintenance and Utilities over the first 15-year period of its life. |
| |
|
|
|
|
In your opinion, which of the following numerical estimates best indicates the overall cost that has been expended (in present-value terms) on your building for the Initial Build, Maintenance and Utilities over the first 20-year period of its life. |
| |
|
|
|
|
In your opinion, which of the following numerical estimates best indicates the overall cost that has been expended (in present-value terms) on your building for the Initial Build, Maintenance and Utilities over the first 25-year period of its life. |
| |
|
|
|
|
Given the option selected does the sum of $2,219,434 provide a fair estimate of the capital cost of your building? |
| |
|
|
|
|
Given the option selected. does the sum of $10,360 provide a fair estimate of the Annual Maintenance cost of your building? |
| |
|
|
|
|
Given the option selected, does the sum of $61,348 provide a fair estimation of the annual cost for Electrical and Gas Energy Usage for your building |
| |
|
|
|
|
Could you please indicate the number of years since your building has been erected or underwent a major refurbishment (i.e. up to 50% of the cost required for a new-build) to the nearest 5-year period. Please select the earlier year if in-between ranges |
| |
|
|
|
|
In your opinion, which of the following numerical estimates best indicates the overall cost that has been expended (in present-value terms) on your building for the Initial Build, Maintenance and Utilities over the first 5-year period of its life. |
| |
|
|
|
|
In your opinion, which of the following numerical estimates best indicates the overall cost that has been expended (in present-value terms) on your building for the Initial Build, Maintenance and Utilities over the first 10-year period of its life. |
| |
|
|
|
|
In your opinion, which of the following numerical estimates best indicates the overall cost that has been expended (in present-value terms) on your building for the Initial Build, Maintenance and Utilities over the first 15-year period of its life. |
| |
|
|
|
|
In your opinion, which of the following numerical estimates best indicates the overall cost that has been expended (in present-value terms) on your building for the Initial Build, Maintenance and Utilities over the first 20-year period of its life. |
| |
|
|
|
|
In your opinion, which of the following numerical estimates best indicates the overall cost that has been expended (in present-value terms) on your building for the Initial Build, Maintenance and Utilities over the first 25-year period of its life. |
| |
|
|
|
|
Given the option selected does the sum of $2,219,434 provide a fair estimate of the capital cost of your building? |
| |
|
|
|
|
Given the option selected. does the sum of $10,360 provide a fair estimate of the Annual Maintenance cost of your building? |
| |
|
|
|
|
Given the option selected, does the sum of $63,851 provide a fair estimation of the annual cost for Electrical and Gas Energy Usage for your building |
| |
|
|
|
|
Could you please indicate the number of years since your building has been erected or underwent a major refurbishment (i.e. up to 50% of the cost required for a new-build) to the nearest 5-year period. Please select the earlier year if in-between ranges |
| |
|
|
|
|
In your opinion, which of the following numerical estimates best indicates the overall cost that has been expended (in present-value terms) on your building for the Initial Build, Maintenance and Utilities over the first 5-year period of its life. |
| |
|
|
|
|
In your opinion, which of the following numerical estimates best indicates the overall cost that has been expended (in present-value terms) on your building for the Initial Build, Maintenance and Utilities over the first 10-year period of its life. |
| |
|
|
|
|
In your opinion, which of the following numerical estimates best indicates the overall cost that has been expended (in present-value terms) on your building for the Initial Build, Maintenance and Utilities over the first 15-year period of its life. |
| |
|
|
|
|
In your opinion, which of the following numerical estimates best indicates the overall cost that has been expended (in present-value terms) on your building for the Initial Build, Maintenance and Utilities over the first 20-year period of its life. |
| |
|
|
|
|
In your opinion, which of the following numerical estimates best indicates the overall cost that has been expended (in present-value terms) on your building for the Initial Build, Maintenance and Utilities over the first 25-year period of its life. |
| |
|
|
|
|
Given the option selected does the sum of $3,179,434 provide a fair estimate of the capital cost of your building? |
| |
|
|
|
|
Given the option selected. does the sum of $10,360 provide a fair estimate of the Annual Maintenance cost of your building? |
| |
|
|
|
|
Given the option selected, does the sum of $58,429 provide a fair estimation of the annual cost for Electrical and Gas Energy Usage for your building |
| |
|
|
|
|
Could you please indicate the number of years since your building has been erected or underwent a major refurbishment (i.e. up to 50% of the cost required for a new-build) to the nearest 5-year period. Please select the earlier year if in-between ranges |
| |
|
|
|
|
In your opinion, which of the following numerical estimates best indicates the overall cost that has been expended (in present-value terms) on your building for the Initial Build, Maintenance and Utilities over the first 5-year period of its life. |
| |
|
|
|
|
In your opinion, which of the following numerical estimates best indicates the overall cost that has been expended (in present-value terms) on your building for the Initial Build, Maintenance and Utilities over the first 10-year period of its life. |
| |
|
|
|
|
In your opinion, which of the following numerical estimates best indicates the overall cost that has been expended (in present-value terms) on your building for the Initial Build, Maintenance and Utilities over the first 15-year period of its life. |
| |
|
|
|
|
In your opinion, which of the following numerical estimates best indicates the overall cost that has been expended (in present-value terms) on your building for the Initial Build, Maintenance and Utilities over the first 20-year period of its life. |
| |
|
|
|
|
In your opinion, which of the following numerical estimates best indicates the overall cost that has been expended (in present-value terms) on your building for the Initial Build, Maintenance and Utilities over the first 25-year period of its life. |
| |
|
|
|
|
Given the option selected does the sum of $1,995,007 provide a fair estimate of the capital cost of your building? |
| |
|
|
|
|
Given the option selected. does the sum of $8,760 provide a fair estimate of the Annual Maintenance cost of your building? |
| |
|
|
|
|
Given the option selected, does the sum of $65,999 provide a fair estimation of the annual cost for Electrical and Gas Energy Usage for your building |
| |
|
|
|
|
Could you please indicate the number of years since your building has been erected or underwent a major refurbishment (i.e. up to 50% of the cost required for a new-build) to the nearest 5-year period. Please select the earlier year if in-between ranges |
| |
|
|
|
|
In your opinion, which of the following numerical estimates best indicates the overall cost that has been expended (in present-value terms) on your building for the Initial Build, Maintenance and Utilities over the first 5-year period of its life. |
| |
|
|
|
|
In your opinion, which of the following numerical estimates best indicates the overall cost that has been expended (in present-value terms) on your building for the Initial Build, Maintenance and Utilities over the first 10-year period of its life. |
| |
|
|
|
|
In your opinion, which of the following numerical estimates best indicates the overall cost that has been expended (in present-value terms) on your building for the Initial Build, Maintenance and Utilities over the first 15-year period of its life. |
| |
|
|
|
|
In your opinion, which of the following numerical estimates best indicates the overall cost that has been expended (in present-value terms) on your building for the Initial Build, Maintenance and Utilities over the first 20-year period of its life. |
| |
|
|
|
|
In your opinion, which of the following numerical estimates best indicates the overall cost that has been expended (in present-value terms) on your building for the Initial Build, Maintenance and Utilities over the first 25-year period of its life. |
| |
|
|
|
|
Given the option selected does the sum of $3,920,843 provide a fair estimate of the capital cost of your building? |
| |
|
|
|
|
Given the option selected. does the sum of $10,360 provide a fair estimate of the Annual Maintenance cost of your building? |
| |
|
|
|
|
Given the option selected, does the sum of $58,429 provide a fair estimation of the annual cost for Electrical and Gas Energy Usage for your building |
| |
|
|
|
|
Could you please indicate the number of years since your building has been erected or underwent a major refurbishment (i.e. up to 50% of the cost required for a new-build) to the nearest 5-year period. Please select the earlier year if in-between ranges |
| |
|
|
|
|
In your opinion, which of the following numerical estimates best indicates the overall cost that has been expended (in present-value terms) on your building for the Initial Build, Maintenance and Utilities over the first 5-year period of its life. |
| |
|
|
|
|
In your opinion, which of the following numerical estimates best indicates the overall cost that has been expended (in present-value terms) on your building for the Initial Build, Maintenance and Utilities over the first 10-year period of its life. |
| |
|
|
|
|
In your opinion, which of the following numerical estimates best indicates the overall cost that has been expended (in present-value terms) on your building for the Initial Build, Maintenance and Utilities over the first 15-year period of its life. |
| |
|
|
|
|
In your opinion, which of the following numerical estimates best indicates the overall cost that has been expended (in present-value terms) on your building for the Initial Build, Maintenance and Utilities over the first 20-year period of its life. |
| |
|
|
|
|
In your opinion, which of the following numerical estimates best indicates the overall cost that has been expended (in present-value terms) on your building for the Initial Build, Maintenance and Utilities over the first 25-year period of its life. |
| |
|
|
|
|
Given the option selected does the sum of $2,554,756 provide a fair estimate of the capital cost of your building? |
| |
|
|
|
|
Given the option selected. does the sum of $5,806 provide a fair estimate of the Annual Maintenance cost of your building? |
| |
|
|
|
|
Given the option selected, does the sum of $63,799 provide a fair estimation of the annual cost for Electrical and Gas Energy Usage for your building |
| |
|
|
|
|
Could you please indicate the number of years since your building has been erected or underwent a major refurbishment (i.e. up to 50% of the cost required for a new-build) to the nearest 5-year period. Please select the earlier year if in-between ranges |
| |
|
|
|
|
In your opinion, which of the following numerical estimates best indicates the overall cost that has been expended (in present-value terms) on your building for the Initial Build, Maintenance and Utilities over the first 5-year period of its life. |
| |
|
|
|
|
In your opinion, which of the following numerical estimates best indicates the overall cost that has been expended (in present-value terms) on your building for the Initial Build, Maintenance and Utilities over the first 10-year period of its life. |
| |
|
|
|
|
In your opinion, which of the following numerical estimates best indicates the overall cost that has been expended (in present-value terms) on your building for the Initial Build, Maintenance and Utilities over the first 15-year period of its life. |
| |
|
|
|
|
In your opinion, which of the following numerical estimates best indicates the overall cost that has been expended (in present-value terms) on your building for the Initial Build, Maintenance and Utilities over the first 20-year period of its life. |
| |
|
|
|
|
In your opinion, which of the following numerical estimates best indicates the overall cost that has been expended (in present-value terms) on your building for the Initial Build, Maintenance and Utilities over the first 25-year period of its life. |
| |
|
|
|
|
Given the option selected does the sum of $2,131,887 provide a fair estimate of the capital cost of your building? |
| |
|
|
|
|
Given the option selected. does the sum of $10,360 provide a fair estimate of the Annual Maintenance cost of your building? |
| |
|
|
|
|
Given the option selected, does the sum of $74,165 provide a fair estimation of the annual cost for Electrical and Gas Energy Usage for your building |
| |
|
|
|
|
Could you please indicate the number of years since your building has been erected or underwent a major refurbishment (i.e. up to 50% of the cost required for a new-build) to the nearest 5-year period. Please select the earlier year if in-between ranges |
| |
|
|
|
|
In your opinion, which of the following numerical estimates best indicates the overall cost that has been expended (in present-value terms) on your building for the Initial Build, Maintenance and Utilities over the first 5-year period of its life. |
| |
|
|
|
|
In your opinion, which of the following numerical estimates best indicates the overall cost that has been expended (in present-value terms) on your building for the Initial Build, Maintenance and Utilities over the first 10-year period of its life. |
| |
|
|
|
|
In your opinion, which of the following numerical estimates best indicates the overall cost that has been expended (in present-value terms) on your building for the Initial Build, Maintenance and Utilities over the first 15-year period of its life. |
| |
|
|
|
|
In your opinion, which of the following numerical estimates best indicates the overall cost that has been expended (in present-value terms) on your building for the Initial Build, Maintenance and Utilities over the first 20-year period of its life. |
| |
|
|
|
|
In your opinion, which of the following numerical estimates best indicates the overall cost that has been expended (in present-value terms) on your building for the Initial Build, Maintenance and Utilities over the first 25-year period of its life. |
| |
|
|
|
|
Given the option selected does the sum of $2,839,203 provide a fair estimate of the capital cost of your building? |
| |
|
|
|
|
Given the option selected. does the sum of $10,360 provide a fair estimate of the Annual Maintenance cost of your building? |
| |
|
|
|
|
Given the option selected, does the sum of $61,416 provide a fair estimation of the annual cost for Electrical and Gas Energy Usage for your building |
| |
|
|
|
|
Could you please indicate the number of years since your building has been erected or underwent a major refurbishment (i.e. up to 50% of the cost required for a new-build) to the nearest 5-year period. Please select the earlier year if in-between ranges |
| |
|
|
|
|
In your opinion, which of the following numerical estimates best indicates the overall cost that has been expended (in present-value terms) on your building for the Initial Build, Maintenance and Utilities over the first 5-year period of its life. |
| |
|
|
|
|
In your opinion, which of the following numerical estimates best indicates the overall cost that has been expended (in present-value terms) on your building for the Initial Build, Maintenance and Utilities over the first 10-year period of its life. |
| |
|
|
|
|
In your opinion, which of the following numerical estimates best indicates the overall cost that has been expended (in present-value terms) on your building for the Initial Build, Maintenance and Utilities over the first 15-year period of its life. |
| |
|
|
|
|
In your opinion, which of the following numerical estimates best indicates the overall cost that has been expended (in present-value terms) on your building for the Initial Build, Maintenance and Utilities over the first 20-year period of its life. |
| |
|
|
|
|
In your opinion, which of the following numerical estimates best indicates the overall cost that has been expended (in present-value terms) on your building for the Initial Build, Maintenance and Utilities over the first 25-year period of its life. |
| |
|
|
|
|
Given the option selected does the sum of $2,715,755 provide a fair estimate of the capital cost of your building? |
| |
|
|
|
|
Given the option selected. does the sum of $10,360 provide a fair estimate of the Annual Maintenance cost of your building? |
| |
|
|
|
|
Given the option selected, does the sum of $56,219 provide a fair estimation of the annual cost for Electrical and Gas Energy Usage for your building |
| |
|
|
|
|
Could you please indicate the number of years since your building has been erected or underwent a major refurbishment (i.e. up to 50% of the cost required for a new-build) to the nearest 5-year period. Please select the earlier year if in-between ranges |
| |
|
|
|
|
In your opinion, which of the following numerical estimates best indicates the overall cost that has been expended (in present-value terms) on your building for the Initial Build, Maintenance and Utilities over the first 5-year period of its life. |
| |
|
|
|
|
In your opinion, which of the following numerical estimates best indicates the overall cost that has been expended (in present-value terms) on your building for the Initial Build, Maintenance and Utilities over the first 10-year period of its life. |
| |
|
|
|
|
In your opinion, which of the following numerical estimates best indicates the overall cost that has been expended (in present-value terms) on your building for the Initial Build, Maintenance and Utilities over the first 15-year period of its life. |
| |
|
|
|
|
In your opinion, which of the following numerical estimates best indicates the overall cost that has been expended (in present-value terms) on your building for the Initial Build, Maintenance and Utilities over the first 20-year period of its life. |
| |
|
|
|
|
In your opinion, which of the following numerical estimates best indicates the overall cost that has been expended (in present-value terms) on your building for the Initial Build, Maintenance and Utilities over the first 25-year period of its life. |
| |
|
|
|
|
Given the option selected does the sum of $3,420,014 provide a fair estimate of the capital cost of your building? |
| |
|
|
|
|
Given the option selected. does the sum of $10,360 provide a fair estimate of the Annual Maintenance cost of your building? |
| |
|
|
|
|
Given the option selected, does the sum of $43,097 provide a fair estimation of the annual cost for Electrical and Gas Energy Usage for your building |
| |
|
|
|
|
Could you please indicate the number of years since your building has been erected or underwent a major refurbishment (i.e. up to 50% of the cost required for a new-build) to the nearest 5-year period. Please select the earlier year if in-between ranges |
| |
|
|
|
|
In your opinion, which of the following numerical estimates best indicates the overall cost that has been expended (in present-value terms) on your building for the Initial Build, Maintenance and Utilities over the first 5-year period of its life. |
| |
|
|
|
|
In your opinion, which of the following numerical estimates best indicates the overall cost that has been expended (in present-value terms) on your building for the Initial Build, Maintenance and Utilities over the first 10-year period of its life. |
| |
|
|
|
|
In your opinion, which of the following numerical estimates best indicates the overall cost that has been expended (in present-value terms) on your building for the Initial Build, Maintenance and Utilities over the first 15-year period of its life. |
| |
|
|
|
|
In your opinion, which of the following numerical estimates best indicates the overall cost that has been expended (in present-value terms) on your building for the Initial Build, Maintenance and Utilities over the first 20-year period of its life. |
| |
|
|
|
|
In your opinion, which of the following numerical estimates best indicates the overall cost that has been expended (in present-value terms) on your building for the Initial Build, Maintenance and Utilities over the first 25-year period of its life. |
| |
|
|
|
|
Given the option selected does the sum of $2,860,207 provide a fair estimate of the capital cost of your building? |
| |
|
|
|
|
Given the option selected. does the sum of $5,806 provide a fair estimate of the Annual Maintenance cost of your building? |
| |
|
|
|
|
Given the option selected, does the sum of $45,925 provide a fair estimation of the annual cost for Electrical and Gas Energy Usage for your building |
| |
|
|
|
|
Could you please indicate the number of years since your building has been erected or underwent a major refurbishment (i.e. up to 50% of the cost required for a new-build) to the nearest 5-year period. Please select the earlier year if in-between ranges |
| |
|
|
|
|
In your opinion, which of the following numerical estimates best indicates the overall cost that has been expended (in present-value terms) on your building for the Initial Build, Maintenance and Utilities over the first 5-year period of its life. |
| |
|
|
|
|
In your opinion, which of the following numerical estimates best indicates the overall cost that has been expended (in present-value terms) on your building for the Initial Build, Maintenance and Utilities over the first 10-year period of its life. |
| |
|
|
|
|
In your opinion, which of the following numerical estimates best indicates the overall cost that has been expended (in present-value terms) on your building for the Initial Build, Maintenance and Utilities over the first 15-year period of its life. |
| |
|
|
|
|
In your opinion, which of the following numerical estimates best indicates the overall cost that has been expended (in present-value terms) on your building for the Initial Build, Maintenance and Utilities over the first 20-year period of its life. |
| |
|
|
|
|
In your opinion, which of the following numerical estimates best indicates the overall cost that has been expended (in present-value terms) on your building for the Initial Build, Maintenance and Utilities over the first 25-year period of its life. |
| |
|
|
|
|
Given the option selected does the sum of $2,719,567 provide a fair estimate of the capital cost of your building? |
| |
|
|
|
|
Given the option selected. does the sum of $10,360 provide a fair estimate of the Annual Maintenance cost of your building? |
| |
|
|
|
|
Given the option selected, does the sum of $47,849 provide a fair estimation of the annual cost for Electrical and Gas Energy Usage for your building |
| |
|
|
|
|
Could you please indicate the number of years since your building has been erected or underwent a major refurbishment (i.e. up to 50% of the cost required for a new-build) to the nearest 5-year period. Please select the earlier year if in-between ranges |
| |
|
|
|
|
In your opinion, which of the following numerical estimates best indicates the overall cost that has been expended (in present-value terms) on your building for the Initial Build, Maintenance and Utilities over the first 5-year period of its life. |
| |
|
|
|
|
In your opinion, which of the following numerical estimates best indicates the overall cost that has been expended (in present-value terms) on your building for the Initial Build, Maintenance and Utilities over the first 10-year period of its life. |
| |
|
|
|
|
In your opinion, which of the following numerical estimates best indicates the overall cost that has been expended (in present-value terms) on your building for the Initial Build, Maintenance and Utilities over the first 15-year period of its life. |
| |
|
|
|
|
In your opinion, which of the following numerical estimates best indicates the overall cost that has been expended (in present-value terms) on your building for the Initial Build, Maintenance and Utilities over the first 20-year period of its life. |
| |
|
|
|
|
In your opinion, which of the following numerical estimates best indicates the overall cost that has been expended (in present-value terms) on your building for the Initial Build, Maintenance and Utilities over the first 25-year period of its life. |
| |
|
|
|
|
Given the option selected does the sum of $2,715,755 provide a fair estimate of the capital cost of your building? |
| |
|
|
|
|
Given the option selected. does the sum of $10,360 provide a fair estimate of the Annual Maintenance cost of your building? |
| |
|
|
|
|
Given the option selected, does the sum of $56,291 provide a fair estimation of the annual cost for Electrical and Gas Energy Usage for your building |
| |
|
|
|
|
Could you please indicate the number of years since your building has been erected or underwent a major refurbishment (i.e. up to 50% of the cost required for a new-build) to the nearest 5-year period. Please select the earlier year if in-between ranges |
| |
|
|
|
|
In your opinion, which of the following numerical estimates best indicates the overall cost that has been expended (in present-value terms) on your building for the Initial Build, Maintenance and Utilities over the first 5-year period of its life. |
| |
|
|
|
|
In your opinion, which of the following numerical estimates best indicates the overall cost that has been expended (in present-value terms) on your building for the Initial Build, Maintenance and Utilities over the first 10-year period of its life. |
| |
|
|
|
|
In your opinion, which of the following numerical estimates best indicates the overall cost that has been expended (in present-value terms) on your building for the Initial Build, Maintenance and Utilities over the first 15-year period of its life. |
| |
|
|
|
|
In your opinion, which of the following numerical estimates best indicates the overall cost that has been expended (in present-value terms) on your building for the Initial Build, Maintenance and Utilities over the first 20-year period of its life. |
| |
|
|
|
|
In your opinion, which of the following numerical estimates best indicates the overall cost that has been expended (in present-value terms) on your building for the Initial Build, Maintenance and Utilities over the first 25-year period of its life. |
| |
|
|
|
|
Given the option selected does the sum of $3,784,358 provide a fair estimate of the capital cost of your building? |
| |
|
|
|
|
Given the option selected. does the sum of $10,360 provide a fair estimate of the Annual Maintenance cost of your building? |
| |
|
|
|
|
Given the option selected, does the sum of $49,429 provide a fair estimation of the annual cost for Electrical and Gas Energy Usage for your building |
| |
|
|
|
|
Could you please indicate the number of years since your building has been erected or underwent a major refurbishment (i.e. up to 50% of the cost required for a new-build) to the nearest 5-year period. Please select the earlier year if in-between ranges |
| |
|
|
|
|
In your opinion, which of the following numerical estimates best indicates the overall cost that has been expended (in present-value terms) on your building for the Initial Build, Maintenance and Utilities over the first 5-year period of its life. |
| |
|
|
|
|
In your opinion, which of the following numerical estimates best indicates the overall cost that has been expended (in present-value terms) on your building for the Initial Build, Maintenance and Utilities over the first 10-year period of its life. |
| |
|
|
|
|
In your opinion, which of the following numerical estimates best indicates the overall cost that has been expended (in present-value terms) on your building for the Initial Build, Maintenance and Utilities over the first 15-year period of its life. |
| |
|
|
|
|
In your opinion, which of the following numerical estimates best indicates the overall cost that has been expended (in present-value terms) on your building for the Initial Build, Maintenance and Utilities over the first 20-year period of its life. |
| |
|
|
|
|
In your opinion, which of the following numerical estimates best indicates the overall cost that has been expended (in present-value terms) on your building for the Initial Build, Maintenance and Utilities over the first 25-year period of its life. |
| |
|
|
|
|
Given the option selected does the sum of $4,525,767 provide a fair estimate of the capital cost of your building? |
| |
|
|
|
|
Given the option selected. does the sum of $10,360 provide a fair estimate of the Annual Maintenance cost of your building? |
| |
|
|
|
|
Given the option selected, does the sum of $49,128 provide a fair estimation of the annual cost for Electrical and Gas Energy Usage for your building |
| |
|
|
|
|
Could you please indicate the number of years since your building has been erected or underwent a major refurbishment (i.e. up to 50% of the cost required for a new-build) to the nearest 5-year period. Please select the earlier year if in-between ranges |
| |
|
|
|
|
In your opinion, which of the following numerical estimates best indicates the overall cost that has been expended (in present-value terms) on your building for the Initial Build, Maintenance and Utilities over the first 5-year period of its life. |
| |
|
|
|
|
In your opinion, which of the following numerical estimates best indicates the overall cost that has been expended (in present-value terms) on your building for the Initial Build, Maintenance and Utilities over the first 10-year period of its life. |
| |
|
|
|
|
In your opinion, which of the following numerical estimates best indicates the overall cost that has been expended (in present-value terms) on your building for the Initial Build, Maintenance and Utilities over the first 15-year period of its life. |
| |
|
|
|
|
In your opinion, which of the following numerical estimates best indicates the overall cost that has been expended (in present-value terms) on your building for the Initial Build, Maintenance and Utilities over the first 20-year period of its life. |
| |
|
|
|
|
In your opinion, which of the following numerical estimates best indicates the overall cost that has been expended (in present-value terms) on your building for the Initial Build, Maintenance and Utilities over the first 25-year period of its life. |
| |
|
|
|
|
Given the option selected does the sum of $2,604,506 provide a fair estimate of the capital cost of your building? |
| |
|
|
|
|
Given the option selected. does the sum of $8,760 provide a fair estimate of the Annual Maintenance cost of your building? |
| |
|
|
|
|
Given the option selected, does the sum of $47,717 provide a fair estimation of the annual cost for Electrical and Gas Energy Usage for your building |
| |
|
|
|
|
Could you please indicate the number of years since your building has been erected or underwent a major refurbishment (i.e. up to 50% of the cost required for a new-build) to the nearest 5-year period. Please select the earlier year if in-between ranges |
| |
|
|
|
|
In your opinion, which of the following numerical estimates best indicates the overall cost that has been expended (in present-value terms) on your building for the Initial Build, Maintenance and Utilities over the first 5-year period of its life. |
| |
|
|
|
|
In your opinion, which of the following numerical estimates best indicates the overall cost that has been expended (in present-value terms) on your building for the Initial Build, Maintenance and Utilities over the first 10-year period of its life. |
| |
|
|
|
|
In your opinion, which of the following numerical estimates best indicates the overall cost that has been expended (in present-value terms) on your building for the Initial Build, Maintenance and Utilities over the first 15-year period of its life. |
| |
|
|
|
|
In your opinion, which of the following numerical estimates best indicates the overall cost that has been expended (in present-value terms) on your building for the Initial Build, Maintenance and Utilities over the first 20-year period of its life. |
| |
|
|
|
|
In your opinion, which of the following numerical estimates best indicates the overall cost that has been expended (in present-value terms) on your building for the Initial Build, Maintenance and Utilities over the first 25-year period of its life. |
| |
|
|
|
|
Given the option selected does the sum of $3,564,506 provide a fair estimate of the capital cost of your building? |
| |
|
|
|
|
Given the option selected. does the sum of $8,760 provide a fair estimate of the Annual Maintenance cost of your building? |
| |
|
|
|
|
Given the option selected, does the sum of $44,390 provide a fair estimation of the annual cost for Electrical and Gas Energy Usage for your building |
| |
|
|
|
|
Could you please indicate the number of years since your building has been erected or underwent a major refurbishment (i.e. up to 50% of the cost required for a new-build) to the nearest 5-year period. Please select the earlier year if in-between ranges |
| |
|
|
|
|
In your opinion, which of the following numerical estimates best indicates the overall cost that has been expended (in present-value terms) on your building for the Initial Build, Maintenance and Utilities over the first 5-year period of its life. |
| |
|
|
|
|
In your opinion, which of the following numerical estimates best indicates the overall cost that has been expended (in present-value terms) on your building for the Initial Build, Maintenance and Utilities over the first 10-year period of its life. |
| |
|
|
|
|
In your opinion, which of the following numerical estimates best indicates the overall cost that has been expended (in present-value terms) on your building for the Initial Build, Maintenance and Utilities over the first 15-year period of its life. |
| |
|
|
|
|
In your opinion, which of the following numerical estimates best indicates the overall cost that has been expended (in present-value terms) on your building for the Initial Build, Maintenance and Utilities over the first 20-year period of its life. |
| |
|
|
|
|
In your opinion, which of the following numerical estimates best indicates the overall cost that has been expended (in present-value terms) on your building for the Initial Build, Maintenance and Utilities over the first 25-year period of its life. |
| |
|
|
|
|
Given the option selected does the sum of $4,340,325 provide a fair estimate of the capital cost of your building? |
| |
|
|
|
|
Given the option selected. does the sum of $8,760 provide a fair estimate of the Annual Maintenance cost of your building? |
| |
|
|
|
|
Given the option selected, does the sum of $50,592 provide a fair estimation of the annual cost for Electrical and Gas Energy Usage for your building |
| |
|
|
|
|
Could you please indicate the number of years since your building has been erected or underwent a major refurbishment (i.e. up to 50% of the cost required for a new-build) to the nearest 5-year period. Please select the earlier year if in-between ranges |
| |
|
|
|
|
In your opinion, which of the following numerical estimates best indicates the overall cost that has been expended (in present-value terms) on your building for the Initial Build, Maintenance and Utilities over the first 5-year period of its life. |
| |
|
|
|
|
In your opinion, which of the following numerical estimates best indicates the overall cost that has been expended (in present-value terms) on your building for the Initial Build, Maintenance and Utilities over the first 10-year period of its life. |
| |
|
|
|
|
In your opinion, which of the following numerical estimates best indicates the overall cost that has been expended (in present-value terms) on your building for the Initial Build, Maintenance and Utilities over the first 15-year period of its life. |
| |
|
|
|
|
In your opinion, which of the following numerical estimates best indicates the overall cost that has been expended (in present-value terms) on your building for the Initial Build, Maintenance and Utilities over the first 20-year period of its life. |
| |
|
|
|
|
In your opinion, which of the following numerical estimates best indicates the overall cost that has been expended (in present-value terms) on your building for the Initial Build, Maintenance and Utilities over the first 25-year period of its life. |
| |
|
|
|
|
Given the option selected does the sum of $4,484,777 provide a fair estimate of the capital cost of your building? |
| |
|
|
|
|
Given the option selected. does the sum of $4,206 provide a fair estimate of the Annual Maintenance cost of your building? |
| |
|
|
|
|
Given the option selected, does the sum of $40,226 provide a fair estimation of the annual cost for Electrical and Gas Energy Usage for your building |
| |
|
|
|
|
Could you please indicate the number of years since your building has been erected or underwent a major refurbishment (i.e. up to 50% of the cost required for a new-build) to the nearest 5-year period. Please select the earlier year if in-between ranges |
| |
|
|
|
|
In your opinion, which of the following numerical estimates best indicates the overall cost that has been expended (in present-value terms) on your building for the Initial Build, Maintenance and Utilities over the first 5-year period of its life. |
| |
|
|
|
|
In your opinion, which of the following numerical estimates best indicates the overall cost that has been expended (in present-value terms) on your building for the Initial Build, Maintenance and Utilities over the first 10-year period of its life. |
| |
|
|
|
|
In your opinion, which of the following numerical estimates best indicates the overall cost that has been expended (in present-value terms) on your building for the Initial Build, Maintenance and Utilities over the first 15-year period of its life. |
| |
|
|
|
|
In your opinion, which of the following numerical estimates best indicates the overall cost that has been expended (in present-value terms) on your building for the Initial Build, Maintenance and Utilities over the first 20-year period of its life. |
| |
|
|
|
|
In your opinion, which of the following numerical estimates best indicates the overall cost that has been expended (in present-value terms) on your building for the Initial Build, Maintenance and Utilities over the first 25-year period of its life. |
| |
|
|
|
|
What will you consider the most uncertain factor in estimating the whole-life cost of your building? |
| |
|
|
|
|
|
Did you consider the long-term running cost (Energy Cost, Maintenance Cost, Utility Cost etc) of the building prior to making an investment decision on the respective components that are present in the built facility? |
| |
|
|
|
|
|
In the occasion of a major refurbishment, which of the following options may be most appropriate for your building? |
| |
|
|
|
|
|
Given a decision for a new-build which features will appeal to you as most cost-saving, among the following options? |
| |
|
|
|
|
Given a decision for a new-build which features will appeal to you as most cost-saving, among the following options? |
| |
|
|
|
|