This free survey is powered by

General Survey

General Survey
0%
Exit Survey
 
 
Hello: As a part of our commitment to continued growth, you are invited to participate in our survey. Your survey responses will be strictly confidential and data from this research will be reported only in the aggregate. Your information will be coded and will remain confidential. If you have questions at any time about the survey or the procedures, you may contact Sonya Wiebe at 250-793-5311 or by email at [email protected]. Thank you very much for your time and support. Please start with the survey now by clicking on the Continue button below.
 
 
 
* First Name : 
* Last Name : 
 
 
 
Does the RTN match the ISA?
yes
no
 
 
 
Select all options for connecting survey to ISA:
 
set up base on ISA monument
 
do autonomous setup and tie ISA monument
 
set up base on found evidence
 
use RTN to tie ISA monument
 
Other
 

 
 
 
Describe how to check that you have properly connected a survey to ISA
   
 
 
 
What is the tolerance for check shots?
 
 
 
What is your first step after setup and setting BS, before layout?
 
Call your PM with coordinates
 
Check to known point
 
Find a consultant and confirm locations
 
Check the angle of the sun on the prisms
 
 
 
When do you take photos?
 
when unsure
 
when asked to by passers by
 
when see something unusual
 
when its pretty
 
caps
 
when there is significant rust on a cap
 
strata buildings
 
Other
 

 
 
 
Explain how to label a guard stake
   
 
 
 
What happens if foreman requests changes on site?
 
call PM to check if it’s ok
 
write changes in notes
 
hurry to ensure you get original job done first
 
ignore the foreman
 
show foreman any calculations and have them check numbers
 
get signature/initials on changes in field notes
 
Other
 

 
 
 
How do you tell UTM versus ground?
 
-6,000,00 N and -600,000 E
 
-6,000,000 N and -600,00 E
 
-6,000,000 N and -600,000 E
 
6,000,000 N and 600,000 E

 
 
 
Which jobs require a sketch?
   
 
 
 
When to double in?
   
 
 
 
Do you need to show monuments searched for and not found?
yes
no
 
 
 
When do you show delta values?
 
Every shot
 
Every check
 
Every significant shot
 
Every shot you are unsure of
 
 
 
When should notes and data be uploaded?
   
 
 
 
How many points should be included in a site calibration?
 
5 maybe 6
 
1 maybe 2
 
2 maybe 3
 
 
 
What setting is used for doing conventional work with Trimble controller?
   
 
 
 
Setting for doing site calibration?
 
“no datum, no projection”
 
“scale factor only”, set to 1.0
 
“scale factor only”, set to 10
 
 
 
Every point laid out (spike, IP, etc.) must be re-tied from a separate setup?
 
True
 
False
 
 
 
What is the best method for staying steady? (Select all that apply)?
 
a firm grip
 
steady sticks
 
getting close to ground with a plumb bob
 
using a flat bottom pole
 
Other
 

 
 
 
It is important to pay attention on the drive into site to ensure I know how to leave in an emergency
true
false